A full height media wall looks simple on a mood board and complicated on site. It spans floor to ceiling, carries a television, hides cables, mixes open display with closed storage and often sits next to fireplace, joinery or lighting lines that have to line up. Most of the rework we see on these jobs comes from an enquiry that never said what the wall actually had to do. This guide sets out the fields worth filling in before you request a quotation for Santerson Full Height Media Walls, so the drawing, the price and the finished wall all describe the same thing.
Why media walls need a specification, not a photo
Full height media walls sit in the Interior Fixtures range and are made to project-specific dimensions and finish options rather than ordered from fixed sizes. That flexibility is the point of buying a built-in wall instead of a ready-made cabinet, but it only works if the buyer hands over decisions instead of an image. A photograph tells a manufacturer the mood; it does not tell them the recess depth for your television, which side the soundbar sits on, or whether the ceiling is plasterboard or a raked timber soffit.
A clear specification also protects the commercial side. As one of the services in our one-stop solution, media walls are produced alongside cabinetry, panelling, doors and other finishes for the same building, so a wall priced without dimensions or hardware detail is a wall that gets repriced later. When every field below is answered once, variations during production stay small and the delivery package can be planned properly.
Field 1: The opening and the room
Start with the wall itself, because everything else hangs off it. Record:
- Overall run width and finished ceiling height at the left end, right end and centre, since ceilings in villas and renovated homes are rarely level across a long run.
- Total depth from the finished wall face, including any rebate, skirting, architrave or service chase that the carcass has to clear.
- What sits above: a bulkhead, curtain box, projector housing or cove lighting, and how high each of those starts.
- Substrate behind the wall and whether it can carry a wall-hung television, or whether the carcass has to take the load through its own structure.
- Whether the wall meets another finish, such as Santerson Textured Panels or stone cladding, and which material should stop where.
Field 2: Layout and storage mix
Draw the elevation in zones before choosing doors. Mark the television zone, the equipment zone, closed storage, open display and anything you want hidden. A few practical questions settle most layouts:
- Closed or open? If you want both, decide the split rather than leaving it to the drawing stage; our Santerson Storage & Display Combo page is a useful reference for mixed arrangements.
- Shelf spans you intend to load heavily, such as books or ceramics, so shelf thickness and span can be specified rather than assumed.
- Doors, drawers or flaps in each bay, and whether handles are acceptable or the front should read clean.
- Whether a sliding front is wanted to conceal the screen. If so, look at Santerson Sliding Panel TV Systems, because panel travel, track type and clearance need confirming before the carcass is fixed.
- Cable routes for power, optical, HDMI and any antenna feed, including where those outlets land relative to the screen centre.
Field 3: Materials, finish and hardware
State the finish by name and by location. A body in one board and a front in another is normal, but it should be written down. Useful references from our range include Santerson Matte Lacquer Panels for flush fronts and Santerson Stone & Marble Panels where the surround needs to match a stone finish elsewhere in the room. For each zone, note:
- Carcass material and colour, front material and colour, and whether edges are matched or contrasted.
- Glass type in any display bay, such as clear, frosted or smoked, plus shelf material inside it.
- Hinge and runner quality expectations, soft closing or push open, and any hardware you already use on other joinery in the project so the whole building matches.
- Visible metalwork: profile colour for frames, handles or recessed pulls.
If your project needs a finish that is not in the standard range, our Custom & OEM Service covers bespoke finishes, textures and prototyping. Send the reference as early as possible so sampling does not sit on the critical path.
Field 4: Lighting and electrical
Integrated lighting is where specification gaps show up fastest on site. If your wall includes LED strips inside niches or glass bays, use Santerson Integrated LED Media Units as the reference and specify colour temperature, dimming method, driver location and access panel size. Drivers need a reachable position, not a sealed cavity. Then confirm who supplies and installs the electrical work: we build the joinery to receive it, while on-site wiring is normally done by the local contractor under your project team's coordination.
Field 5: Delivery, installation and handover
Built-in walls travel badly when they are treated as loose furniture, so include logistics in the specification rather than leaving it to the shipping stage. Our Logistics & Door-to-Door Delivery service covers freight forwarding, packaging and container loading, customs paperwork and tracking; our Installation & After-sales Support page describes on-site installation, inspection with snag lists, spare parts and maintenance. For a media wall, tell us the delivery address access, lift or stair constraints, floor level and whether other trades will be in the room when the panels arrive.
A specification sheet you can copy
| Item | What to write |
|---|---|
| Wall identity | Room, wall reference from your drawing, elevation number |
| Dimensions | Run width, ceiling heights at each end, total depth, rebate depths |
| Screen zone | Screen model or size range, mounting method, clearance behind, viewing height |
| Equipment zone | Devices to be housed, ventilation need, remote-control requirement, door type |
| Storage mix | Closed and open bays by width and height, shelf loads, drawer count |
| Fronts and finish | Carcass material and colour, front material and colour, edge treatment |
| Hardware | Hinges, runners, handles or push open, soft close requirement |
| Lighting | Niche and glass bay lighting, colour temperature, dimming, driver access |
| Interfaces | Adjacent finishes, fireplace or bulkhead lines, skirting treatment |
| Site and logistics | Delivery address, access limits, floor level, install window, local electrical scope |
Sending the enquiry
Attach the room elevation, the table above filled in, and your target site date. If you are furnishing several rooms or a whole villa, send the media wall together with the related built-ins so carcass materials, hardware and finishes are priced as one package; that is how we handle full fit-outs through our Turnkey Solutions for villas, hospitality and offices. As a China-based furniture and building materials manufacturer, SANTERSON produces these walls to the dimensions and finishes you specify and ships them with the rest of the project package.