A flush hinged door looks simple on a drawing: one clean leaf, no visible frame shadow, a line that runs with the wall. That simplicity is exactly why approval packages fail later. Once the opening is plastered and finished, corrections move from a mark-up to a site rework. Before your team signs off on Santerson Flush Hinged Doors, six confirmations belong in the approval record, and each one is cheaper to settle on paper than on site.

1. The opening tolerance, not just the nominal size

Santerson's flush hinged door range is supplied as made-to-measure product, with sizing, material and finish specified per project. That flexibility helps, but it only works if the dimension you send matches what the trade will actually build. Confirm which surface the measurement refers to: the structural opening, the finished opening after plaster or cladding, and the floor finish level at the threshold.

  • Who sets out the opening — the door supplier, the framer, or the wall contractor — and who signs off the setting-out drawing.
  • The build-up of the wall on both faces, so the leaf reveals evenly once finishes are applied.
  • Floor finish thickness at the threshold, including any screed, adhesive and topping, which decides the undercut.
  • Whether adjacent openings share a common head or sill line, because one adjusted opening moves the others.

A practical rule: do not let the door schedule carry only width and height. Add wall build-up, finished level and hinge-side notes to every line, so the schedule reads as instructions rather than a wish list.

2. Which flush detail you are actually approving

"Flush" covers several different details, and they resolve differently on site. The Santerson catalogue separates them clearly, so match the specified product to the design intent before approval:

DetailWhat it looks like when completeApproval point that usually gets missed
Flush Hinged DoorsHinged leaf aligned with the wall face, in the Hinged Doors collectionHinge type and position versus the wall build-up and leaf weight
Flush Wall Aligned DoorsLeaf and wall brought to one plane in the Flush / Concealed Doors collectionWhich face is set flush — corridor side, room side, or both
Handleless Concealed DoorsConcealed hardware and no visible handle, for a minimal elevationHow the leaf is opened and held, and what happens when the door must be propped open
Flush Interior DoorsInterior leaf in the Interior Doors collection, sized and finished per projectConsistency of ironmongering cut-outs across a repeated room type
Wood Veneer Hinged DoorsHinged leaf with a wood veneer face, matched to joineryVeneer species, cut direction and grain sequence against the adjacent panelling
Integrated Door & PanelingDoor worked into a panelled wall so the leaf disappears into the compositionPanel module and joint layout drawn before the door position is fixed

If the drawing says "flush to wall" without naming the collection, the order can be built correctly and still look wrong. Rewrite the note with the exact product name from the Windows and Doors range.

3. Finish, grain and the samples that prove it

Finish options are specified per project, which means the approval package should carry a physical reference rather than a colour code. For painted leaves, confirm the sheen level and how the surface takes light along a corridor — a low-sheen leaf beside a high-sheen skirting reads as a defect even when both are correct. For veneered leaves, request confirmation of species, cut, grain direction and the sequence across a pair or a run of doors.

  • Approve a sample leaf or sample board, not a small swatch photographed on a phone.
  • Record the finish boundary: where the door face ends and architrave-free wall begins, since flush details rely on that junction.
  • Check the ironmongering finish against the leaf finish together; brass against warm oak and black against cool grey behave differently under the same lighting design.

4. Hardware, movement and what the wall must carry

Concealed and flush details put more demand on coordination than a standard framed door does. Hinge choice determines whether the leaf sits proud or true, and it interacts with the wall framing behind the opening. Before approval, settle:

  • Hinge type, load rating and quantity for the confirmed leaf size and core.
  • Closing behavior — latch type, damper or hold-open — and how it is concealed within the chosen detail.
  • The backing and blocking behind the opening, agreed with the wall contractor in writing before the frame is closed up.
  • Swing path against skirting, reveals, switches, handrails and any tight corridor geometry on the reflected ceiling or floor plan.

Where a project repeats a room type, confirm that one ironmongering schedule covers all variants. Reissued door leaves with different cut-outs are among the most common rework costs in fit-out packages.

5. Sequence: doors sit between wet trades and joinery

Flush doors fail on programme more often than on product. The leaf must arrive after the wall finishes that set its plane, but before the joinery and floor protection it has to be coordinated with. Santerson's Turnkey Interior Project Solutions service covers design coordination through production, logistics and on-site support, which is where a door package usually benefits from being grouped with the joinery it sits beside rather than ordered as an isolated line item.

  • Fix the setting-out drawing before wall framing closes, not at delivery stage.
  • Confirm storage and handling on site; a large flush leaf stored against a wet wall is a loss, not a delay.
  • Agree who installs and who makes good around the leaf, so the junction is one trade's responsibility, not two.

6. The paperwork that closes the approval

Make the sign-off sheet short enough that people actually complete it. A workable approval record for a flush door package carries:

  • Product name and collection exactly as listed, per opening reference.
  • Confirmed sizes with wall build-up, finished floor level and undercut noted on each line.
  • Approved finish sample reference, dated and initialled.
  • Ironmongering schedule matched to hinge type and leaf size.
  • Setting-out drawing issued to the wall contractor with acknowledgement.
  • Delivery window, storage location and installation responsibility named.

Specification detail for these products is confirmed per order — dimensions, materials and finishes are agreed project by project. Send your opening schedule to SANTERSON with the wall build-up and finish selections, and have the returned confirmation checked against the items above before it enters the contract documents.

Before you sign

The door itself is rarely the problem. The problems are an opening measured off the wrong face, a finish approved from a code instead of a sample, and a flush detail drawn without naming which collection it belongs to. Settle those three with Santerson Flush Hinged Doors on paper, and the site work becomes installation instead of investigation.

Product configurations, dimensions, materials and finishes are confirmed for each specific project before production.