A swim spa looks straightforward on a specification sheet: a shell, some jets, a set of dimensions. On site it is a different matter. It arrives by sea and road, needs a prepared base and an electrical supply, and it sits next to the poolside furniture being delivered under other purchase orders. Procurement teams who document those interfaces before the order is placed usually avoid the expensive version of the same conversation later. The checklist below follows one catalogue item, Outdoor Swim Spa WS-S06B-T, so each line can be traced back to a published product page rather than to general advice.

Why the swim spa needs its own documentation pack

In villa and hospitality projects the water feature is rarely bought in isolation. It shares a boundary with decking, drainage and lighting, and those trades usually sit under different purchase orders. A single document set that records the unit's footprint, services and selected options gives every party the same reference: the same model code, the same dimensions, the same equipment list. When a change is requested later, it can be written against a line item instead of an assumption.

That matters most where the spa crosses a border. Freight and import paperwork have to be planned around a shell that cannot be broken down into smaller parcels, so documenting the unit as delivered, not as imagined, is what keeps a programme intact.

What the catalogue entry records

The published entry for this model lists an overall shell of 5800 x 2200 x 1420 mm, one control system, one swim training system, one water pump and one filter pump. Jet count is recorded as 40, with three LED lights plus 26 smaller LED lights, and total power is listed at 8.75 kW. The features shown are water jets, temperature setting, LED lighting, ozone and a swim training system.

ItemCatalogue entry for WS-S06B-T
Overall dimensions5800 x 2200 x 1420 mm
Control system1 set
Swim training system1 set
Water pump / filter pump1 pc / 1 pc
Jets40 pcs
Lighting3 LED lights; 26 small LED lights
Total power (as listed)8.75 kW
Features shownWater jets, temperature setting, LED lighting, ozone, swim training system

Treat those figures as the starting point of a conversation rather than a finished specification. The catalogue notes that included equipment and electrical requirements depend on the configuration selected, so each number should be re-confirmed in writing for the exact unit being ordered, with the confirmation date and drawing revision recorded alongside it.

Note: the figures above are transcribed from the published product page for this model. Confirm them against the production drawing for your configuration before ordering, and check local electrical and building requirements with your own engineers and authorities.

Options that change what arrives on site

The range offers optional accessories that alter both the equipment schedule and the services required: control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option needs its own line with included or excluded marked against it, rather than a general statement that options exist.

Three of them reach beyond the supplier's scope. A heat pump changes power draw and may change where plant can be sited and how noise is managed near guest rooms. Insulation determines what can be left exposed on an outdoor terrace. Sand filtration creates a backwash line that has to reach drainage. Putting those three decisions on paper before production starts keeps them out of the site variation log.

Site interfaces to settle before the order is placed

  • Base and access. The documented shell size sets the prepared base, but also the delivery route, lifting equipment and whether the unit can reach its final position in one piece.
  • Electrical supply. Record the total power listed for the selected configuration, together with the protection, earthing and isolation requirements your own electrical engineer specifies.
  • Fill, drain and overflow. Filling, draining, backwash and any discharge from the plant area need routes agreed with the mechanical contractor.
  • Deck level and edge detail. The relationship between spa rim and surrounding deck affects waterproofing and safe access, and should be drawn rather than assumed on site.

Comparing configurations within the range

Where a project needs a longer swim channel or a different jet layout, adjacent models carry their own published entries. Outdoor Swim Spa WS-S06B is listed at 5800 x 2200 x 1250 mm with 48 jets, three water pumps and a waterfall feature, while Outdoor Swim Spa WS-S07B-T is listed at 7000 x 2200 x 1365 mm with 44 jets. The point for procurement is not which specification is better: each variant carries its own power figure and pump count, so the base, supply and plant decisions have to be repeated for whichever model is selected.

Awkward footprints sometimes call for something else entirely. Square, round, oval and curved spa shells are also offered as customised shapes, which opens a separate documentation thread: drawings signed off by both parties, an agreed definition of the finished edge, and acceptance criteria set before manufacture rather than at handover.

Coordinating the spa with poolside furniture

Poolside work sits inside a wider scope covering loungers, dining sets, pergolas and screening. When one supplier carries furniture and building materials together, the swim spa can run on the same programme as those items through turnkey project solutions, with a single production schedule and shipment plan instead of several deliveries competing for the same site window.

For buyers working across borders, the paperwork that travels with the spa matters as much as the spa. Commercial invoices, packing lists and certificates of origin should match the equipment schedule exactly, including every option confirmed earlier, so clearance does not stall on a discrepancy between order and crate.

What to ask the supplier to confirm in writing

  • The exact model code and configuration for this project, with each option marked included or excluded.
  • Current dimensions, jet count, pump arrangement and total power for that configuration, dated and tied to a drawing revision.
  • Electrical requirements and any plant clearances the site must provide.
  • Packaging, container arrangement and delivery method to the project address.
  • What is inspected at handover, and how spares for pumps, controls and jets are supplied afterwards.

None of these requests is unusual, and none should stay open until the spa is on a truck. A supplier working to custom and OEM service expects this level of confirmation in any case, because it is what allows a bespoke configuration to be produced once rather than twice.

A closing checklist for the project file

  • Model code, catalogue dimensions and confirmed dimensions recorded side by side.
  • Equipment schedule: pumps, jets, control system, swim training system, lighting, ozone.
  • Options schedule with included or excluded marked for every accessory.
  • Power figure as published, plus the electrical design that accommodates it.
  • Base, access and lifting plan; deck level and waterproofing detail.
  • Fill, drain and backwash routing agreed with the mechanical trade.
  • Freight and customs documents matched line by line to the equipment schedule.
  • Handover inspection list and the route for ordering spares later.

Keep that file with the rest of the project's product data, and every later change has something to be measured against. Teams specifying water features alongside the wider swimming pool and swim spa range will find the same discipline applies from a compact plunge spa through to a full-length swim current unit.

Projects in Australia and elsewhere can send drawings and equipment lists to SANTERSON for configuration review before production is scheduled, so the documentation above becomes an agreed baseline rather than a list of open questions.