A reflective door surface looks decisive on a rendering and unforgiving on site. Gloss shows every uneven wall, every mismatched panel edge and every fingerprint that a matte wardrobe hides. That is exactly why glossy finish melamine wardrobes need a documentation pack that most bedroom joinery specifications never bother with. This article sets out what procurement teams, buying agents and fit-out contractors should record before a purchase order is raised, so the specification survives the trip from quotation to handover.

Why Gloss Is a Documentation Problem, Not Just a Finish Choice

Melamine-faced board is one of the most widely used materials in fitted bedroom furniture because it is stable, repeatable across large orders and easy to keep clean. The glossy variant pushes that repeatability into the open: light travels across the door face, so any deviation in substrate flatness, edge banding or panel alignment becomes visible from a metre away.

For a procurement team this changes what has to be written down. A matte wardrobe specification can get away with "white melamine, 18 mm". A glossy wardrobe specification cannot, because the commercial risk sits in the details: how the panel is cut and trimmed, how doors are aligned on a wall that is never truly plumb, and who signs off the sample before production starts. Every gap in the paperwork turns into a snag list at handover.

The Documentation Pack, Item by Item

Treat the pack as the contract's technical annex. If an item is not written down with a value and a source, it is not agreed.

1. Substrate, Board Thickness and Panel Build-Up

  • Core board type for carcass and for doors, recorded by name rather than by category, with the moisture-resistance grade required for the room.
  • Door thickness and carcass thickness in millimetres, plus the total built-up depth of the door including any backing or mirror.
  • Where a door is double-sided, state that both faces carry the same gloss colour and grade, so the reverse of a hinged door is not substituted.

2. Surface System and Colour Reference

  • The decor or colour code from the supplier's own board range, never a paint chip or a photograph.
  • Named gloss level as the supplier measures and describes it, plus a note of whether the sample is high-gloss or a softer sheen; "glossy" alone means different things across factories.
  • Whether the panel is a single melamine-faced board or a gloss-faced board with a contrasting reverse face.

3. Edge Treatment

This is where glossy wardrobe orders most often go wrong, so it deserves its own line items: edge material (matching ABS or the supplier's standard), edge thickness, colour match on all four edges, and the joint quality at corners. Record whether visible edges face into the room or are concealed, because that determines how strictly the match has to hold.

4. Dimensions, Datum Lines and Site Verification

  • Overall width, height and depth per unit, referenced to a named datum line on the drawing.
  • A written statement of which dimensions are made-to-measure and which are nominal, since built-in wardrobes in villas and apartment projects are sized to the actual opening, not to a catalogue module.
  • Who takes the final site measurement, when it is taken, and what tolerance the wall finish allows. Gloss amplifies out-of-plumb walls, so the packing and scribe strategy should be on the drawing before manufacture.

5. Internal Layout and Hardware Schedule

Record hanging zones, drawer banks, shelf spans and any lighting provision as a schedule with quantities and hardware brands or model references. A glossy door is judged on alignment; hinges and slides of unknown quality are what stop alignment holding after six months of use.

6. Handling, Packing and Protection

Gloss faces scratch in transit and during installation. Specify corner protection, face-to-face interleaving, and whether the protective film stays on through installation. Note who is responsible for removing film and cleaning panels at handover.

7. Approval Samples and Inspection Points

  • A signed physical sample of the actual door, including one edge, held as the approval reference.
  • The inspection points you will use: pre-shipment panel check, container loading record, and a snag walk on site with the sample in hand.
  • The acceptance rule for gloss: viewing distance, lighting condition and what counts as a rejectable defect.

What to Record on the Drawing Itself

Drawing ItemWhy It Matters for Gloss
Elevation with door split and grain directionGloss panels read as one plane; an inconsistent split or direction breaks the visual run across a wall of wardrobes.
Scribe and packing detail at ceiling, floor and side wallsShows how an uneven structure is absorbed without telegraphing through the door face.
Door gap and reveal dimensionsGives installers a measurable target instead of an eye-balled one.
Handleless or handle specificationProfile depth and finger clearance change the built-up dimension and must match the carcass drawing.
Ventilation and appliance clearances where relevantPrevents site improvisation that damages a fixed, finished panel run.

How a Manufacturer's Process Changes the Paperwork

SANTERSON manufactures built-in furniture including the Melamine Wardrobes collection, and each piece is made to measure with material, finish and layout options selected for the individual project. The same principle applies across our built-in furniture range: dimensions are confirmed against site conditions rather than fixed modules, so the documentation you prepare is what converts a drawing into furniture that fits.

Under our custom and OEM service, specification review happens before production, with prototyping and material and finish selection confirmed against the approved sample. Our logistics and door-to-door delivery service covers packaging, container loading and shipping documents, which is where the packing and protection clauses above are enforced rather than assumed. On site, installation and after-sales support closes out the snag list against the same approved reference.

Verification note: board grade, gloss measurement method, edge material and site tolerances are project-specific. Confirm them with the manufacturer for each order; nothing in this article substitutes for a signed sample and a measured drawing.

A Short Checklist Before the Purchase Order

  • Colour code, gloss level and board grade recorded from the supplier range, not a photo.
  • Edge material, thickness and colour match specified for every visible edge.
  • Made-to-measure dimensions tied to a named datum line, with final site measurement assigned to a party and a date.
  • Hardware schedule with brands or model references.
  • Packing and film-protection requirement written into the order.
  • Signed physical sample held as the acceptance reference for the whole batch.

Send us your wardrobe specification

Share drawings, room dimensions and the finish you are working towards, and our team will review the specification with you before production. Use our contact page to start a specification review for your villa, apartment or hotel project.