Why the Brief Decides the Quotation
A Santerson Wall Mounted Media Walls unit is not a catalogue item that ships in one standard size. It is a configurable built-in system: the layout, dimensions, finish and the way it carries the television are all specified for the individual room. That is exactly why two enquiries for a media wall of similar width can end up with quite different prices. The information you send us at the start does most of the work in producing an accurate quotation, and the more complete that brief is, the fewer surprises appear later in production.
SANTERSON has worked as a China-based furniture and building materials manufacturer since 2008, supplying villas, hotels and offices. For built-in joinery such as media walls, we normally work from drawings supplied by the client's designer or builder, and our interior design services team can help develop those drawings when a project only has reference images to start from.
1. The Wall and the Room
Wall-mounted media walls fix to the structure behind them, so we need to understand that structure before we can specify the mounting detail or confirm the design is buildable.
- Finished width and height of the wall the unit will sit on, plus the depth you want the carcass to project into the room.
- Floor-to-ceiling or partial height, and whether skirting, cornices, architraves or existing plasterboard joints have to be worked around.
- Wall construction where known — masonry, timber stud, steel stud or a framed false wall. This affects the batten and fixing detail, and on some sites it determines the maximum safe load.
- Floor finish and door heights, because they set the datum line for the whole elevation and decide whether the unit can be built to the ceiling.
- Photographs of the wall from straight on and from the side, with a tape measure in one of them. A single straight-on photo often answers three questions at once.
If you are also considering a floor-to-ceiling option, compare it against Santerson Full Height Media Walls, which behaves differently: it carries its own vertical structure and stores more, but it needs a clear ceiling height and usually a designed backing wall.
2. The Television and the Equipment
The screen is the part most enquiries under-specify. Please tell us:
- Screen size and, if already purchased, the model number — a 55-inch panel and a 65-inch panel change both the recess proportion and the bracket position.
- Mount type: fixed flat to the wall, tilt, or full-motion arm that pulls the screen away from the panel. A pull-out arm needs a solid timber or steel substrate behind the plasterboard, not just the carcass.
- Whether the screen sits in a recessed niche, on an open panel, or is hidden behind doors when not in use. Concealment changes the door size, hinge loading and ventilation requirement.
- The equipment you need to house: console, soundbar, set-top box, games consoles, router or AV amplifier, and whether those devices must be reachable and visible to a remote control while the doors are closed.
3. Storage Layout and How the Unit Will Be Used
Tell us who uses the room. A family living room, a hotel guest suite and a villa lounge are furnished differently, and we design the internal layout around that use rather than offering one fixed plan.
| Element | What to specify |
|---|---|
| Open versus closed | How much display shelving you want against how much concealed storage. Mixed open and closed fronts keep the surface tidy while leaving objects on show. |
| Shelving | Number of shelves, whether they should be adjustable, and what will sit on them — books need a different shelf depth and span than decorative objects. |
| Drawers | Drawer count and intended contents. Deep drawers suit blankets and games; shallow drawers suit remotes and manuals. |
| Doors | Hinged, sliding or lift-up fronts, plus handleless or handled. Sliding fronts need track clearance and a level run. |
| Fireplace or niche base | If an electric fire is planned, give the model so we can allow the correct cut-out and ventilation. |
4. Materials, Finish and Matching
Our custom and OEM service covers bespoke finishes, so the finish question is about matching rather than choosing from a short list. Send us:
- The colour or surface you want — matt, high gloss, wood grain or veneer — with a sample, paint reference or a photograph of an existing item in the room.
- Whether the media wall must match other joinery in the property. Kitchen cabinets, wardrobes and doors are frequently ordered alongside the media wall so that all the veneers and lacquers come off the same production run.
- Edge detail preference: square edge, rounded profile or a shadow gap against the wall.
- Worktop or plinth material where the design includes one, such as engineered stone or laminate.
Where a project needs acoustic treatment behind the panel, or a decorative surface that continues past the unit, we can specify compatible Santerson Textured Panels and related panelling from the same range.
5. Services, Cables and Lighting
This is the section most often left to the last minute, and it is where quotations move if it arrives after production has started.
- Position of existing power outlets, aerial points and data points — measured from a fixed corner of the room.
- How many devices need to plug in, and whether you want an integrated socket strip or cable management hidden inside the carcass.
- Whether the TV cables should be buried in the wall, which normally needs a chase cut before plastering. Tell us if the wall is already finished.
- Integrated lighting: shelf strips, backlighting behind the screen or a lit display niche. Specify whether you want a switch, a remote or a sensor, and where the transformer may be concealed for access.
6. Drawings, Quantities and Delivery
Anything measured helps: an architect's elevation, a marked-up plan, or a sketch with dimensions written on it. A CAD or PDF drawing lets us quote from the same information your site team will build to, and we can return production drawings for approval before manufacture begins.
- Number of units per room type, and how many rooms share that type — a villa with three identical guest lounges is quoted differently from three unique living rooms.
- Project address and the delivery point, since logistics and door-to-door delivery arrangements depend on the destination.
- Programme dates: when the drawings need to be signed off and when the units must arrive on site.
- Whether you want installation and after-sales support, or your own fitters will install from our assembly drawings.
A Quick Pre-Enquiry Checklist
Before you send an enquiry, gather:
- Wall width, height, depth and construction type, with straight-on photographs.
- Screen size or model, mount type, and whether the screen is concealed.
- Storage plan: open shelves, closed cabinets, drawers, door type.
- Finish reference, plus any joinery it must match.
- Outlet and cable positions, and your lighting intention.
- Quantity, project address, required on-site date and installation preference.
With those six items we can normally come back with a worked quotation and a proposed layout. If some of them are still open — which is common at concept stage — send what you have and mark the unknowns as open questions; we will tell you which decisions actually affect price and which can wait until the detail design.
Send us your wall
Email PHILLIP at santerson@qq.com, or reach us on WhatsApp +86 13928214007. Include the measurements and photographs described above and we will respond with a quotation for your media wall project.
Configurable built-in systems are quoted per project. Dimensions, materials, hardware, load limits and electrical details are confirmed on the approved drawings for each order.