A round mirrored cabinet arrives on site either ready to hang or with a cracked mirror and a warped case. The difference is usually decided before the carton is sealed. Here is what procurement teams should confirm in writing for the Santerson Round Mirror Cabinet before production starts.
Mirror cabinets are a small line item on most bathroom schedules and one of the first things people notice when they walk in. The Santerson Round Mirror Cabinet is made to order: dimensions, finish, layout and materials are set per project rather than picked from stock. That flexibility is useful on site, but it also means the packing method has to be agreed for each configuration instead of assumed. A round cabinet ordered in quantity for a villa development is packed differently from a single oversized piece going into one bathroom.
1. The unit itself: size, glazing and hardware
Start with the physical facts of the configuration you ordered, because these drive everything else in the packing plan.
- Finished dimensions and weight. Made-to-measure sizing changes carton size, pallet layout and how many pieces fit a container. Ask for packed dimensions, not just product dimensions.
- Mirror specification. Confirm glass thickness and ask for the edge finish and edge-sealing treatment used on a cut round mirror.
- Door or mirrored-front type. Hinged doors need the hinges locked and the door blocked against the case; sliding fronts need the track secured so the panel cannot travel in the carton.
- Integrated lighting. If your schedule calls for an illuminated unit such as the Santerson LED Mirror Cabinet, the driver, wiring and any switch or sensor travel separately from the cabinet. Ask where each item is packed.
- Loose hardware. Fixings, brackets and templates should be listed on the packing list and boxed inside the carton, not taped to the outside where they get lost at customs inspection.
2. The protective layers, item by item
Ask for the packing specification in writing and check that it names each layer rather than saying "standard export packing". A typical mirror cabinet needs:
- Corner protectors on the case, since round and curved profiles take impacts at points a square case does not.
- A protective film or interleaving on the mirrored face, kept on through installation.
- Edge banding protection so finished edges are not abraded against the carton wall.
- Foam or moulded inserts between the door and the carcass, not loose filler that shifts in transit.
- A rigid outer carton for single pieces, and plywood crates or framed cases where the order mixes tall and round units in one container.
If your project also includes taller storage from the same range, such as the Santerson Tall Mirror Cabinet, confirm that mixed loading is planned deliberately. A tall case leaning on a round cabinet in the same container is a common cause of both items being written off.
3. Marking, documents and how the shipment travels
The carton should tell the handling team what to do without anyone opening it. Confirm that cartons and crates carry the project or room reference, a piece number against the packing list, orientation and "fragile / mirror" markings, and that the case is identified so site teams can match it to the bathroom schedule.
On the paperwork side, ask how the units are described on the commercial invoice and packing list, and whether the certificate of origin covers them. SANTERSON's furniture logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Which documents your import clears fastest with depends on the destination, so agree the document set for your own port of entry rather than copying another project's list.
Then settle who inspects what, and when:
| Delivery basis | Who should open the cartons | What to photograph |
|---|---|---|
| Delivered to site or warehouse by the supplier's logistics service | Your receiving team, at delivery, before signing off | Sealed carton condition, then each unit's mirror face and edges |
| Container you clear and unpack yourself | Both parties agree who inspects at the container door | Container seal number, load pattern, shifted or crushed cartons |
| Split shipments across batches | Receiving team at each arrival, matched to that batch's packing list | Batch label against the order line it belongs to |
4. Confirm before you place the order, not after
Put these points in the purchase order so they become part of the order rather than a favour:
- Packed dimensions and packed weight per unit, per configuration.
- The named packing layers for the mirrored face, edges, corners and door.
- Whether lighting components ship inside the carton or in a separate box, and how the two are linked on the packing list.
- Carton and crate markings, plus piece numbering that matches your bathroom schedule.
- Pieces per container and the loading pattern for mixed cabinet sizes.
- Cargo insurance cover for glass-front and mirrored items, and the claim window you must meet.
- The inspection point agreed by both sides, with a photo record requirement.
Ordering with packing already agreed
SANTERSON has manufactured furniture and building materials since 2008 and works on villa, hospitality and office projects, supplying bathroom fixtures alongside the rest of the fit-out so cabinets, vanities, ceramics and lighting arrive under one coordination plan. Send us your bathroom schedule with dimensions, finishes and quantities, and we will confirm the packing specification for each unit together with the freight plan for your destination.
Send your mirror cabinet schedule for a packing and delivery confirmation.
Contact PHILLIP by phone or WhatsApp on +86 139 2821 4007, email santerson@qq.com, or send your drawings, dimensions and quantities as a project enquiry through our team.
Made-to-measure sizing, finish and layout are confirmed per project, so share the room dimensions with your enquiry.