Clear glass with an aluminum frame looks simple on a rendering. It is one of the most specification-sensitive items in a bedroom fit-out, because a single line drawing carries no information about glass type, frame profile, door geometry or site conditions. Procurement teams who request this wardrobe range by name alone receive quotations that cannot be compared and production drawings that cannot be approved. The document set below is what we need back from a project team before Clear Glass Aluminum Frame Wardrobes go into manufacturing.

1. Room data and the opening itself

These are built-to-size units, so the starting point is a measured record of the opening rather than a nominal room size. For every wardrobe position, send:

  • Width, height and depth at high, middle and low points — floors and ceilings in renovation work are rarely square, and we build to the smallest clearance unless you instruct otherwise.
  • Finished floor level and finished ceiling or soffit level, stated as finishes already installed or still to come.
  • Skirting, architrave, cornice and any protruding architrave depth that affects how the carcass sits against the wall.
  • Position of electrical sockets, switches, air-conditioning grilles, sprinkler heads, downlights and curtain boxes relative to the wardrobe line.
  • Whether the unit is built into a niche, butted between walls, or free-standing against a single wall.

For villa and apartment packages, list these values per room type rather than per unit. A three-bedroom layout repeated across a development should be documented once, with exceptions called out separately.

2. Door system and glass specification

The door is where most change orders originate. Document the operating system first, because it determines clearance, track detail and hardware.

Item to documentWhy procurement needs it in writing
Door type: sliding, hinged, folding or walk-in openSliding doors need track depth and overlap; hinged doors need swing clearance and hinge loading. The same opening produces different carcass dimensions under each option.
Glass type and colourClear, bronze, frosted and smoked glass are separate specifications with different prices and different visual results against interior lighting. Specify clear glass explicitly if that is the intent.
Glass thickness and safety requirementSafety-treated glazing is a project decision, not a supplier assumption. Record who specified it and for which areas.
Frame finish and profileAluminum frame colour and surface treatment should be recorded against an approved sample reference, since screen renderings shift apparent tone.
Handle or edge-pull detailIntegrated profile pulls and applied handles change door spacing and hardware cost.
Door count and leaf widthVery wide leaves affect track loading and daily usability; note the maximum leaf width your team has accepted.

If a project mixes finishes across room types — clear glass in master bedrooms, Frosted Glass Aluminum Frame Wardrobes in shared rooms — record the mapping in a schedule, not in e-mail threads.

3. Internal layout and storage planning

Glass fronts show what is inside, so internal planning is part of the appearance specification rather than an afterthought. For each unit, document:

  • Hanging zones: short-hang and long-hang heights, rail count and rail positions.
  • Shelf count, shelf spacing and whether shelves are fixed or adjustable.
  • Drawer blocks: number of drawers, drawer front material, and whether interior dividers are required.
  • Open display niches versus closed storage, and which items are meant to be visible through the glass.
  • Integrated lighting: sensor type, cable route, transformer location and switching arrangement.
  • Accessory list — trouser rack, jewellery tray, shoe shelves, luggage space, mirror panel — with quantities.

Where the layout differs between unit types in the same building, issue a per-type interior elevation. Related layouts such as Drawer Focused Modular Wardrobes can be used as a reference for drawer-heavy room types, provided the dimensions are re-stated for your opening.

4. Interface and site-condition notes

Wardrobes fail at interfaces more often than in the carcass. Put these conditions on paper before production release:

  • Wall construction and fixing method — masonry, lightweight partition, or timber framing, plus whether noggins or reinforcement are needed for top-fixing or tall units.
  • Floor covering at the threshold: tiled, carpeted or floating floor under sliding tracks affects track height and transition detail.
  • Cornice or curtain rail conflict above the unit.
  • Adjoining joinery — vanities, wall panelling, bedside niches — with the sequence of installation stated.
  • Any site tolerance allowance your team will accept, and who signs off on-site measurement before manufacture.

5. Commercial and delivery documentation

The technical file only converts into a clean order when the commercial record matches it. Keep in one pack:

  • A room-by-room schedule with unit reference, quantity, dimensions, glass type and frame finish.
  • Approved sample references for glass, frame finish and interior board colour, each signed and dated.
  • Named approval authority for the production drawing, so comments from several consultants do not arrive as conflicting instructions.
  • Delivery address per phase, packaging standard, and who receives and checks cartons on site.
  • Installation responsibility — our Furniture Installation and After-sales Support team or your own contractor — with the fixing details agreed in advance.
  • A change-control rule: any revision after drawing approval is re-priced and re-dated before it enters production.

Before you send an enquiry

Attach the measured opening schedule, the door-type decision, the glass and finish selection, and the internal layout for at least one representative room type. With those four items, we can return firm dimensions, a comparable quotation and production drawings. Without them, quotations for clear glass aluminum frame wardrobes are not directly comparable between suppliers.

Glass colour names and frame finishes on this site describe product options; confirm the finish you want against a physical sample before approving production drawings. Dimensions and internal configurations shown in project material are indicative — each unit is built to your measured opening and approved layout.

SANTERSON manufactures Aluminum Frame Glass Wardrobes and other Built-in Furniture for villa, hotel and apartment projects, with made-to-measure sizing, finish selection, door-to-door logistics and installation support. Send your wardrobe schedule and measured openings and our project team will review them against the specification above.