A project order of white acrylic wardrobes is only finished when the panels land on site in the right sequence, undamaged, and ready to be installed against the wall tolerances of the rooms they belong to. Because these are made-to-measure joinery items rather than flat-pack stock, the delivery plan has to be built at the same time as the drawings — not after production starts. This guide walks through the decisions a buyer or project manager makes between purchase order and handover.
Why custom wardrobe orders are harder to ship than case goods
A made-to-measure wardrobe is panelised furniture: carcass panels, doors, hardware sets, mirrors or glass where specified, and trims cut to a specific room. The pieces only assemble into a wardrobe when every component for that unit arrives together. That changes the shipping problem in three practical ways.
- Units are grouped by room, so a container that mixes rooms randomly creates installation delays even when nothing is damaged.
- Acrylic-faced and high-gloss door panels have large exposed faces; edge and corner protection matters more than for textured melamine.
- Spare parts cannot be bought locally in matching finish. If one door panel is damaged, the replacement is a new production run and a new shipment.
Planning around these three facts — room grouping, face protection, and long replacement lead times — is what separates a smooth installation from a site that stops with half a wardrobe standing.
Step 1: Lock the drawings before you plan anything else
Wardrobe dimensions are taken on site, and international freight cannot absorb re-measurement. Before any delivery discussion, confirm:
- Final room finishes — floor, ceiling and wall build-ups — because they change net wardrobe height and the reveal around doors.
- Door swing or sliding clearance against skirting, bed frames, and light switches shown on the layout drawings.
- Internal configuration per unit: hanging sections, drawers, shelving, and any glass or mirror panels.
- Finish reference for each project, since white acrylic is specified as a make-to-measure finish option along with the rest of the acrylic wardrobe range.
SANTERSON's project workflow runs from design and detail confirmation into production, logistics and installation, so the drawing sign-off is also the point where the delivery plan becomes reliable rather than approximate. Details are on the one-stop solution service page.
Step 2: Decide who carries the freight and where risk transfers
The single most useful decision in international delivery is the Incoterm, because it fixes who books the vessel, who clears customs, and who pays if a panel is damaged at sea. Two common arrangements for joinery project orders:
| Arrangement | Who arranges sea freight | Who clears import customs | Best fit |
|---|---|---|---|
| Door-to-door from the supplier | Supplier's forwarder, coordinated to site | Handled as part of the delivery arrangement | Builders and developers without in-house import teams; multi-room joinery that must arrive together |
| Port-to-port with your own agent | Your freight agent | You or your broker | Buyers who already run their own import programme and want control of inland transport |
SANTERSON's logistics service covers sea, air and rail freight forwarding, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Confirm the exact Incoterm, insurance cover and inland leg for your site in writing on the proforma invoice; marketing scope is not a contract term.
Service scope is listed on the furniture logistics and door-to-door delivery page.
Step 3: Sequence production with the site programme
Wardrobes are installed after wet trades, flooring and painting are complete, but they must be produced early enough to clear ocean transit. Work backwards from your installation date:
- Installation date — the day the fitter needs a dry, finished, accessible room.
- Site delivery window — allow storage space and a receiving crew; joinery should not be the first trade's cargo to arrive on a shared site.
- Ocean transit and customs clearance — booked by the forwarder, but you need realistic buffer for inspection or documentation queries.
- Production and finishing — acrylic door panels are surface-critical; rushing this stage is where visible defects come from.
- Measurement and drawing sign-off — cannot start until the room finishes are fixed.
For multi-unit developments, split the order into release batches by floor or building rather than producing everything at once. Batching reduces on-site storage pressure and lets you verify one installed sample wardrobe before the remaining units ship.
Step 4: Specify packaging and container loading for panelised goods
Ask for the packing list to be organised exactly the way the installation will be run. Practical requirements worth putting in the purchase order:
- Each wardrobe unit packed as one labelled set, with carton marks showing project, room or unit number, and a piece count per carton.
- Edge and corner protection plus face protection on acrylic and gloss door panels; rigid separators between panel faces.
