Interior doors rarely decide a project on their own, but they are one of the items most likely to stall it. A door schedule that arrives late, openings measured from outdated drawings, or finishes approved in one room and delivered in another can hold up handover for weeks. Before you place an order, the question is not only whether a supplier sells standard interior hinged doors, but whether they can carry your requirements through measurement, production, shipping and installation without losing detail along the way.
The checklist below is written for buyers, project managers and contractors specifying hinged internal doors for villas, apartments, hotels and offices. Work through it during supplier evaluation, not after the purchase order is signed.
1. Can they produce to your openings, or only to a fixed catalogue?
On most fit-out jobs, at least some openings will not match standard sizes: ceilings differ between levels, wall build-ups change where services run, and design intent shifts during construction. A supplier who can only quote from fixed dimensions will push you to alter the opening, which means extra works on site and a knock-on cost that never appears on the door quotation.
Ask directly whether sizing is made to measure, and how the measurement is confirmed. Our Standard Interior Hinged Doors line is configured per project — dimensions, layout, material and finish are specified against your drawings, and each order is confirmed dimension by dimension before production. That confirmation step matters more than the phrase "custom" itself: request a written production drawing or opening schedule with the quotation, so both sides sign off on the same numbers.
2. Do they quote the whole door set, or just the leaf?
A door that arrives without the right frame, architrave, ironmongery clearance or sealing detail is an incomplete delivery. When comparing quotations, check which elements are itemised:
- Door leaf construction and core, stated in a way you can compare between suppliers
- Frame size and material, matched to the actual wall thickness at each opening
- Architraves, glazing beads and any matching panelling or concealed detailing
- Hinges, locks, handles and door closers, including whether ironmongery is supplied by you or by them
- Finishes: paint, laminate, veneer or lacquer, with a physical sample rather than a colour code
If two quotations cannot be compared line for line, the cheaper one is usually the one that left something out. Where we supply related door types — flush hinged doors, classic panel hinged doors or wood veneer hinged doors — we ask for the same itemised schedule so that rooms mixing door styles stay consistent in finish and ironmongery.
3. Is one party accountable from drawing to handover?
Doors sit at the junction of several trades: joinery, wall finishes, flooring levels, hardware and fire strategy where applicable. Splitting those responsibilities across several vendors multiplies the number of interfaces where errors appear. During evaluation, ask who signs off the door schedule, who answers queries during production, and who is responsible if a dimension is wrong on site.
SANTERSON works as a one-stop furniture and building materials supplier, so doors are specified alongside the cabinetry, wall panelling, flooring and lighting they have to match. That reduces the risk of a door finish that reads differently against a neighbouring wardrobe front, and it means one coordination point from design through production, packing and delivery rather than several vendors each holding part of the information.
4. Can they show comparable projects, not just product photos?
Product photography tells you very little about whether a supplier can hold finish consistency across forty doors in one building. Ask for completed projects of the same type — villa fit-outs, apartment blocks, hotel rooms — and look for details rather than wide-angle renders: line alignment between adjacent doors, consistent grain direction on veneered leaves, clean junctions at skirting and architrave.
We publish project references including villa and housing work in Sydney, Melbourne, Perth and Willoughby. Ask which scope each project covered and whether doors were supplied as part of a wider fit-out; that context tells you more than a catalogue image.
5. How are doors packed, shipped and received?
Doors are high-value, low-tolerance items that travel badly if they are packed as an afterthought. Concrete questions to ask:
- How are leaves and frames separated, edged and protected, and how is each unit labelled against the opening schedule?
- Can you follow the shipment, and what documents come with it — packing list, commercial invoice, customs paperwork?
- Which Incoterms apply to your site, and who arranges inland delivery from port or depot?
- What happens if a unit arrives damaged or a size is wrong: how fast is a replacement produced and shipped?
Every SANTERSON order ships with paperwork prepared for import clearance and each item labelled to the confirmed schedule, so the site team can match deliveries to rooms instead of guessing. Transit terms and schedules are agreed per project rather than quoted as a blanket promise.
6. What support exists at installation and after?
Even a correct door set needs competent fitting. Ask whether the supplier provides fitting instructions, an on-site guide or installation support, how defects are logged and closed out, and what happens with spare parts years later — replacement leaves and frames in a matching finish are difficult to reproduce once a project is closed.
We provide installation support and after-sales service including inspection of snags and spare-parts supply. Warranty terms, response arrangements and installer availability vary by location, so we confirm these for your specific site before the order rather than pointing at standard text.
7. What does their documentation actually contain?
A serious supplier's paperwork is easy to read and hard to misinterpret. Before committing, compare what each vendor sends:
| Evaluation point | Weak answer | Answer you can rely on |
|---|---|---|
| Sizing | "Standard sizes available" | Made-to-measure schedule per opening, confirmed in writing before production |
| Scope | Price per leaf only | Leaf, frame, architrave and ironmongery itemised separately |
| Finish | Colour name or code | Physical sample plus a named finish system for the whole set |
| Coordination | Each trade quoted separately | Doors specified with matching joinery, panelling and finishes under one scope |
| Delivery | "We ship worldwide" | Packing method, labelling to the schedule, documents and Incoterms for your site |
| After handover | Silence after payment | Named contact, snag process, spare-parts route confirmed for your location |
Three red flags worth acting on: a quotation that prices only the door leaf; any supplier who will not confirm dimensions in writing before production starts; and finish approval based on a screen image instead of a physical sample. Each one is cheap to fix at the enquiry stage and expensive to fix after delivery.
A practical next step
Send the same door schedule to three suppliers and compare what comes back, not just the number on it. If you want a benchmark, send us your opening list, room-by-room finish intent and programme dates through our contact page. We will return an itemised quotation with confirmed dimensions and finish samples, so you can judge the specification against your requirements line by line.