A floating modular system looks simple on a rendering: wall-hung cabinets, open niches and closed carcasses arranged along one living wall. It is one of the easiest items in a joinery package to under-specify, and one of the most expensive to fix once it is on site. If you are a developer, builder, procurement officer or interior consultant assessing a quotation for Santerson Floating Modular Systems, this guide walks through the eight items that should be settled in writing before you place the order, and what a complete proposal from a custom furniture manufacturer should already contain.
What the product actually is
Santerson Floating Modular Systems sits in the Modular Living Systems collection. The catalogue page describes configurable floating living systems with made-to-measure sizing and a choice of materials and finishes, so layout, dimensions and surface treatment are all specified per project rather than picked from a fixed size list. That flexibility is the reason the item needs careful scoping: two quotations can look identical on a drawing and differ materially in substrate, suspension method, edge treatment and what is included in the price.
Related configurations in the same collection are worth comparing at proposal stage, because they solve different problems. Santerson Mixed Open & Closed Systems combines open display bays with closed storage in one run, while Santerson Floor to Ceiling Modular Systems anchors to floor and ceiling instead of hanging from a wall. A floating run is usually the right answer where you want visible floor, under-cleaning access or a light visual weight; a floor-to-ceiling run is usually the better answer where storage volume matters more than the floating effect.
1. Scope: does the quotation describe the whole wall or only the boxes?
The first thing to check is what the line item covers. Modular living walls are frequently quoted as carcasses, doors and shelves, with niche back panels, plinths, cornices, infill pieces and scribe cuts treated as extras. Ask for a piece list that names every component, including:
- Carcass modules with their individual widths, heights and depths
- Open niches, shelf boards and any niche back panels or illuminated reveals
- Closed modules: door type, hinge side, handle detail or push-open mechanism
- Infill, scribe and filler pieces needed to make the run fit an out-of-plumb wall
- Any integrated lighting, cable routes and transformers, listed as separate line items
A proposal that itemises components lets you compare two suppliers on the same basis. A single lump-sum line for "living wall unit" does not.
2. Substrate and finish schedule, named explicitly
The catalogue states that materials and finishes are selectable per project. Your proposal should therefore name them rather than describe them. For commercial work, ask which board substrate is used for carcasses, which for doors, and what the surface treatment is — laminate, melamine, lacquer, veneer or acrylic. The finish schedule should give a manufacturer code or physical sample reference for each colour, not a descriptive name alone, because two suppliers can quote "matte grey" and deliver different products.
Also confirm edge treatment on visible edges. In a floating run the top, bottom and side returns are seen from three directions, so 2mm ABS edging and a mitred or wrapped edge are not equivalent, and the price difference should be visible in the quotation.
3. Suspension system and the wall behind it
This is where floating systems most often fail in commercial interiors, and it is a site condition rather than a furniture specification, so it belongs in your scope of works, not only the supplier's. Before you accept a proposal, confirm:
Questions to have answered in writing
What rail or cleat system carries the load, and what is its rated capacity per running metre? What substrate is the wall — masonry, framed stud wall, tile backer or plasterboard — and where must fixings land? Is a reinforcing batten or steel backing required, and who supplies and installs it? For partition walls in a hotel or office fit-out, has the wall been designed to take the hanging load at the specified module widths?
The supplier can specify the hardware; the wall preparation is normally the contractor's responsibility. A good proposal states that boundary clearly instead of leaving it ambiguous.
4. Load, span and deflection limits for shelf boards
Open bays in a floating system are the weak point when they are used for books, display objects or equipment. Ask for the maximum recommended load per shelf and the unsupported span at which a stiffener or thicker board is required. If the design includes long open spans without a vertical divider, request that the shelf thickness and any concealed steel reinforcement be stated on the shop drawing. For hospitality and office projects where the units will be used by occupants rather than curated by a designer, specify conservatively and let the supplier confirm the detail.
