A swim spa shell arrives on site looking finished. The panels are smooth, the jets sit in a neat row, the lights glow evenly under water. That is exactly why finish details get treated as cosmetic and left out of the purchase order. On Outdoor Swim Spa WS-PC08ST-L, most of what a buyer later calls "the problem" is not a broken part but an unspecified surface, an unnamed equipment item, or an electrical arrangement nobody signed off. The catalog lists this model at 8490 x 2400 x 1470 mm with a control system, a swim training system, a filter pump, six jets, four LED lights and a total power figure of 6.55 kW. Each of those entries has finish decisions hiding behind it.
The checklist below follows the order in which a villa owner, a project buyer or a contractor actually has to make those calls: shell and cabinet surfaces first, then the water-side hardware, then the equipment room and the power supply, then the packaging that decides what condition the unit reaches you in.
1. Shell surface, colour and the edge detail
Acrylic shells are supplied from moulds, and the visible difference between two units of the same model usually comes down to gloss level, colour depth and how the top edge is finished. Confirm the exact shell colour against a physical sample rather than a screen image, and state whether you want a high-gloss or a softer surface. Gloss affects how scratches and limescale read under pool lighting, which matters on a long, narrow tank where one side wall runs the full length of the swim lane.
Ask specifically how the coping edge is finished and what trims it: an integrated ledge you can sit on, a flat rail, or a wrapped edge that disappears under cladding. If the spa will be tiled, decked or sunk into a platform, the edge detail decides whether your site team has a clean line to abut to or whether they are cutting around something nobody dimensioned.
2. Cabinet and cladding finish where the unit stands exposed
On an outdoor installation the cabinet is visible furniture, not a hidden plinth. Confirm the cladding material, its colour and its surface texture, and how access panels are cut and hinged. A flush, generously sized door on the equipment side is worth more than a decorative panel that has to be unscrewed every time someone checks the filter pump.
If your design calls for cladding that matches surrounding joinery or outdoor cabinetry, send the material specification with the order instead of hoping the factory can approximate it. SANTERSON works from custom and OEM specifications across its furniture and building materials range, so a matching finish is normally handled as a documented option rather than an improvisation on site.
3. Jet faces, light faces and other small visible hardware
Six jets and four LED lights mean ten small faceplates sitting in the shell, all of them in your sightline. Confirm the finish of those faces — white, chrome, brushed metal or a colour matched to the shell — and confirm that the same finish applies across every fitting rather than only to the "feature" side. Mixed trim finishes are one of the most common complaints after installation, and they are invisible on a specification sheet.
Also ask how the lights are mounted and whether they are recessed flush with the shell. Flush fittings clean more easily and show fewer deposits; surface-mounted ones collect scale around the rim.
4. Which equipment is actually in the crate
The catalog entry for this model lists a control system, swim training system, filter pump, jets, LED lighting and ozone, and it also shows optional accessories such as UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Two buyers can order the same model number and receive different machines. Before you compare quotations, put every item in writing:
- the control system make and interface, and whether it is mounted on the cabinet or remotely
- whether a water pump is included for your configuration — this line is not always filled in on the catalog entry, so get an explicit yes or no
- heat source: heat pump capacity, or none at all if you are supplying heating separately
- sanitisation: what ozone equipment is fitted, and whether UV sterilisation is added
- filtration: the filter pump supplied, and whether sand filtration replaces or supplements it
- insulation package, which changes both running behaviour and how the cabinet is built
- steps or access arrangement, including material and finish
The swim training system deserves its own line. Confirm what nozzle or flow arrangement is fitted, since that determines the current you swim against and whether the seating end still works as a hydrotherapy area.
5. Electrical finish: the part buyers confirm too late
The catalog shows 6.55 kW total power for this configuration, with the equipment list varying by option — so treat that number as a starting point and ask for the confirmed figure for your exact build. Then settle the supply arrangement before the slab is poured: single-phase or three-phase, circuit rating, where the isolator sits, cable route, and whether any part of the wiring is inside the factory scope or entirely yours.
Get the electrical requirements in writing for the configuration you are ordering, not the base model. A heat pump or an upgraded pump changes the load, and a site that was prepared for the wrong supply gets corrected with chipping and re-pulling, after the spa has already arrived.
6. Site protection, packaging and handover condition
Finish questions do not end at the factory door. Confirm how the shell is protected in transit, whether the unit arrives on a crate or frame, what lifting points are intended, and what the delivery covers at your address. Freight forwarding, customs paperwork, packaging and container loading are part of the logistics and door-to-door delivery service, but the last stretch — crane, access route, final position — is where shells get scratched if nobody planned it.
Inspect against the written configuration list on the day of delivery. Recording missing or substituted equipment at handover is far easier than raising it after the tank has been filled.
A quick confirmation sheet
| Detail to confirm | What to ask for in writing |
|---|---|
| Shell | Colour and gloss level, sample reference, coping edge profile and dimensions |
| Cabinet | Cladding material, colour, texture, access panel size and hinge side |
| Visible hardware | Finish of all six jet faces and four light faces, recessed or surface mounted |
| Equipment list | Pump line item confirmed, heat source, ozone and optional UV, filtration type, insulation |
| Swim function | Swim training system type and flow arrangement |
| Electrical | Confirmed total power for this build, phase and circuit rating, isolator location, scope split |
| Access | Steps specification, handrail if any, access for maintenance |
| Delivery | Packaging standard, lifting method, delivery extent, inspection at handover |
Ask for a configuration drawing
One drawing that shows the shell with jet and light positions marked, the cabinet with access panels marked, and the equipment list printed alongside it settles every item above in a single document. Sign that drawing, not a marketing brochure page, and make it part of the order.
Where this fits in a wider project
Swim spas rarely sit alone. A terrace scheme usually carries pergolas, loungers and outdoor dining alongside the water feature, and matching metal tones, teak-look surfaces and fabric colours across those items is easier to arrange when they are specified together with the spa. The swimming pool range covers several tank sizes and layouts in this style, including deeper 8000 x 3000 x 1500 mm configurations with a larger jet count, so if the six-jet specification of WS-PC08ST-L is too modest for your brief, the same confirmation checklist applies to the alternative you choose. For whole-villa and hospitality work, that kind of coordination sits inside turnkey solutions, where product specification, production coordination and site guidance are handled as one package.
Send the model number, your site drawing and the finish choices you want, and the factory will confirm the configuration and what is included before you commit. Contact SANTERSON through the contact page to start that confirmation.