An open wardrobe looks simple on a drawing, which is exactly why it goes wrong so often. There are no doors to hide uneven carcass heights, no handles to mask misaligned shelves, and no visual noise to cover a finish that reads cheap under bedroom lighting. A custom minimalist open wardrobe is really a joinery package: carcass, hanging rail, shelf spans, drawer bank, lighting provision and fixings, all made to your dimensions. This guide sets out the information a manufacturer needs at the very first enquiry, so quotations are comparable and production does not stall on a clarification email three weeks later.
Why open wardrobes need a more precise brief than closed ones
With hinged or sliding doors, the front elevation carries the design intent and the interior can be relatively conventional. Remove the doors and every dimension becomes visible from the floor to the ceiling. Shelf spans read as horizontal lines across the wall, hanging rails sit at heights you can measure with your eye, and the side panel that faces into the room is a finished face rather than a hidden one.
Three practical consequences follow:
- Exposure sets the material conversation. Panels that will be seen on both faces need a consistent finish on both, and edge treatment becomes a design decision rather than a workshop detail.
- Span lengths matter. A long open shelf carrying folded linen behaves differently from a short shelf holding shoes. Tell the manufacturer what each bay is for, not just how wide it is.
- Dust and display are trade-offs. Open storage asks the owner to accept more frequent tidying. Many projects solve this by mixing open bays with closed drawers or a partial panel, which is a layout decision you should settle before the drawing is issued.
The ten items to put in the first enquiry
Send these in one message and most manufacturers can quote without a site visit. Missing any of them usually means a second round of questions.
| Item | What to provide | Why it changes the outcome |
|---|---|---|
| Room and unit type | Principal bedroom, guest room, walk-in robe, apartment or hotel guest room; quantity of each type | Duty level, hardware grade and finish durability are specified against use |
| Dimensions | Floor-to-ceiling height, width at high and low points, wall depth, position of skirting, cornices, power points and switches | Open wardrobes are usually scribed to the wall; out-of-plumb walls need to be drawn, not discovered on site |
| Layout intent | Long-hang, double hang, shelf bays, drawer bank, shoe or bag area, full-length mirror zone | Determines rail positions, shelf quantities and whether a drawer unit is floor-standing or hung |
| Construction type | Built-in to the wall, freestanding unit, wall-mounted rail-and-shelf system, or a mix across bedrooms | Fixing method, load path and panel thickness all change; see wall-mounted open wardrobes and freestanding open wardrobes for the different families |
| Finish direction | Timber tone, painted surface, matte or gloss, and whether the wardrobe should match existing joinery | Veneer, lacquer, melamine and acrylic behave differently at edges and under light; matching a sample is safer than naming a colour in words |
| Handleless detail | Whether drawers use push-to-open, routed pulls or finger recesses | Affects front-panel thickness and the clearance needed at the floor and adjacent walls |
| Lighting provision | Vertical aluminium channels with LED strip, battery or hardwired, sensor or switch, driver location | Cut-outs for profile lights must be machined in the factory, not routed on site |
| Interface items | Bedsides, architraves, doors, flooring direction and threshold lines | Decides where an end panel stops and whether a scribe is acceptable |
| Access and delivery | Lift size, stair width, service lift dimensions, site address, floor level | Panels are cut to the largest size that physically reaches the room; this constrains joint positions |
| Programme | Required on-site date, trade sequence, and who installs | Made-to-measure joinery has one long lead item: the drawings. Late sign-off moves the whole delivery |
A short worked example
Take a bedroom wall 2,700 mm high and 2,400 mm wide, with a power point at 900 mm on the left return. A brief that reads "open wardrobe, light oak" produces one quotation from every supplier and no two alike. The same brief written as: floor-to-ceiling built-in; left bay 900 mm double hang; centre 600 mm of four adjustable shelves; right 900 mm long hang with a shelf at 2,100 mm above for cases; three drawers under the centre bay; LED strip in both verticals with the driver behind the bottom drawer; skirting removed and the flooring laid before installation — that brief can be priced, drawn and compared.
If you are still exploring how open wardrobes sit alongside closed storage, our metal frame open wardrobes and wood tone open wardrobes show two directions for the same wall: a slim structural frame with shelf brackets, or a panel-based carcass in a warm timber tone.
How SANTERSON works from your brief
SANTERSON is a China-based manufacturer and one-stop supplier of furniture and building materials, operating since 2008, with project work across hospitality, villa and office fit-outs. Wardrobe enquiries reach the same production coordination used for kitchens, vanities, wall panelling and doors, which helps when a bedroom joinery package has to match cabinetry elsewhere in the dwelling.
For an open wardrobe enquiry, our normal sequence is:
- Brief and space planning. You send drawings or photographs with dimensions; we return a layout proposal and 3D rendering for review.
- Detail confirmation and quotation. Materials, finishes, hardware, lighting and internal fittings are itemised so the price is traceable to specification rather than a single lump sum.
- Production and quality control. Panels are machined to the approved drawing, with finish samples available before bulk production where the project requires them.
- Logistics. Freight by sea, air or rail, with commercial invoices, packing lists and container loading planning, delivered door to door.
- Installation support and after-sales. On-site guidance, snag inspection, spare parts and maintenance support for the fitted joinery.
Custom and OEM work is handled in-house, including bespoke finishes and textures, so a wardrobe can be matched to existing joinery or developed as part of a wider built-in furniture package. Where an open wardrobe is one line in a longer schedule, it is usually more efficient to group it with the project's other joinery and interior fixtures — see our interior fixtures range for what else can come from the same production run.
Before you send an enquiry: photograph the wall straight on and from both ends, mark floor-to-ceiling height at three points, note where skirting and cornices will stay or go, and attach any architectural elevation with the room dimensions. Four good photographs and one marked-up plan usually shorten the first quotation round by several days.
Questions worth asking before you commit
Which board should I specify?
Specify by exposure and use, not by brand name. Ask what the core is, how both faces are finished, and how edges are treated on visible panel ends. For a bedroom with timber tones, veneer and wood-grain melamine read differently up close; request samples at the actual viewing distance before you sign off.
Can open wardrobes be supplied for an apartment project where ceiling heights vary?
Yes. Made-to-measure sizing is the normal route, and variation between units is a reason to measure each opening rather than order a standard module. Send the range of heights you are working with and ask for the carcass detail at the scribe.
Do I need to order doors as well?
Not necessarily, but many projects keep some storage closed. A practical pattern is open hanging and shelving for daily items, with drawers or a closed tall cabinet for linens and off-season clothing. Related layouts include open walk in wardrobes for dedicated robe rooms.
What is the one thing that most often delays production?
Late drawing approval. Everything downstream — panel machining, hardware ordering, packaging and container planning — follows the signed elevation. Review the rendering with the actual room dimensions in hand rather than on screen.
Bringing it together
A well-briefed open wardrobe costs less to deliver than a poorly briefed one, because fewer decisions get made for you by default. Give the manufacturer the wall, the use of each bay, the finish direction, the lighting intent and the access route, then ask for an itemised quotation against a drawing you can read. If you would like a layout proposal for a specific bedroom or robe, send the dimensions and photographs to our team and we will price the package against your programme.