A wardrobe quotation rarely goes wrong over style. It goes wrong over the blank spaces: the finish that was never named, the opening that nobody dimensioned, the interior layout assumed by both sides in different ways. If you are specifying matte finish melamine wardrobes for a villa bedroom, an apartment fit-out or a run of guest rooms, the document you send your supplier decides how closely the delivered units match what you pictured. Below is the specification structure we work to on our own made-to-measure projects, written so you can reuse it as a checklist when you request pricing from any joinery manufacturer.
Why matte melamine needs its own wording
Melamine panel is a decorative laminated board: a printed or textured paper layer fused under heat and pressure onto a substrate such as particleboard or MDF. That construction is why it stays flat, resists surface marks and holds colour consistently from one panel to the next — useful qualities across a large wardrobe elevation or several identical bedrooms. Because the melamine range also covers kitchen cabinetry, buyers often specify wardrobes and cabinets together so the panels match; our matte melamine cabinets sit in the same finish family. Finish choice then changes how the same layout behaves day to day.
A matte surface scatters light instead of reflecting it. Fingerprints, dust and fine scratches stay far less visible than they do on a high gloss door, which is the main reason buyers choose it for wardrobes used every morning. The trade-off is that colour reads differently under warm and cool lighting, and wood-grain melamine looks flatter and more natural at low sheen. Within our own catalogue we publish matte, glossy finish, textured, solid colour, two tone and wood grain melamine wardrobe variations, because the panel you specify has to match the rest of the joinery in the project.
The eight blocks every wardrobe specification needs
1. Room schedule and opening dimensions
List each wardrobe by room or unit number, then record width, height and depth of the opening — plus floor-to-ceiling height if the unit runs to the ceiling. Note out-of-plumb walls, skirting boards, architraves, built-in columns, air-conditioning ducts, downlights and switch plates that will cut into the run. Give every dimension in one unit (millimetres is the joinery convention) and state whether the figure is a finished external size or a structural opening.
2. Door type and clearance
Say explicitly whether each opening takes hinged, sliding or an open freestanding arrangement, and name the door style. Sliding doors need track depth and enough clear floor line for the panels to travel; hinged doors need swing clearance in front of the unit and a stated hinge side. Bedside furniture, doors and bed frames frequently block a swing that looked fine on a plan. For sliding arrangements, our matte sliding door wardrobe designs show how the panel split reads across different widths — useful when you are deciding between two and three panels on a wide run.
3. Panel, substrate and edge banding
Specify door thickness and carcass panel thickness, the substrate type, and the edge treatment. Edge banding is the detail most often left blank in an enquiry: state that all visible cut edges are banded, name the colour or material of the band, and say whether you want a matching or contrasting edge. On matte doors a poorly matched band is obvious at arm's length.
4. Finish code and grain direction
Give the finish by supplier reference where one exists, otherwise attach the sample and quote its batch. For wood-grain melamine, state the grain direction on every panel — vertical on doors, consistent across drawer fronts — because rotating a single panel changes the whole elevation. If you are mixing finishes in one room, list which panels carry which finish so nothing is guessed at factory.
5. Interior layout
Draw the interior for each unit: hanging sections with rail heights, shelf positions and spans, drawer banks, shoe or accessory storage, lighting provisions. Long unsupported shelf spans sag over time, so give a span for each shelf and let the manufacturer confirm the panel thickness behind it. Where you want adjustable shelving, say so; fixed and adjustable shelves are quoted differently. If the storage mix leans toward folded clothes rather than hanging garments, say which sections prioritise shelves and which prioritise drawers, because that changes both the carcass build and the price.
6. Hardware
Name hinges, slides, handles or profile pulls, and state whether integrated handleless routing or a finger pull is required. Note soft-close requirements and the number of drawers per unit. Hardware is where substitution quietly happens if the specification is silent — an unnamed slide is a slide the factory chooses.
7. Tolerances, scribes and site conditions
State how the unit meets an uneven floor or wall: scribe strips, filler panels, plinth height and whether the plinth is adjustable. Confirm how the wardrobe resolves around cornices and skirting. A single line on this saves a site visit.
8. Packaging, delivery and installation
Record panel marking and packing method, the delivery address and access route, floor level, lift or stair constraints, and who installs. If you are importing from overseas, ask for a packing list by unit number that matches your room schedule, so the right panels go to the right bedroom. Our logistics and door-to-door delivery service covers freight forwarding, customs paperwork and container loading; our installation and after-sales support page covers on-site fitting and inspection. Confirm scope, cost and timing for your specific site rather than assuming a standard package.
A specification sheet you can copy
| Field | What to write |
|---|---|
| Unit reference | Room or dwelling number, matching the drawing set |
| Opening size | W x H x D in millimetres; finished size or structural opening stated |
| Door type | Hinged, sliding or open; panel count; hinge side; swing or track clearance |
| Door and carcass panels | Thickness, substrate, finish reference, edge band colour |
| Interior layout | Rail heights, shelf spans and adjustability, drawer counts |
| Hardware | Hinge, slide and handle type; soft-close; pull detail |
| Site interface | Plinth height, scribe or filler panels, skirting and cornice treatment |
| Delivery and install | Marking system, packing list, access constraints, installer responsibility |
Common gaps that turn into variation orders
- Finish named only as "matte white" or "light oak" with no reference or sample attached — two factories will supply two different boards.
- No grain direction stated on wood-grain doors, so one elevation reads in two directions.
- Edge banding left unspecified, then charged as an upgrade.
- Sliding door track depth not accounted for in the opening, discovered after the plaster is finished.
- Hinge side assumed by both parties and assumed differently.
- Interior layout described in words rather than drawn, so drawer banks land where a hanging rail was intended.
How this fits into a wider fit-out
Wardrobe joinery rarely sits alone. In a villa or apartment package it shares wall lines, colours and materials with kitchen cabinetry, doors, wall panelling and flooring. Specifying each trade against one drawing set and one finish schedule prevents the mismatch you see when melamine wardrobe doors arrive beside a lacquered vanity in a nominally identical neutral tone. If several trades come from one source, ask for the whole joinery schedule to be reviewed together before production starts — that is where conflicts get resolved cheaply. As a one-stop furniture and building materials supplier, we handle wardrobe, cabinetry and interior fixture specifications in one coordination cycle, and our custom furniture design and prototyping service covers bespoke finishes and layouts where a standard panel range does not fit the drawing.
Before you send the enquiry: every opening dimensioned in millimetres; finish referenced or a sample posted; door type, count and hinge side named; edge banding specified; interior layout drawn to scale; hardware listed by type; site interface described; delivery address, access route and installer identified. A specification that answers those eight points comes back with a comparable price from every supplier you approach.
Send us your wardrobe schedule
Share drawings, room dimensions and finish references for your melamine wardrobe package, and we will quote against the specification you provide, with made-to-measure sizing and material options confirmed before production.
Contact: PHILLIP · Phone/WhatsApp: +86-13928214007 · Email: santerson@qq.com