- Hardware, runners, hinges and handles boxed separately from panels but referenced to the same unit number.
- A packing list that matches the drawing schedule, so the fitter can find "Bedroom 3 left-hand tall unit" without opening cartons.
- Container loading plan that keeps heavy carcass panels on the floor and door panels upright and braced against shifting.
Glass or mirror components, where specified in a configuration, need their own crating and separate handling note. Confirm how they are packed before the container is stuffed, not after.
Step 5: Get the import documents right the first time
Documentation errors cause more delay than cargo problems. For a joinery project order, expect and check:
| Document | What to verify before it is issued |
|---|---|
| Commercial invoice | Correct Incoterm, currency, unit values, and description that matches the goods actually loaded |
| Packing list | Carton count, marks, weights and room/unit references consistent with the labels on site |
| Bill of lading | Consignee and notify party correct for the importer of record; container and seal numbers legible |
| Certificate of origin | Issued as required by the destination country's import rules |
| Insurance certificate | Cover value, insured party, and whether damage in transit and inland delivery are both included |
Import duty rates, permits and timber-related requirements differ by destination and change over time. Have your own broker or agent confirm the rules for your country against the HS classification on the invoice; do not rely on a supplier's general statement about coverage.
Step 6: Inspect on arrival, then protect the claim window
Receiving is where most avoidable losses happen. Run the same checks at every delivery:
- Container seal intact and number matching the paperwork before doors are opened.
- Carton count against the packing list, counted, not estimated.
- External damage on cartons holding door panels — photograph before unpacking.
- Open one full unit set and check panel dimensions against the drawing schedule.
- Any shortage or damage recorded on the delivery note and reported with photos the same day.
Claims have short windows. A damaged acrylic door panel found three weeks after the container was emptied is difficult to attribute to transit, and the replacement will not arrive before installation finishes. Report immediately with carton marks, photographs and the affected unit number.
Step 7: Installation and spare parts
Wardrobe installation exposes building tolerances — out-of-plumb walls, uneven floors, floor-to-ceiling heights that differ from the drawings. Two safeguards:
- Confirm site levels and set-out before panels are unpacked; scribe and trim allowances should be agreed on the drawing, not improvised.
- Order spares with the main shipment: matching door panels for high-risk rooms, plus spare hinges, runners and handles. A matching white acrylic panel produced later will need the same finish batch and a separate freight cost.
On-site installation, inspection of snags, warranty coverage, spare parts and maintenance support are described on the furniture installation and after-sales support page. Ask for the specific warranty terms, exclusions and response commitments applicable to your project in writing.
Delivery planning checklist
- Room finishes fixed and site measurements signed off before production release.
- Incoterm, insurance value and inland leg stated on the proforma invoice.
- Order split into delivery batches matched to the site programme.
- Packing list structured by room or unit number, not by panel size.
- Face and edge protection specified for acrylic and gloss door panels.
- Documents checked for consistency before the vessel departs.
- Receiving crew, storage space and equipment access booked for the delivery date.
- Spare panels and hardware shipped with the main consignment.
Common delivery problems and how to avoid them
Mixed-room containers. The fix is a loading plan by room, agreed before stuffing. Cost of getting it wrong: installers idle while cartons are sorted.
Finish damage on gloss faces. Caused by panels sliding against each other and by cardboard alone between faces. Specify rigid separators and corner protection in the order.
Units arriving after painting is complete but with no protected storage. Joinery damaged on site is nobody's freight claim. Book a dry, lockable holding area first.
Re-measurement after shipping. Not recoverable within the order. Sign off dimensions against finished levels, and record the agreed tolerance for scribing.
Get a delivery plan with your quotation. When you request a made-to-measure wardrobe quotation, ask for the packing and container-loading plan, the Incoterm options, and the batch schedule at the same time as pricing. SANTERSON manufactures custom wardrobes and interior joinery as part of a wider range of furniture and building materials for villa, hospitality and office projects.
Transit times, duty rates, import requirements, warranty terms and service response commitments vary by destination and project. Confirm all of them for your specific order with the supplier and your customs agent before signing the purchase contract.