A set of open bookshelves looks simple on a drawing. No doors, no hardware, nothing to hide behind. That is exactly why an unclear brief causes trouble: the shelf spans, the board thickness and the way the unit meets the wall all become visible the moment the piece is installed. If you are ordering custom open bookshelves for a villa, an apartment or a hospitality project, the quality of the result depends far more on the information you send than on the machinery in the factory.
The brief below is the one we would ask you for. Everything in it can be answered from a set of architectural drawings, a room photo and a short conversation about how the shelves will actually be used.
1. Room, wall and the exact opening
Start with the wall, not the furniture. Send the wall length and height, the position of skirting, cornices, architraves and any recess, and mark what sits on that wall today: doors, switches, sockets, air-conditioning returns and lighting all change where an upright can run.
- Critical dimensions: overall width and height at three points along the wall, plus the depth available after any skirting or dado.
- Floor and ceiling condition: whether the floor is level, whether the ceiling has a cornice you intend to scribe around, and whether the wall can carry a fixed unit or needs a freestanding one.
- A site photograph from both ends of the wall, with a tape measure visible in frame.
For a full-height wall, say so explicitly. Floor to ceiling bookshelves are built and fixed differently from a unit that stops below a cornice, and the difference affects both the carcass detail and how the unit is packed for shipping.
2. What goes on the shelves, shelf by shelf
"Books" is not a specification. A row of paperbacks, a run of art books displayed face out, a line of binders and a shelf of ceramics each need different depths and different vertical spacing.
| What you plan to store | Typical clear depth | Typical clear height per shelf |
|---|---|---|
| Paperbacks and novels | Narrow | Standard book height plus a little clearance above the hand |
| Art books, portfolios, magazines | Deeper | Taller, with room to lift the book out |
| Binders and files | Standard | Foolscap or A4 height, depending on the file |
| Decorative objects, ceramics, plants | Varied | Open, irregular spacing for display |
Tell us which shelves you want fixed and which adjustable. Adjustable shelving needs a row of holes or a groove on both uprights; fixed shelving gives a cleaner elevation but no flexibility later. In most projects we recommend keeping the lower and upper rows fixed for stiffness, with adjustable shelves in the middle band where use changes.
3. Span, board thickness and deflection
This is the single most common failure point on open shelving. A long shelf carrying a full row of books will sag over time if the span is too wide for the board. You do not need to calculate it yourself, but you do need to give the factory the two inputs that decide it:
- The clear span between uprights or between an upright and a vertical divider.
- The intended load on that shelf: paperbacks, art books, files, or objects.
With those two facts, the manufacturer can set the board thickness, add an intermediate vertical divider where a span is too long, or drop a hidden support into the design. If you simply ask for the widest possible open bay and the heaviest possible load, you are asking for a shelf that will fail. Where a very wide open run is part of the design intent, say so early; it is usually solved with a thicker board or a steel-reinforced shelf rather than by changing the look.
4. Material and finish, stated as a system
Give the finish as a combination of substrate plus surface, not just a colour name. Two units described as "oak" can be completely different products underneath. Useful wording for an enquiry:
- Carcass: substrate and thickness, with the edge treatment you expect on visible edges.
- Shelves: substrate and thickness, plus whether the front edge is square, bullnosed or rebated.
- Surface: veneer, laminate, lacquer or paint, with the sheen level you want.
- Colour reference: a physical sample, a brand and code, or a photograph of an existing joinery item that must match.
If the bookshelf has to match custom wardrobes, kitchen cabinetry or wall panelling in the same building, say which items must match and send their specification. Matching a veneer across two product families is a decision to make at quotation stage, not after production has started.
5. Fixing method and who fixes it
Open shelving carries visible weight with nothing to conceal the structure behind it, so state the fixing intent in the brief:
- Wall-fixed, floor-fixed or both, and the substrate you expect to fix into: masonry, stud partition, plasterboard or timber frame.
- Whether a concealed batten system is required so no brackets show.
- Anti-tip restraint requirements for child-occupied or public spaces.
- Who installs on site: your contractor or ours. Built-in units arrive as panels and need the wall preparation finished before they can be fitted.
This is also where built-in and loose furniture part company. A built-in unit is a trade item that has to be coordinated with plastering, flooring and electrical work; a freestanding open shelving piece arrives assembled and simply needs a clear floor. Both are made to measure in our workshop, but they sit on different construction programmes.
6. Integration with lighting and neighbouring work
Shelf lighting has to be planned before the panels are cut: cable routes, transformer location, and a rebate or channel for the profile. Tell us whether you want light inside the bays, on the shelf edges, or on the display items only, and who is supplying the driver and the switch. Where the shelving meets niche shelving, a media wall or panelling, send the junction detail you expect: a shadow gap, a direct abutment or a cover strip. That detail changes the panel size.
7. Quantities, phasing and delivery
Send a schedule rather than a single drawing: unit reference, room, width, height, depth, number of shelves, finish code and quantity. For multi-apartment or multi-villa projects, list the units by type and tell us how many rooms share the same specification; repeating one approved detail across several rooms is where custom work earns its cost back.
Also state the delivery address, the access route to the floor (lift size, stair width, loading restrictions) and the phase you need each unit on site. Made-to-measure joinery packed for international freight arrives as labelled panel sets; knowing the access constraints in advance decides how the load is broken up.
8. Approvals: what to sign off before production
As a manufacturer operating since 2008 with our own workshop and custom and OEM service, we produce a setting-out drawing for approval on every open bookshelf order, together with a sample of the specified finish. For projects handled under our turnkey scope, the same drawings feed into logistics and door-to-door delivery and then installation and after-sales support, so one set of approved dimensions carries through from the workshop to the site.
A short brief template you can copy
| Item | What to write |
|---|---|
| Project and room | Project name, city, room, and whether residential or hospitality |
| Wall data | Width, height, depth available; floor level; cornice, skirting, doors, sockets |
| Unit type | Built-in or freestanding; open, mixed open and closed, or full height |
| Shelf layout | Number of bays, clear span per bay, fixed and adjustable positions, shelf depths |
| Load | Books, files, display objects, bay by bay rather than overall |
| Finish | Substrate plus surface, sheen level, colour reference or sample number |
| Fixing | Wall and floor substrate, concealed batten or visible brackets, anti-tip needs |
| Lighting | Position, switching, who supplies driver and cable |
| Quantities | Unit references with quantities; phasing and required on-site dates |
| Access | Delivery address, lift or stair dimensions, loading restrictions |
Send us your drawings
Email the wall dimensions, a room photograph and your shelf layout, and we will return a setting-out drawing, a recommended board thickness for each span and a quotation for the finish you have specified. Enquiries are handled by PHILLIP, Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8).
Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com | Contact page