A wall-mounted media unit looks simple on a drawing: a floating cabinet, some open niches, a concealed cable route. Ordering it from an overseas factory is where projects get into trouble. This article walks through how OEM sourcing actually works for floating TV units — what you specify, what the factory confirms, and which decisions have to be locked down before a single panel is cut.
What OEM Means for This Product Type
OEM (original equipment manufacture) production means the unit is built to your specification rather than selected from a stock catalogue. For floating TV units and wider full height media walls, the specification covers made-to-measure sizing, material and finish selection, and a layout drawn around the actual wall. SANTERSON's product listings for this collection state exactly that: dimensions, finishes and layout are project-specific, and each project should confirm its own dimensions and selected specifications.
That distinction matters commercially. A stock item has a fixed price you can drop into a budget line. An OEM unit is priced against a specification sheet, so your quotation is only as reliable as the drawings behind it. Budget accordingly: expect the first number to be indicative and the confirmed number to follow the drawing review.
Step 1 — Send the Wall, Not Just the Furniture
The starting point for OEM floating TV units is the wall itself. Before a factory can quote meaningfully, send:
- A measured elevation of the wall, including ceiling height, skirting, and any protrusions such as switches, air conditioning grilles or downlights.
- The position of power outlets, TV data points and any speaker cabling already in place.
- Wall construction — stud, brick, double brick or lightweight partition. A floating cabinet loaded with a television and equipment needs a fixing substrate the factory can design brackets around.
- Screen size and whether the TV sits on a fixed arm, an articulating arm or a stand.
- The equipment that has to live inside the unit: console, soundbar, decoder, games consoles, and whether any of them need ventilation or remote-control line of sight.
If your project does not have drawings at this stage, SANTERSON's interior design services cover space layout planning, furniture layouts and 3D visual renderings, plus drawing and production coordination. In practice this is where an OEM order usually begins for a villa or apartment fit-out.
Step 2 — Choose the Configuration Family Before You Choose the Finish
Factories quote faster when you tell them which family of media unit you want, because the construction differs. Within the same collection you will typically be choosing between:
| Configuration | Typical use | What changes in the build |
|---|---|---|
| Floating TV units | Living rooms and bedrooms where floor space is tight and a clean shadow line at the floor is wanted | Concealed wall batten and load-rated fixing detail; open cable route behind the unit |
| Santerson Freestanding TV Cabinets | Rental and spec homes, or walls that cannot take a point load | Own base structure; no wall fixing dependency |
| Santerson Integrated LED Media Units | Display niches and feature walls with accent lighting | Lighting channels, driver location, wiring and switching provision |
| Santerson Glass Front Media Units | Display storage that needs dust protection | Glass type, door hardware, hinge or sliding track specification |
| Santerson Open & Closed Combo Units | Family rooms where day-to-day items and equipment share one wall | Mix of open bays and closed carcasses, and the transition detail between them |
| Santerson Storage & Display Combo | Whole-wall schemes that carry storage, display and the screen together | Floor-to-ceiling carcass build, panel joints, and access to services behind the wall |
You can of course combine them — a floating unit below the screen with tall closed storage either side is one of the more common layouts in residential projects. Decide the family first, then worry about the door style.
Step 3 — Specify Materials, Finishes and Hardware
SANTERSON's Custom & OEM service covers custom furniture design and prototyping, bespoke material finishes and textures, OEM manufacturing, flexible minimum order quantities, and brand customisation such as engraving, embossing, logos and packaging. Material choices described on that page include wood, metals, engineered stone and laminates. For a media wall specifically, the specification sheet should state:
- Carcass board and its thickness — this determines how the floating batten is fixed and how much load the unit carries.
- Door face and finish: matte, high gloss, lacquer, veneer or wood-effect laminate, with the exact colour or grain reference rather than a loose name like "grey oak".
- Edge treatment, especially on open niches where the edge is visible.
- Hardware: soft-close hinges, push-to-open or handleless profiles, drawer runners and their load rating.
- Integrated lighting if specified: fitting type, colour temperature, driver position and how the circuit is switched. Lighting and electrical details need confirming for the selected design.
