A clear glass aluminum frame wardrobe is one of the easiest built-in pieces to love in a showroom and one of the easiest to get wrong on site. The frame looks slim, the glass reads light, and the whole unit disappears into a bedroom wall. But because the doors are transparent, everything the survey misses also becomes visible: an out-of-plumb wall, a ceiling that dips, a skirting that the door cannot clear, or clothes stacked where a shelf was supposed to be.
At SANTERSON, our clear glass aluminum frame wardrobes are made-to-measure. That means the drawing, not the catalogue page, is what determines whether the unit fits. The list below is the same set of measurements and project inputs we ask architects, contractors and homeowners to send before we price a wardrobe package, so that the first quotation is close to the final one.
Why transparent doors raise the accuracy bar
With an opaque door, a 5 mm error hides behind the panel. With clear glass, the same error shows up as an uneven reveal between the door and the wall, a gap at the top of a row, or two doors that meet at different heights. Aluminium frames are also unforgiving in a useful way: they are straight and thin, so they expose the true condition of the surrounding structure rather than absorbing it.
That is why we treat the survey as part of the product. Before any cutting starts, we want to know what the glass will sit next to, not just how big the opening is.
The measurements that actually decide the build
Send dimensions at three heights and three widths for each wall, not a single average. Rooms are rarely square, and an averaged number is what causes a wardrobe to arrive 8 mm too wide for the corner it has to turn.
| Measurement | How to take it | What it controls |
|---|---|---|
| Width at top, middle and bottom of each run | Measure the finished-wall clear width in three places; record the narrowest and widest | Carcass width, number and width of door leaves, whether a filler panel is needed |
| Height at left, centre and right | Measure from finished floor level to finished ceiling level at each end and the middle | Total unit height, scribe or top filler size, whether a top box can run full height |
| Depth at several points along the run | Measure from finished wall face outward, including any skirting, architrave, radiator or pipe projection | Carcass depth, door clearance, whether doors will sit proud of a projection |
| Plumb and level check | Note the deviation per metre on each wall and on the ceiling line | Scribing method, floor compensation, hinge and runner adjustment range |
| Floor finish build-up | State the final floor covering and its thickness, plus whether it is laid before or after installation | Base detail, sliding track height, clearance under hanging garments |
| Skirting, architrave and cornice | Record heights and whether they are removed, scribed around, or retained | Side panel profile, top detail, whether the unit sits flush to the wall |
| Openings and services | Mark switches, sockets, lights, air-conditioning outlets, windows and doors near the run, with distances from each corner | Cut-outs, which bay can be used for hanging, whether a light is fitted inside the carcass |
| Access route at the property | Lift dimensions, stair widths, corridor turns, door widths, parking and crane or hoist needs | Whether the unit ships assembled or in panels, and how it is brought in |
The project inputs that shape the layout inside
Glass doors show the interior, so the internal plan is a design decision rather than a default. Tell us how the wardrobe will be used and we will set the hanging heights around it.
- Who uses it and what hangs. Long coats and dresses need a different rail height from shirts and folded knitwear. Two people sharing a run usually need two hanging zones rather than one long rail.
- Open or closed storage split. Clear glass displays what is behind it. If the plan includes baskets, boxes or off-season items, mix in closed drawers or opaque panels so the front stays calm.
- Drawer and shelf count. Drawers are the most under-specified part of a wardrobe quotation. Decide early how many deep drawers you want for folded clothing and how many shallow ones for accessories.
- Lighting. Interior lighting turns a dark carcass into a usable dressing space, and it needs a power point decided before the panels are made.
- Hardware behaviour. Sliding or hinged doors, soft close, and the finish of the aluminium profile all change the frame sizes and the clearances we have to leave.
Choosing the glass and the frame finish together
Clear glass is one option in a wider set. Tinted, frosted, ribbed and mirrored fronts do the same structural job while changing how much of the interior reads through, and how reflective the front feels in a small bedroom. Because the aluminium profile wraps every door, its colour sets the whole look more strongly than the glass does. A dark frame on clear glass draws hard lines across the wall; a light or champagne frame softens them.
Our Clear Glass Aluminum Frame Wardrobes sit in the Glass & Aluminum Frame Wardrobes collection, with made-to-measure sizing and selectable material and finish options. The same collection covers Frosted Glass Aluminum Frame Wardrobes, Smoked Glass Aluminum Frame Wardrobes and Minimalist Black Frame Wardrobes, so a single project can mix fronts from room to room while keeping one frame system. If you want glass without the aluminium surround, the Aluminum Frame Glass Wardrobes in the Glass Door Wardrobes collection are the alternative starting point.
How this fits a whole-project order
Wardrobes rarely sit alone in a project bill of quantities. In villa and apartment work they are specified alongside built-in kitchen cabinetry, vanity units, doors and wall panelling, and the same levels and finishes have to run through all of them. When these are ordered separately, the tolerance gaps appear at the junctions: where a wardrobe side meets a door lining, or where a skirting stops short of a new carcass.
That is why we handle wardrobes as part of built-in furniture within a single package, coordinated with the joinery, doors and interior fixtures around them. Our custom and OEM service covers bespoke finishes and project-specific dimensions, and one supplier holding the drawings keeps the junction details consistent across rooms.
For buyers coordinating from overseas, the same package travels with it: logistics and door-to-door delivery covers freight, packaging and container loading, and installation and after-sales support covers on-site fitting and inspection. Import terms, duties and delivery scope are confirmed project by project, so treat those as items to agree in your quotation rather than fixed conditions.
A checklist to send with your enquiry
- Dimensioned drawings of each room, with finished floor and finished ceiling levels.
- The three-height and three-width readings for every wall the wardrobe runs along.
- Floor covering type and thickness, plus the sequence: flooring before or after the wardrobe.
- Whether skirting, architrave and cornice are being removed or retained.
- A marked-up plan of switches, sockets, lighting points and air-conditioning outlets.
- Door type (sliding or hinged), profile colour, glass type, and the interior layout you want.
- Quantities per room, delivery address, and access constraints at the property.
- The programme date you need the units on site, so lead time and shipping can be planned together.
Frequently asked questions
Do you supply standard sizes for clear glass aluminum frame wardrobes?
No. These units are made to the dimensions of each project, which is what allows the frame to be scribed to an out-of-plumb wall or a sloping ceiling instead of leaving a visible gap.
Should the wardrobe be measured before or after the room is decorated?
Measure against the finished condition, or state clearly which finishes are still to come and how thick they will be. Paint alone rarely matters; a new floor, a plastered wall or added insulation does.
Can clear glass doors be combined with closed storage in one run?
Yes, and it is usually the better plan. Keeping some bays as drawers or opaque panels gives you somewhere to store what you do not want on display, while the glass bays carry the everyday hanging.
Can sliding doors be used with an aluminium frame?
Yes. Sliding and hinged configurations are both available, and the choice changes the frame sizes and the clearance we need at the top and bottom of the run, so decide it before drawings are issued.
What if my walls are not straight?
Send the deviation readings. Scribe panels, fillers and adjustable bases exist for exactly this, but only if we know how far out the wall is when the carcass is being made.
All dimensions, layouts and finish options are confirmed for each project before production. Service scope, delivery terms and after-sales arrangements are agreed in the project quotation.