A swim spa on a villa or resort drawing is easy to approve and expensive to change later. Before your project team signs off on Outdoor Swim Spa WS-PC03, the specification needs to be checked against the site it will actually sit on: the slab, the power supply, the drainage, the water treatment plan and the maintenance routine. This article lists the confirmations we ask buyers and consultants to close out before approval, using the catalogue data published for WS-PC03 as the reference point.
What the Published Specification Already Answers
WS-PC03 is a compact, square-format unit in our configurable outdoor swim and hydrotherapy range. The catalogue entry gives an envelope of 3000 x 3000 x 1000 mm, which is the first thing to test against your plan: it defines the footprint, the access route for delivery and the working clearance needed around the cabinet for servicing.
| Catalogue item | Value shown on the product page |
|---|---|
| Model | WS-PC03 |
| Catalogue dimensions | 3000 x 3000 x 1000 mm |
| Jet total | 50 pcs, plus 4 water columns |
| Water pump / filter pump | 1 pc each |
| Control system | 1 set |
| LED lights | 1 pc |
| Total power | 2.75 kW |
| Features shown | Water jets, LED lighting, Ozone |
Two entries in that table deserve attention before anyone treats the sheet as final. The swim training system is not listed for this model, so if the client's brief calls for counter-current lap swimming, that requirement has to be resolved with us in writing rather than assumed from the "swim spa" category name. And the 2.75 kW figure covers the equipment shown in the catalogue entry; it does not include a heat pump, which is an option and one of the largest single variables in both the electrical design and the running cost.
Site and Structural Confirmations
- Footprint and clearance. Confirm the 3000 x 3000 mm footprint against the finished deck setting, including tile thickness, any plinth or surround, and access space on the equipment side for the filter pump and control system.
- Loaded weight and support. A filled basin of this size is a heavy concentrated load. The structural engineer signs off the slab, pedestal or deck framing, not the product sheet.
- Delivery route. Measure gates, corridors, lifts and turning radii from the truck drop to the final position, and confirm whether a crane or tail-lift is required on site.
- Drainage and overflow. Confirm where first-drain and splash water go, and whether an overflow channel or drain is needed in the surround.
Power, Water and Commissioning
The electrical subcontractor needs a confirmed load before the distribution board is designed. Start from the 2.75 kW catalogue figure, then add the selected options, with the heat pump being the decisive one, and confirm supply type, circuit protection and earthing to the local wiring rules. The same applies on the water side: fill source, softening if the local supply is hard, and who performs commissioning and handover.
Rule of thumb for approvals: nothing on a specification sheet becomes a construction instruction until the option list is closed out. Confirm the exact configuration first, then let the engineer and electrician design to that configuration.
Configuration and Options to Lock In
Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each line needs a yes or no against WS-PC03 before order placement. For project work these choices matter commercially as well as technically: an integrated option is manufactured into the unit, while insulation and steps affect how the spa reads on the finished terrace.
If the design intent goes beyond a standard square format, for example an oval, round or curved basin set into a specific landscape, that belongs in the customizable shape outdoor spa route instead of a catalogue model, and it should be raised at concept stage rather than at procurement.
Comparing Within the Range Before You Commit
Approval becomes much easier when WS-PC03 is compared with adjacent models on the same basis. The catalogue shows WS-PC02 at 3000 x 3000 x 1050 mm, with 60 jets, two water pumps and a total power figure of 7.35 kW, roughly three times the electrical load of WS-PC03 for a similar footprint. If the client wants a stronger massage experience, that comparison is what makes the trade-off visible; if they want the spa to run on a modest supply, the lower-load configuration becomes the argument.
The wider swimming pools and swim spas catalogue covers longer formats with separate relaxation zones and larger jet packages, which suit villas and resort terraces where the spa doubles as the main water feature. Where the brief is a compact plunge-and-hydrotherapy unit for a courtyard, pool deck or villa setback, the square PC-series units are usually the practical fit.
Procurement, Logistics and After Handover
Because a swim spa arrives as a manufactured unit rather than a site-built pool, the order sequence matters. Our custom and OEM service covers bespoke finishes and configuration work, while logistics and door-to-door delivery covers freight forwarding, packaging, container loading and customs paperwork. Confirm the Incoterms, delivery address and unloading arrangements for your site specifically; transit arrangements and import terms are settled case by case, not assumed from a standard service description.
After handover, the practical questions are maintenance access, spare parts for pumps, jets and the control system, and who carries out routine servicing. Agree these with us before approval so the operator manual, warranty terms and spares list arrive with the unit rather than becoming a post-handover problem.
Approval Checklist
- Footprint, depth and delivery route verified against site drawings.
- Structural sign-off for the loaded weight obtained by the engineer.
- Confirmed option list, including heat pump, insulation and steps.
- Electrical load confirmed from the final configuration, not the base sheet.
- Drainage, fill source and water treatment method agreed.
- Delivery terms, unloading plan and commissioning responsibility recorded.
- Spare parts, warranty and servicing route agreed before order placement.
Common Questions Before Sign-Off
Can WS-PC03 be used for lap swimming?
The catalogue entry does not list a swim training system for this model. If counter-current swimming is part of the brief, confirm with us what the selected configuration provides before approval.
Is 2.75 kW the whole electrical load?
It is the total power shown in the catalogue entry for the equipment listed there. Heating options and any additional pumps change the figure, so the electrician should design to the confirmed configuration.
Can the shape or finish be changed?
Catalogue models are configured through the option list; genuinely non-standard shapes are handled as customised spas and need to be briefed at concept stage.
Dimensions, jet counts and power figures quoted here are transcribed from the published product page for Outdoor Swim Spa WS-PC03. Confirm them against your selected configuration before construction documents are issued.