A swim spa submittal is the document set a buyer, architect or contractor reviews before an order is confirmed. For the Outdoor Swim Spa WS-PC07ST, the file has to do two jobs at once: prove that the unit matches the pool deck it is being dropped onto, and record exactly which equipment is inside the quoted price. Below is the package we prepare for this model, item by item.
1. Identification sheet: model, variant and finish
Start with a page that removes any doubt about what is being bought. The WS-PC07ST sits in our configurable outdoor swim and hydrotherapy range, and the same shell is offered in related variants — the WS-PC07ST-S adds an automatic cover option to the listed equipment, while the WS-PC07ST-L carries longer catalog dimensions. A submittal that names only "WS-PC07" leaves the reviewer guessing.
- Model code exactly as ordered, plus the variant suffix if one applies
- Cabinet and coping finish, with a sample reference or photograph of a unit already produced
- Intended installation setting — above ground on a slab or deck, semi-recessed, or fully recessed
- Order quantity and the project reference used on drawings and purchase orders
2. Dimensional drawing for the base and clearances
The catalog lists this model at 7000 × 2400 × 1470 mm overall. The submittal should restate those figures on a dimensioned outline drawing rather than only in a text table, because the drawing is what gets overlaid on the landscape plan.
Alongside the shell itself, show the access zone for the equipment compartment, the position of the filter pump and control system, and the clearance needed for any steps. If the spa is being set into a timber deck or on a pedestal base, state the bearing line and the load path so the structural engineer can sign off without a second enquiry.
| Item recorded in the submittal | What the reviewer checks against |
|---|---|
| Overall envelope 7000 × 2400 × 1470 mm | Deck layout, setbacks, fencing lines |
| Water level and overflow arrangement | Deck height, drainage falls |
| Equipment compartment location | Service access, noise separation from neighbours |
| Steps and entry arrangement | Circulation, child safety, accessibility |
3. Equipment schedule: what is included as standard
This is the section where quotations most often disagree. For the WS-PC07ST, our published product page lists one control system, one swim training system, one filter pump, six jets in total and four LED lights, with a total power figure of 6.55 kW. Put each of those lines in a schedule, and mark clearly whether an item is standard, optional or excluded for the specific quotation being reviewed.
The specification table for this model does not record a water pump line, which is precisely why the submittal must state the pump actually being supplied — size, flow and single- or three-phase supply — instead of leaving it to be inferred from a feature icon.
4. Water treatment and optional additions
Ozone is shown as a standard feature for this model. The catalog options around it include UV sterilisation, sand filtration, heat pumps, additional water pumps, insulation and steps. Each option needs its own line in the submittal with the supplier's model reference, because these items change both the electrical load and the maintenance routine the owner inherits.
- Ozone generator: output rating and the dosing point
- UV sterilisation (optional): lamp type and service interval
- Sand filtration (optional): tank size and valve arrangement
- Heat pump (optional): capacity, noise level and clearance for air intake
- Insulation package: relevant where the spa runs through cold months
5. Electrical and control documentation
The listed total power of 6.55 kW is a starting point for the electrical designer, not the end of it. The submittal should attach the connection diagram, state the supply voltage and phase, list the required protection device and residual-current rating, and identify where the control system is mounted relative to the water edge. If a heat pump or an automatic cover is added, the revised load has to appear in the same document set, not in a later email.
6. Swim training system and how it will be used
The WS-PC07ST is listed with one swim training system, which is what makes a 7 m shell useful for daily lap swimming and rehabilitation rather than only soaking. The submittal should describe the unit's output and control, note whether adjustable resistance is offered on the selected configuration, and confirm the mounting position so swimmers have clear width in front of the current.
Buyers comparing several units often stop at shell length. A short written description of the swim unit — how the flow is generated and adjusted — makes the comparison meaningful, and it gives the design team something concrete to review instead of a marketing phrase.
7. Site logistics, packaging and delivery
A swim spa arrives as an oversized load, so the submittal should record the shipping configuration, packaging type, crate dimensions and weight, the delivery port or site address, and who provides offloading equipment. Our logistics and door-to-door delivery service covers freight forwarding, customs paperwork, container loading plans and shipment tracking, and those documents belong in the same file as the product data so the project team has one reference.
8. Installation sequence and after-sales terms
Close the package with the installation method statement: base preparation, levelling, connection of power and water treatment, commissioning tests, and the handover record the owner signs. Our installation and after-sales support page lists on-site installation, inspection with snag lists, warranty coverage, spare parts and ongoing maintenance — the submittal should state which of these apply to this order and for how long, in writing.
9. Submittal checklist before you send or sign
- Model code and variant suffix match the purchase order
- Dimensioned drawing with clearances and access zones
- Equipment schedule marking standard, optional and excluded items
- Pump and filter specifications with model numbers
- Water treatment arrangement, ozone plus any optional additions
- Electrical connection diagram and confirmed total load
- Swim training system description and mounting position
- Packaging, freight and offloading plan
- Installation method statement and commissioning record template
- Warranty terms and spare-parts list
Ordering through a one-stop supplier
Swim spas rarely sit alone on a project drawing. Poolside loungers, pergolas, outdoor dining sets, paving and wall cladding usually move with them, and split submittals are where coordination errors start. As a one-stop furniture and building materials supplier, we prepare swim spa submittals together with the surrounding outdoor and interior scopes, so one document set covers the whole terrace.
The wider swimming pools and swim spas range includes shorter and longer shells, models with waterfalls or temperature settings, and customised shapes where the site calls for something other than a rectangle.
Request a WS-PC07ST submittal package
Send us the deck plan and the equipment you expect, and we will return the dimensional drawing, equipment schedule and electrical documentation for the configuration you are pricing — along with a quotation that lists every included item.