5. Integrated lighting and services
Where the proposal includes LED strips in niches or under carcasses, treat them as an electrical scope with its own details: fitting type and colour temperature, driver location and whether it is accessible for service, cable routes and where the wall outlet must be positioned. Santerson's Modular Living Systems range also includes configurations with integrated lighting, so if you want the effect, ask for it specified rather than assumed. Confirm which party supplies the first-fix cabling and who terminates at the site outlet.
6. What is included in the price, and what is not
| Item to confirm | Why it changes the number |
|---|---|
| Survey responsibility | Floating runs need as-built wall dimensions. A quotation based on drawing dimensions assumes walls are plumb and square; site deviations turn into variation orders later. |
| Trade fixtures and fixings | Rails, brackets and anchors should be itemised with the load rating, not bundled as "accessories". |
| Packaging and crate specification | Floating components have long, thin members that chip in transit. Ask how edges are protected and how crates are labelled per room. |
| Freight terms and destination | Sea, air and rail freight with door-to-door delivery is available through the supplier's logistics service; confirm Incoterms, duties and who handles customs clearance for your port. |
| Installation | On-site installation, inspection and snags form part of the installation and after-sales support. Establish whether installers travel to your site or whether local labour is expected. |
| Spare parts and warranty terms | Ask what the warranty covers for boards, edges, hardware and lighting, and which replacement parts are held available. |
7. Samples, prototypes and approval milestones
For a multi-unit or repeat-typology project, ask for a finished sample of the door, one shelf board and one carcass edge before production release. That single step exposes colour mismatch, edge banding quality and hardware feel far better than a specification sheet. The supplier's custom and OEM service covers bespoke material finishes and textures as well as prototyping, so a mock-up of the most visible module is a reasonable request rather than an exception.
Then set the approval sequence in the contract: shop drawings signed off, sample approved, production released, pre-shipment inspection, despatch. Written sign-off at each gate is what keeps a joinery package from becoming a running argument.
8. Site programme and sequencing
Floating modular units are a late-trade item that depends on earlier trades: wall set-out, first-fix electrics, floor levelling, paint or wall finish complete, and clean storage on arrival. Work backwards from your handover date when you agree the production lead time, and confirm what happens if the site slips after the units have shipped. A supplier offering project management and site coordination through its turnkey project service can be useful here, particularly where the same team is also supplying cabinetry, wall panelling or doors and the interfaces between them need one point of accountability.
A short proposal checklist
- Piece list naming every module, niche, shelf and infill piece, with dimensions
- Substrate and finish schedule with codes or approved physical samples
- Suspension system with load rating, plus a clear statement of who prepares the wall
- Shelf load and span limits for open bays
- Lighting and services scope, including driver access and termination responsibility
- Freight terms, packaging specification, installation scope and warranty wording
- Approval gates: drawings, sample, production release, inspection, despatch
How to use this with a live enquiry. Send the drawing package and ask for the quotation structured against the checklist above. Two proposals that both satisfy it can be compared honestly; two that do not will differ mostly in what has been left out.
Common questions
Can the system be made to a non-standard width?
The catalogue specifies made-to-measure sizing, so module widths and overall run lengths are set per project. Confirm on the shop drawing that each module dimension matches the as-built wall, not the design drawing.
Which is better for a hotel room: floating or floor-to-ceiling?
It depends on what the wall has to do. Floating units keep the floor line clear and read as lighter, which suits narrower rooms; floor-to-ceiling systems give more storage volume and hide storage entirely. Specify both options in the enquiry and compare the cost per linear metre of usable storage, not just the unit price.
What information should I send to get a usable quotation?
Room layout with wall elevations, the finish schedule for the wider joinery package, the intended use of each bay, and your site programme. The more of this you supply at enquiry stage, the fewer assumptions the supplier has to make.
Send your drawings for a scoped proposal. Santerson is a China-based furniture and building materials manufacturer supplying joinery, cabinetry and interior fixtures for villa, hospitality and office projects. Share your wall elevations, finish schedule and programme through the contact page, and request the quotation structured against the checklist in this article.
Product configuration, materials, load ratings, freight terms, warranty scope and installation arrangements are project-specific. Confirm all specifications and commercial terms directly with SANTERSON before ordering; nothing in this article is a guarantee of performance or service level.