A walnut solid wood wardrobe is one of the more expensive items in a bedroom fit-out, and it is also one of the easiest to mis-specify. Most disputes do not start with the timber itself. They start with a drawing that was never checked on site, an internal layout described only as "as shown", and a finish name that means something different at the factory than it does on the sample board. The specification below is the checklist we work from when a buyer sends us a wardrobe enquiry.
Why Walnut Solid Wood Wardrobes Are Specified Differently
Walnut sits at the darker, warmer end of the timber palette and reads as a statement surface rather than a background one. That has practical consequences for how you write the order. A wardrobe in Walnut Solid Wood Wardrobes is normally built to the opening it occupies, so the dimensions, the door type and the internal layout all have to be settled before production begins — not adjusted on site. Our walnut line is part of the wider solid wood wardrobe collection alongside Oak Solid Wood Wardrobes and Mahogany Solid Wood Wardrobes, which means the same specification logic applies across the range.
If the timber look matters more to the design than the solid construction does, the alternative is a veneer door over an engineered carcass. Walnut Veneer Wardrobes give you a controlled, repeatable grain pattern across a long run of doors, which is often the better choice for a hotel room repetition or a villa with several identical bedrooms. Write that decision into the specification explicitly, and request a physical sample of whichever option you intend to order.
Section 1 — Opening and Dimensions
This is where most avoidable cost appears. Give the factory the opening, not a nominal room size.
| Item to state | What a clear entry looks like |
|---|---|
| Width, height, depth of each wall run | Measured at high, middle and low points; the smallest measurement governs a built-in |
| Floor and ceiling condition | Level or out-of-level; whether skirting, cornice or a service run must be scribed around |
| Obstructions | Switches, air grilles, radiators, door swings, light fittings, bed headboards that overlap the carcass |
| Interface materials | What the side panels meet — plasterboard, tiled wall, timber floor, stone threshold |
| Ceiling height allowance | Whether the wardrobe runs to soffit or stops below, and who fills the gap |
For a made-to-measure piece, ask for the factory's shop drawing back before you approve production. Read it against the site conditions yourself. A drawing that shows a perfect rectangle in an imperfect room is the single most common source of an installation day that runs long.
Section 2 — Carcass, Doors and Hardware
Name each surface separately. "Walnut wardrobe" does not tell a manufacturer what the inside of the box is made of, and the interior is where moisture, odour and wear actually happen.
- Carcass: state the board type and edge treatment for the exterior faces, plus what you expect on visible interior surfaces.
- Door construction: solid panel, framed panel or flat slab. Framed and paneled doors suit classic interiors; flat slabs read modern and pair with handleless detailing.
- Door type: hinged, sliding or open. Sliding needs a track depth allowance and clear floor run; hinged needs swing clearance against the bed and the room door.
- Hinges, slides and handles: specify brand or grade if you have a standard, and say whether soft-close is required.
- Finish: sheen level, stain or clear coat, and a signed sample reference for every colour used.
Where the design calls for a seamless front, say so in writing. A handleless minimalist wardrobe is a different build from a paneled one — see Custom Minimalist Bedroom Wardrobe for how flat panels and integrated openings change the door construction.
Section 3 — Internal Layout, Room by Room
Do not let the interior be decided at the quotation stage by whoever drew the elevation. Specify it against how the wardrobe will actually be used, and give heights rather than counts.
- Hanging: single or double hang, and the rail height for each. Long garments need their own bay.
- Drawers: number, width and whether they sit at comfortable height or in a low bank. Interior dividers for accessories are worth specifying now, not later.
- Shelving: fixed or adjustable, and shelf depth — a shelf copied from a linen closet is too deep for folded knitwear.
- Tall and corner bays: state how the dead corner is resolved before production.
- Lighting: door-activated or motion-activated interior lights need cable runs decided at drawing stage.
For a project with several bedroom types, produce one layout per room type and label each elevation on the drawing. Repeat layouts are what keep a multi-unit order consistent and make site inspection meaningful.
Section 4 — Finish Approval and Sampling
Walnut varies. Ask for a sample of the exact species cut, grain orientation and coating you are ordering, and view it in the room's own light before signing off. Then keep the signed sample; it becomes your reference at delivery.
Section 5 — Documentation to Attach to the Order
- Measured site drawing and approved shop drawing, both dated and versioned
- Elevation drawings per room type, with internal layout dimensions marked
- Finish schedule: one line per surface, each tied to a sample reference
- Hardware schedule: hinges, slides, handles, lighting, with quantities
- Delivery and access notes: floor level, lift size, stair width, delivery window
- Named acceptance criteria for the pre-shipment check
Attach all of it to a single purchase document. When the specification and the drawing share one version number, there is nothing left to argue about at handover.
How We Work From a Specification
SANTERSON has manufactured furniture and building materials for villa, hospitality and office projects since 2008. Send us the measured drawing and the finish schedule above and we return a shop drawing, a material and hardware schedule, and a quotation built on what you actually specified — with the option to coordinate the surrounding fit-out, from interior fixtures to furniture series, under one order and one delivery.
Send us your wardrobe specification
Share your drawings, room list and finish references. Our team reviews the specification with you and confirms dimensions, materials and hardware before anything goes into production.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com