An island bar unit rarely arrives on its own. It is made to measure, finished to a specified colour and texture, and usually shipped together with cabinetry, worktops and hardware that have to land in the right sequence. This guide walks through how we plan international delivery for a project order of Santerson Island Bar Units — from the drawing stage to handover on site.
Start with the specification, not the container
Every island bar unit in our Bar Cabinets collection is made to order: dimensions, layout, carcass material, door style and finish are set per project. That flexibility is exactly what makes the shipping plan matter, because a made-to-measure unit cannot be swapped on site if a dimension or finish is wrong.
Before any booking is placed we confirm three things in writing with the buyer or their designer:
- Final dimensions and layout, checked against the architectural drawings rather than a sample room.
- Finish schedule — lacquer, veneer, laminate, glass, metal frame — including where light will fall on the surface in the completed space.
- Interface details: worktop overhang, appliance cut-outs, services and lighting points, skirting and floor levels.
Where a project needs the bar to run into the kitchen or living wall, we look at it as part of a wider scheme together with Santerson Integrated Bar Systems, so the carcass depths and trims match across the joinery package.
Consolidating the order into one shipment
Bar units are heavy, and a half-empty container costs more per cubic metre than anyone wants to explain to a client. For most project orders we consolidate the bar cabinetry with other items from the same fit-out — wardrobes, kitchen cabinets, vanities, wall panelling, flooring — so one shipment covers several trades.
| Decision | What we settle before production |
|---|---|
| Packing standard | Export-grade cases with edge protection for finished panels; glass fronts and mirrored components crated separately from carcasses. |
| Container plan | Loading diagram prepared from the packing list, so the bar carcasses, doors, worktops and hardware land in the sequence the site needs them. |
| Delivery terms | Sea, air or rail is chosen against the programme; door-to-door delivery is arranged where the project requires it, otherwise to port of destination. |
| Documentation | Commercial invoice, packing list and certificates prepared per shipment, matched item by item to the purchase order. |
Our Logistics & Door-to-Door Delivery team handles freight forwarding, customs paperwork and shipment tracking, and keeps one coordinator on the order from booking through arrival rather than handing you a different contact at every stage.
Sequencing delivery with site readiness
The most expensive avoidable cost in international cabinetry is storage. A bar unit that arrives before the services are first fix has to be warehoused, inspected twice and moved twice. We therefore align the production schedule with your site programme:
- Approval drawings and finish samples issued early enough for sign-off before cutting.
- Production released in batches that match the installation order on site.
- Arrival window agreed against the site's access, lift or crane availability, and floor levels being screeded.
- Hardware and delicate components sent so they are not opened months before fitting.
For villa and hospitality projects in Australia we work from the published project references on our Project Cases pages, including villa joinery packages in Sydney, Melbourne, Perth and North Turramurra. Import terms, duties and delivery scope are confirmed case by case for each destination; we do not apply a single set of assumptions to every port.
Inspection before the cases leave
Re-sending a finished panel across an ocean takes weeks. Before shipment, units are checked against the approved drawing and finish schedule, doors and drawers are cycle-tested on the sample set, and every case is labelled with its room and position mark so the installation crew can find each component without opening everything.
On arrival we support Installation & After-sales Support, including inspection against a snag list and spare parts supply. Warranty terms, response times and installer arrangements are confirmed in the project contract, since these vary by destination and scope.
Planning your bar package
If the island is one element of a wider fit-out, send us the drawings together with the adjacent joinery — Tall Bar Cabinets, wall units or the kitchen run — and we will quote the package as one production and shipping plan instead of several separate ones.
Send us your drawings
Share the floor plan, elevation and finish schedule for your island bar unit and we will return a specification review, a quotation and a delivery plan for your destination. Contact PHILLIP by phone or WhatsApp on +86-13928214007, email santerson@qq.com, or use our Contact page.