A handleless concealed door disappears into the wall when it is closed: no visible frame face, no handle, no architrave breaking the plane of the finish. That is exactly why specifiers choose them for villas and boutique hotels, and it is also why buying them from overseas feels risky. The product is only half of the delivery; the lining, the hinges, the wall build-up and the decoration all have to arrive at the same conclusion. The steps below are how we take that from an enquiry on Santerson Handleless Concealed Doors to a door that closes quietly on site, whether the project is in Sydney or Singapore.
What you are actually ordering
Before comparing prices it helps to be precise about the scope, because two quotations that look identical often cover different things. Our handleless concealed doors are made-to-measure and sit within a collection that also covers Flush Wall Aligned Doors and decorative concealed leafs, so the same wall detail can carry more than one door type across a single floor.
- The leaf. Core construction, edge detail and the substrate that will be painted, veneered or laminated on site or in our factory.
- The lining and frame. The structural surround that carries the load and sets the reveal against the plasterboard.
- The ironmongery. Concealed hinges, the magnetic lock set and the strike, plus the opening mechanism that replaces a handle.
- The finish decision. Pre-decorated to your colour or supplied decoration-ready for the local trade.
Each of those items is configurable. A quotation that lists only a leaf and hinges will not install; one that includes the lining, ironmongery and a finish schedule will. We ask buyers to compare quotations item by item rather than as a single line total.
Step 1: send us the openings, not just a door size
The single most common cause of delay on an overseas door order is incomplete dimensional information. A concealed door is set into a wall build-up, so we need more than a width and a height.
- Clear opening width and height for every leaf, taken from setting-out drawings rather than a room sketch.
- Total wall thickness, including the lining, plasterboard both faces and any insulation or service cavity.
- Which face is the feature side, and whether the door swings in or out, left or right hand.
- Floor finish build-up, so the undercut is set against the completed level rather than the slab.
- Whether the ceiling is continuous over the head, which changes the head detail and the fixing method.
Send a door schedule with one row per opening. If your drawings are still moving, tell us which rooms are settled and we will price those first; splitting an order by zone is normal on a villa or apartment project and it keeps the production queue honest.
Step 2: agree the finish before production starts
A concealed door only works if its surface matches the wall it disappears into. We support made-to-measure sizing with material and finish options, and the choice you make here decides who does what.
- Decoration-ready leaves. Supplied ready for your painter or joiner to decorate on site, matching the wall system exactly. This is the usual route where the wall is painted a specific colour or finished in plaster.
- Factory-finished leaves. Veneer, laminate or lacquer applied in our factory to an approved sample, which suits projects that want the door surfaces consistent with cabinetry and panelling from the same order.
Where a project already uses us for Flush Interior Doors, custom joinery or wall panelling, we match the leaf surface to that schedule so the doors and the surrounding panelling are made under one specification. That single decision removes most of the on-site colour-matching arguments.
Step 3: confirm the ironmongery as a set, not as separate parts
Concealed hinges carry the whole visual promise of the product. They must be rated for the leaf weight and size you have specified, matched to the wall thickness, and compatible with the lock set and the opening method that replaces the handle. We specify them as one package per opening and state the load rating on the drawing for your joiner or installer to check.
Two points are worth settling in writing: whether the hinges arrive pre-fitted to the leaf, which saves site labour but means the packing must protect them; and how the door is opened without a handle, since a recessed pull, an edge profile or a push mechanism each changes the edge detail. If your project uses a specific hinge brand, send us the model and we will confirm compatibility against the leaf specification rather than substituting silently.
Step 4: choose how the wall build-up is coordinated
A concealed door fails in practice for one of three reasons: the lining is not plumb, the wall thickness on site does not match what was ordered, or the reveal detail at the edge was never resolved. When you buy from an overseas manufacturer you cannot walk to site with a level, so this coordination has to happen on paper.
- We mark up the setting-out for each opening: lining position, head and sill levels, and the tolerance you should hold.
- Your side confirms the finished wall thickness before we lock production, with photographs of a mock-up wall where the build-up is unusual.
- The edge detail is agreed as a drawing, not a discussion, so the local trade knows whether the gap is shadowed, filled or trimmed.
Step 5: sampling and approval
For multi-unit projects we recommend approving one opening completely before the rest are released: leaf, lining, ironmongery and finish. That single door exposes the reveal detail, the paint match and the closing action, and it is far cheaper to correct at that stage than across forty openings.
Approval should be documented with a signed sample or an approved drawing pack, both retained on each side. On projects where we also handle custom and OEM manufacturing for other joinery elements, the same approval pack governs every matching surface that follows.
Step 6: packing, freight and receiving on site
Doors are heavy, flat and easily damaged at the corners, so packing method is a commercial issue as much as a technical one. We pack leaves and linings separately with edge protection, mark each carton to its schedule reference, and give you a loading plan so the containers unload in the right order.
- Freight by sea, air or rail with customs paperwork handled on our side; smaller urgent batches can go air when one opening is holding a trade.
- Ship each zone separately if your programme needs staged delivery to different floors or buildings.
- Inspect every carton against the packing list on arrival and photograph any damage before signing. Hardware kits are the first thing to go missing.
Store leaves flat and indoors, off the ground, in the conditions they will live in. A concealed door that has sat in a damp site cabin for six weeks will not sit flush no matter how well it was made.
Step 7: installation and handover
Our service scope covers on-site installation, inspection with a snag list, warranty cover, spare parts and replacement, and ongoing maintenance. For concealed doors the practical sequence is fixed: install the lining first, prove it plumb and at the right line, then hang the leaf, then adjust, then decorate, then fit the ironmongery last so nothing is painted shut.
Keep one thing in mind for handover. Concealed hinges are adjustable, but they need to be adjusted with the finished leaf weight on them, after decoration. Ask your installer to return for a final adjustment pass once painting is complete; that single visit is what makes a concealed door look invisible rather than merely installed.
Questions to ask any overseas supplier before you commit
- Does the quotation include lining, ironmongery and finish, or only the leaf?
- What is the load rating of the concealed hinges for the size I specified?
- Who resolves the wall edge detail, and in what document?
- Can you supply one approved opening before releasing the full schedule?
- How are spare hinge and lock sets supplied years later, when a leaf needs servicing?
A supplier who answers these with drawings and itemised pricing is worth more than one offering a lower unit rate. If you want us to price a schedule, send the openings and the wall build-up through our contact page and we will come back with an itemised specification per opening.
Send us your door schedule
SANTERSON has manufactured furniture and building materials since 2008, supplying project customers in hospitality, villas and offices. Share your openings, wall build-ups and finish intent, and we will return an itemised specification for each concealed door opening on the project.
Made-to-measure dimensions, materials, finishes and ironmongery selections are confirmed per project before production. Please verify dimensions and selected specifications against your own site conditions and local requirements.