A set of doors can sit correctly on a drawing for months and still fail on site: an opening that is a few millimetres out, a hinge side drawn the wrong way round, or a crate that arrives after the floor finishes. The Santerson Flush Hinged Doors range is made to measure for each project, so the delivery plan matters as much as the product selection. This guide walks through the sequence we follow on international orders, from opening survey to handover, using the flush hinged door collection and related concealed-door work as the working example.

Why made-to-measure doors change the delivery conversation

Flush hinged doors sit close to the finished wall surface, so their final size depends on things that are still moving early in a programme: floor levels, wall build-ups, plaster or panel thickness, and the position of reveals. Because each unit in this collection is produced to project-specific dimensions with selectable materials and finishes, the manufacturing order cannot start until those values are frozen. That single fact drives everything downstream — production slot, packing method, container mix and the installation window.

Santerson Flush Hinged Doors, made to measure for residential projects
Santerson Flush Hinged Doors — made-to-measure sizing with selectable materials and finishes.

For buyers comparing options within our doors range, two pages are worth reading alongside this one: Flush Wall Aligned Doors, where the leaf is set to read as part of the wall, and Integrated Door & Paneling, which combines the door with surrounding panelling so the two are produced against one drawing. Ordering those elements together usually removes an interface problem later.

Stage 1: survey data and a door schedule before anything is quoted

The starting point is a door schedule, not a price. For every opening we need:

  • clear opening size and the finished wall build-up on each side, with the floor finish noted
  • leaf orientation — hinge side, opening direction, and whether the leaf is single or double
  • the selected finish and material for the leaf and frame, plus cut-outs for handles and other ironmongery
  • hard cover lines: skirting, architrave, reveals, and any wall panel that the door must align with
  • site access at delivery — lift dimensions, corridor widths, and storage that stays dry

Our design and detailing team checks this against the drawings under the coordination service described on our Interior Design Services page, so a discrepancy surfaces in the workshop rather than in a corridor with the joinery already painted.

Stage 2: production, inspection and what actually goes into the crate

Once dimensions and finishes are signed off, units are produced under our Custom & OEM Service, with quality control at each stage. For a doors order we separate the packing list so that leaves, frames, ironmongery and fixings can be identified independently on site — crates are labelled by room or floor, not just by quantity.

ItemWhy it is separated
Door leavesKept upright and edge-protected; surface finish is the visible item on handover
Frames and jambsLong members that need their own support and can be installed ahead of leaves
Ironmongery and hardwareSmall, high-value parts; shipped where they will not be lost among panels
Fixings and setting-out packsConsumables that the install crew needs on day one, not at the end
Spare / replacement unitsHeld for any opening that changes on site during finishing works

Stage 3: freight, documents and the customs file

Doors travel with the rest of the fit-out most of the time. Under our Logistics & Door-to-Door Delivery service we arrange sea, air or rail forwarding, container loading, shipment tracking and customs paperwork — commercial invoices, packing lists and certificates of origin prepared with the consignment.

Two practical decisions shape cost and risk:

  • Consolidation or separate shipment. Doors shipped with cabinetry and wall panelling arrive in one delivery, which reduces handling but means the whole consignment waits on the slowest item. A separate doors shipment lets installation start earlier.
  • Incoterms and who clears customs. Door-to-door delivery places more of the journey with us; a port-only term puts clearance and inland transport with the buyer. Whichever is chosen, the importer of record must know the duty and inspection requirements at the destination port before the container is loaded.

Confirm duties, taxes and import requirements for your own port with your customs broker. Transit times and clearance windows vary by season and destination, so we do not present them as fixed commitments in a quotation.

Stage 4: arrival sequence and installation

Doors should be the last visible item to enter a finished space but the first item on site to be checked. Our recommended order on a residential or hospitality project:

  • check every crate against the packing list within 48 hours of arrival, and photograph any damage while the packaging is still intact
  • verify openings against the door schedule before frames go in — floor levels and wall build-ups are usually complete by then
  • install frames first, leave leaves boxed in dry storage, and fit them once painting and finishes are done
  • walk each door for alignment, swing clearance and latch engagement, then record snags on a single list

Our Installation & After-sales Support service covers site installation, inspection and snagging, plus spare parts and replacement for units affected by on-site changes. Warranty terms and response times are confirmed in the project documentation rather than assumed from marketing material.

A worked example: doors inside a villa fit-out

On villa projects we have supplied cabinetry, wall panelling and doors as one package for properties in Sydney, Melbourne and North Turramurra. In that setting a flush hinged door is not bought alone — it has to agree with the surrounding panels and joinery from the same drawing set. Ordering them together means one measurement visit, one production schedule, one container plan and one snag list, which is where most of the saving appears.

Checklist before you place an international doors order

  • door schedule complete, with orientation and finish marked on drawings
  • openings surveyed against finished levels, signed by the site team
  • packing list organised by room, with hardware separated from panels
  • Incoterms agreed, importer of record identified, documents prepared before loading
  • storage and access confirmed at the destination, including lift sizes
  • inspection and snagging dates booked against the finishing programme

Send us your door schedule. Share drawings, opening sizes and finish preferences, and we will return a production and delivery plan for the flush hinged door collection alongside the rest of your fit-out package.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com  |  Contact page