A set of textured melamine cabinets usually spends ten to twenty years in a kitchen before anyone thinks about the supplier again. By then the purchase order, the drawing pack and the person who negotiated it are long gone. That is why experienced buyers judge a cabinet quotation by what happens after the container leaves the port: how claims are handled, whether spare doors and panels can be reordered years later, and who stands behind the hardware. The checklist below covers the after-sales questions worth putting in writing before you place an order for made-to-measure melamine cabinetry.
What the warranty actually covers
Cabinet warranties are rarely one document covering everything. Ask the supplier to separate the coverage into three parts, because each part fails differently in service:
- Carcase and structural components. Boxes, shelves and fixings under load. Ask what load the shelf span is rated for and what counts as a defect versus normal wear.
- Door and panel surfaces. Textured melamine is a decorative laminated surface, so the useful questions are about edge bonding, colour separation along joints, and how the supplier handles a board that lifts or delaminates at the edge banding.
- Hinges, slides and handles. Hardware is usually warranted separately by the hardware maker. Ask which hinge brand and slide model are on the quotation, and whether replacements come from the same batch or only from an equivalent line.
Get the coverage term, what is excluded, and who pays freight on a replacement part. Freight on a single replacement door shipped internationally can cost more than the door itself, so this line matters more than it looks.
Spare parts: the question that separates suppliers
For made-to-measure work, a spare is not an item on a shelf. It is a re-run of a panel to a drawing. Ask these four questions and record the answers:
- How long are your cabinet drawings kept? If the supplier stores approved shop drawings, a replacement door years later can be cut from the original file instead of being measured on site.
- Can you reorder a single panel, or only a minimum quantity? Ask for the practical minimum for one door, one carcase side and one shelf.
- Is the melamine decor still available? Decorative laminates get discontinued. Ask whether the surface you specify now has a documented alternative with a comparable texture and colour, and how close the match is expected to be.
- Who makes the replacement, the original factory or another plant? Batch-to-batch variation in a textured surface is visible under kitchen lighting, so a mixed-origin order can look wrong even when it fits.
Claims process: how a problem is reported and closed
Every buyer says they will report damage promptly. Most do not, because nobody told them what evidence the supplier needs. Ask for the claim procedure in writing before production starts:
- What proof is required? Typically photographs of the packed crate with the label visible, plus close-ups of the damaged panel and the corner protectors.
- What is the reporting window after delivery? Get a number in days, not "promptly".
- Who inspects on site? For an overseas order, confirm whether a local inspector or agent visits, or whether the claim is settled from photographs alone.
- What is the remedy? Replacement panel, refund credit, or a discount against a future order. Replacement panels and credits are different commitments; ask which one applies to your contract.
Installation support and snag resolution
A textured melamine front looks correct only when the fronts are aligned and the reveal between doors is even. Ask how installation support is arranged:
- Are installers supplied, or does the supplier only guide your fitter? Some suppliers send their own team; others provide drawings and remote guidance to a local contractor.
- What on-site guidance comes with the delivery? Numbered crate lists, assembly drawings per unit, and setting-out dimensions for uneven walls and floors.
- How are snags handled after installation? Ask whether adjustment of misaligned doors is included in the support period or charged as a call-out.
SANTERSON lists on-site installation, inspection and snagging, warranty coverage, spare parts and replacement, and ongoing maintenance under its installation and after-sales support service. The company also describes a single coordination path from design and production through logistics and door-to-door delivery to installation, which is useful when one party has to answer for both the panels and the freight damage.
Maintenance guidance you should expect in writing
A supplier confident in its surface will tell you how to clean it. Ask what cleaning agents are approved, which ones to avoid, and what happens if an abrasive cleaner is used on a textured finish. For kitchen work specifically:
- Ask how the surface behaves against steam at the kettle and hob position, and whether the edge banding there needs any extra sealing.
- Ask which cleaners void the surface warranty, so your cleaning contractor is briefed correctly.
- Ask for a written care sheet you can hand to the end user or building manager.
Questions to put in the purchase order
| Topic | What to write into the order |
|---|---|
| Warranty scope | Separate terms for carcase, door surfaces and hardware; named hinge and slide models. |
| Reorder window | How long drawings are retained and whether single panels can be reordered later. |
| Decor continuity | The melamine decor reference plus an approved alternative if it is discontinued. |
| Claim evidence | Photo requirements, reporting window in days, and the remedy offered. |
| Freight on replacements | Who pays shipping on a warranted replacement part or panel. |
| Installation | Whether installers are supplied or guidance is given to your fitter; snag handling period. |
| Handover pack | Approved drawings, decor references and hardware codes delivered with the shipment. |
Confirm the details for your own project
Melamine cabinetry is specified per project, so dimensions, layout, material and finish are fixed in your own drawing pack rather than copied from a catalogue. The textured melamine cabinet line is made to measure, with finish, layout and dimensions set for each space; the same applies to the wider interior fixtures range. Warranty terms, spare-part availability, response times and installation arrangements vary by project and by destination, so treat any published figure as a starting point and have your own terms written into the order before production begins.
SANTERSON — furniture and building materials manufacturer for villa, hospitality and office projects.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com
Enquiry page: https://www.santerson.com/contact/