- Cable management: trunking route, grommet positions, and whether a power module is built into the unit.
Where finishes must match cabinetry or wardrobes elsewhere in the project, request the same board and edge banding rather than a colour-matched approximation. Sample panels are worth ordering for any OEM run, because laminate grain direction and veneer tone read very differently on a full-width wall from how they look on a brochure photo.
Step 4 — Drawing Approval Is the Gate
Between quotation and production sits one step that decides whether the order lands cleanly: shop drawing approval. On the approved drawing you should be able to read off, without asking anyone, the overall width, height and depth; the position of every open bay and closed compartment; the fixing method for a floating unit; the cable and socket cut-outs with their dimensions; door swing directions; and the finish code for each surface. SANTERSON's one-stop solution workflow describes design consultation and space planning, material selection and product specification, manufacturing with quality control, project management and site coordination, then final installation and handover — drawing approval is what turns your brief into that production sequence.
Step 5 — Packaging, Freight and Site Sequencing
OEM media units are bulky, heavy and easy to damage at the corners, so packaging and loading detail is part of the order rather than an afterthought. SANTERSON's logistics and door-to-door delivery service describes freight forwarding by sea, air and rail, customs paperwork including commercial invoices, packing lists and certificates of origin, packaging and container loading, shipment tracking and door-to-door delivery. For a floating unit specifically, ask for the wall batten and hardware to be crated separately and labelled, because those parts are small, get buried in the packaging, and are exactly what the installer needs first.
Site sequencing also matters more than people expect. A floating media wall must be fixed after the wall is finished and set out, but before final floor covering protection is laid and before curtains and loose furniture arrive. Put that on the programme with the factory's production window in front of it.
Step 6 — Installation and Snag Close-Out
SANTERSON lists installation and after-sales support among its services, covering on-site installation, inspection and snags, spare parts and replacement, and ongoing maintenance. Warranty terms and response times should be confirmed in writing for your order. For OEM units the handover check is short and specific: level and plumb across the full width; no visible gap between the unit and the wall line; doors aligned with even reveals; every soft-close and runner cycled; lighting circuits tested at the switch; and cables dressed so nothing shows behind the screen.
Where OEM Orders Typically Go Wrong
- The TV size changes after production starts. Screen dimensions change the bay width and the height of the floating unit. Confirm the exact model, or design the bay generously and centre it.
- Socket positions were never relocated. Electricians set out sockets before joinery is specified, then the unit covers them. Move the outlets to match the drawing.
- The wall cannot take a floating load. On lightweight partition, the batten needs to hit studs or be replaced with a floor-supported base — decided at survey, not on site.
- Ventilation is forgotten. Equipment boxed into a closed compartment runs hot. Open the rear or add ventilated access for anything that dissipates heat.
- Finish names drift between documents. One document says "matte grey", another gives a board code. Reference the code everywhere.
A Short Checklist Before You Place an OEM Order
- Measured wall elevation with services marked, signed off by the site team.
- Configuration family chosen and recorded in the specification.
- Board, finish code, edge treatment and hardware schedule complete.
- Lighting and electrical details confirmed for the selected design.
- Approved shop drawing with dimensions, cut-outs, door swings and finish codes.
- Fixing method for the floating unit agreed against the actual wall construction.
- Packaging and crate labelling agreed, with batten and hardware separated.
- Delivery address, access and site programme confirmed before production begins.
FAQ
Can an OEM floating TV unit be made to match existing cabinetry?
Yes, if you specify the same board and edge banding rather than a colour name. Send the board reference from the original project where you have it.
Do I need drawings before requesting a quotation?
A measured elevation is enough to start. Full shop drawings follow once the layout and finishes are agreed, and production waits on their approval.
Is OEM only for large projects?
No. The Custom & OEM service describes flexible minimum order quantities, so single-apartment and small villa orders can be produced to specification as well as multi-unit work.
If you are sourcing media walls or floating TV units for a villa, apartment or hospitality project, send us the wall elevation and screen size and we will come back with a specification and quotation. Reach us through the contact page, or see completed work in our project cases.