A stacked laundry unit looks simple on a reflected ceiling plan and complicated on site. Two appliances, one narrow footprint, a stack that must clear a finished floor level, services that have to arrive in the right place, and a joinery enclosure ordered months before the tiler arrives. When those four things are not agreed in the same drawing set, the laundry becomes the room where a project loses time. This guide walks through how we coordinate stacked laundry units with design drawings and site conditions, from the first marked-up plan to the final handover.
Why the stack fails when drawings and site do not meet
In villa and apartment work we see the same handful of causes repeated. A reflected ceiling plan shows a neat 600 mm recess. The appliance selection has not been fixed, so nobody knows whether the machine is front-loading or top-loading, or how deep it sits with hoses behind it. Plumbing is set out from a dimension on a scaled drawing rather than a site measurement. The joinery is drawn to the structural wall face while the tiler later adds 20 mm of adhesive and tile. Each item is defensible on its own; together they leave an enclosure that will not close or a door that fouls the machine.
A washer and dryer cabinet is not a stock box with a hole in it. It is made-to-measure joinery that has to absorb the tolerances of every trade around it, which is exactly why we ask for the drawing set and the site condition together rather than one of them alone.
What should already be on the drawings before fabrication starts
We can work from a partial set, but the following items decide whether an opening can be fabricated with confidence or has to wait for a variation. Read this as a coordination checklist you can mark up and return.
| Drawing item | What we need to see | Why it matters |
|---|---|---|
| Floor plan with finish levels | Finished floor level, not structural slab; wall build-up noted (plasterboard, tiled, rendered) | Cabinet width and door reveal are measured to the finished face, so a missing finish note shifts every dimension |
| Appliance schedule or selection status | Model reference where fixed; otherwise capacity class and loading type (front or top) | Depth, door swing and service clearances follow the machine, not the recess |
| Stack elevation | Which appliance sits above which, plus access height for loading | Determines shelf position, vent route and whether a pull-out platform is needed for the upper unit |
| Plumbing and drainage setout | Cold and hot supply, waste outlet height, trap location | Services behind a fixed carcass cannot be moved after the enclosure is installed |
| Electrical setout | Outlet position and height, isolator location, dedicated circuit note | An outlet in the middle of a 600 mm recess collides with the machine back |
| Ventilation route for the dryer | Duct path, termination point, whether recirculating or ducted | Bends and duct length are set by the enclosure depth and ceiling void |
| Adjacent openings | Door swing arcs, window reveal, corridor width outside the room | A cabinet door that blocks a room door is caught far too late in site coordination |
Reading site requirements that never appear on a drawing
The drawing set tells you intent. The site tells you what was actually built. Before we release a stack for production we ask the site team or project manager to confirm four conditions, because they change fabrication and not just installation.
- Floor level and covering. A thick floor build-up raises the base of the stack and reduces headroom above the upper appliance. Where a plinth is proposed, the combined height has to be checked against the ceiling or the soffit above.
- Wall plumb and square. Older villas and renovated bathrooms rarely run square. A made-to-measure carcass can absorb a small out-of-plumb condition with a scribe panel, but only if we know about it before cutting.
- Access route to the room. Assembled tall units may not pass a stairwell, a tight corner or a service lift. Where they cannot, we plan knock-down construction and assemble on site.
- Sequence of trades. Whether the enclosure goes in before or after tiling changes the recorded dimension by the thickness of the finish. We record which one governs and note it on the shop drawing.
The coordination sequence we follow
For project work, including villa fit-outs where the laundry sits inside a larger joinery package, we run the same six-stage flow used across our turnkey solutions: consultation, design and planning, production, logistics, installation and after-sales. Applied to a single stack, it looks like this.
- Brief and marked-up drawings. You send the plan, elevations and any appliance notes. We return questions on the gaps rather than guessing dimensions.
- Shop drawing for sign-off. A dimensioned stack elevation with door handing, shelf positions, service cut-outs and finish callouts. This is the document the site team, the plumber and the electrician should all work from.
- Site verification. Two dimensions are checked against the shop drawing: the clear opening width at three heights, and the depth from finished wall face to finished floor level. Any variance is recorded before production.
- Production. Made-to-measure sizing, material and finish options are fixed at this point, so a late finish change becomes a re-order rather than a paint decision.
- Delivery and installation. Packaging and container loading are planned around the access route confirmed earlier. On-site installation is followed by an inspection walk with the site team.
Where the laundry meets the rest of the fit-out
A stack rarely stands alone. In bathroom and utility projects we usually coordinate it alongside utility tall cabinets for detergents, linen and equipment, plus a work surface for folding. That is where the room stops being an appliance bay and starts working. If the utility cabinet shares a wall with the stack, its depth has to be drawn against the same finished face, or the two units will not sit flush at the return.
In compact apartments the laundry also competes with the bathroom for area. Our compact laundry solutions are specified for exactly that situation, where the layout, finish and dimensions are set around the room instead of the room being adjusted to fit a standard cabinet.
Three questions to answer before you send drawings
First, is the appliance fixed or still open? Second, which dimension governs — finished wall face or structural face? Third, who signs the shop drawing: the designer, the builder or both? Those three answers decide how quickly an opening moves from a marked-up plan into production.
Common coordination failures and how to catch them early
- Depth drawn without hose clearance. The machine fits the recess; the supply hoses and duct behind it do not. Check depth from finished face, including the service zone.
- Door swing clash. A cabinet door opening across a room doorway appears on no single drawing because the two doors belong to different trades. Overlay the plans.
- Upper unit out of comfortable reach. Loading a dryer above shoulder height is a usability complaint that surfaces at handover. Fix the stack order and add a pull-out platform if needed.
- Finish specified after the enclosure is fixed. Handle, hinge and vent details follow the finish selection, so lock it before production.
FAQ
Can you fabricate from a design drawing only, without a site visit?
Yes, for new builds where the finished levels and wall setouts are reliable. We work from your marked-up drawings and return a shop drawing for sign-off, then confirm two governing dimensions on site before production.
What if the appliance is not selected yet?
Tell us the loading type and capacity class. We can design the enclosure to a service zone and shelf position that accepts a range of machines, then close the detail once the model is fixed.
Can the stack be delivered through a narrow stair or lift?
Where the access route does not accept an assembled unit, we plan knock-down construction with on-site assembly. Confirm the access route early, because it changes how the carcass is built.
Do you supply the appliances?
No. We supply the made-to-measure enclosure, storage and surrounding joinery to the appliance dimensions you confirm, which is why an early selection makes the whole package easier to coordinate.
Send us your floor plan, stack elevation and any appliance notes, and we will return a dimensioned shop drawing for coordination with your site team. Contact PHILLIP on +86-13928214007 (phone or WhatsApp) or email santerson@qq.com. Enquiries receive a response within 24 hours during business hours, Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8).