A curio cabinet is one of the smallest pieces in a villa or apartment fit-out and one of the easiest to get wrong. Because it is made to measure, every decision - case dimensions, glass, shelving, lighting, finish - has to be closed before the order goes into production. Here is the checklist we work through with buyers and designers before we build Santerson Curio Cabinets.

Curio cabinets sit in the Built-in furniture / Display Cabinets group of our range. The published product page describes them as configurable display cabinets for residential living projects, with finish, layout and dimensions specified to suit each space, and lists made-to-measure sizing together with material and finish options. That configurability is the whole point - and it is also why "send us a photo of something you liked" is not enough to start production.

1. Confirm the opening, not just the cabinet

Made-to-measure means the cabinet is built around a fixed space. Before drawings are issued we need the site dimensions of that space recorded as finished-face measurements: width, height and depth from the completed wall, floor and ceiling surfaces, not the structural shell. In a project where plasterboard, skirting, cornices or wall panelling are still to be installed, those layers have to be included in the number or agreed separately.

  • Which wall or recess the cabinet occupies, with a marked-up drawing or site photograph.
  • Floor and ceiling finishes that will sit around the case, and their build-up thickness.
  • Whether the cabinet is built into a niche, fixed against a finished wall, or freestanding with a shadow gap.
  • Any skirting, architrave, cornice or panel run the case has to scribe to or cut around.

2. Confirm what is going inside the cabinet

Shelf spacing follows from the collection, not from a standard grid. Send us the largest and smallest pieces you intend to display, with their dimensions, and tell us whether shelves are fixed, adjustable on pins, or glass. This single decision changes shelf thickness, load support and the vertical module of the whole case.

It also decides the door strategy. A cabinet holding ceramics or a collection that needs dust protection is specified with glass doors; an open display unit behaves differently and belongs to our Open Display Units line instead. If the piece has to hold weight - books, stone objects, metalwork - say so at specification stage, because it affects shelf span and the need for intermediate supports.

3. Confirm glass, doors and hardware

Glass is a visible safety item as well as an aesthetic one, so it should be written into the order rather than left to the factory. The points to close are:

ItemWhat to decide before production
Glass type and thicknessToughened or laminated glass, clear, low-iron, tinted or ribbed, and the thickness used for doors and side panels.
Door styleHinged, sliding or lift-up; opening direction; whether doors meet a reveal or overlap the carcass.
FramingFrameless glass, slim metal frame, or a timber-moulded frame matched to the carcass finish.
HardwareHinges, slides, handles or integrated pull profiles, and whether soft close is required.
SecurityLocking on doors where the collection warrants it.

4. Confirm lighting while the carcass is still open

Lighting is the decision most often deferred, and the one that is most expensive to fix afterwards. A display cabinet specified with internal lighting needs cable routes, transformer position and a switch or sensor location resolved in the drawings, because those run inside the carcass and through the adjacent wall. Our Integrated Cabinet Lighting is listed as configurable, with electrical specifications and compatibility to be confirmed for each cabinet design; the same applies when lighting is built into a Illuminated Display Cabinet, whose product page states that lighting specification and electrical details must be confirmed for the project.

  • Where power and the feed to the cabinet will come from, and who supplies that first fix.
  • Fixture type and position: shelf-mounted, top-crown, vertical wash or a low-level base accent.
  • Colour temperature and dimming, matched to the room lighting rather than chosen in isolation.
  • Transformer and driver access - every driver needs a reachable point for replacement.

5. Confirm finish against a physical sample

Our Custom & OEM service covers bespoke finishes and textures, with material choices including wood, metals, engineered stone and laminates. For a cabinet that sits against an existing wall colour or repeats the joinery language of a room, request a physical sample of the carcass, door panel and interior lining, then approve it in the room where the cabinet will stand. Screen-rendered colours are not an approval basis for a made-to-measure order.

Decide at the same time whether the interior back panel is finished to match the exterior, whether the plinth or base is continuous with adjacent cabinetry, and how edges meet neighbouring worktops and panelling. Those junctions are what make a display cabinet read as built-in rather than dropped in.

6. Confirm coordination with the rest of the fit-out

A curio cabinet rarely stands alone. In villa and apartment projects it usually continues a wall of cabinetry, so the same module lines, reveal sizes and handle details have to carry across from Glass Front Bookshelves, tall cabinets or media walls in the same room. Send us the drawings for the surrounding work, not only the cabinet detail, and we will match to them.

Delivery sequence matters just as much. Glass-fronted cases with installed lighting are best scheduled after wet trades, painting and flooring are complete, and after site access is clear for a glazed item. Tell us the site condition you can guarantee for hand-over and we will plan production to it.

7. Confirm what you receive on delivery

Our turnkey scope runs from design and production through door-to-door logistics, installation and after-sales support. For a single made-to-measure cabinet, agree in writing which of these apply: crated or carton packing, who carries out the glazing, whether the unit arrives assembled or flat-packed, who fixes it to the wall, and how glass is inspected on arrival. Our Installation & After-sales Support service covers on-site installation, inspection and snag resolution, spare parts and maintenance for interior projects.

Approval point before production starts. We recommend releasing manufacture only once the following are signed off: site-measured dimensions, shelf layout with load assumptions, glass specification and door type, lighting layout with driver access, approved physical finish samples, and the delivery and installation sequence. Any item still open at that stage is a change order later.

Send us the drawings and the collection

The fastest way to price a curio cabinet accurately is to send the room drawing, the wall elevation, and a list of the objects to be displayed with their sizes. From that we can return a specification sheet showing dimensions, glass, shelving, lighting and finish options for your approval before anything enters production.

Talk to us about custom display cabinets for your project. Contact SANTERSON - phone and WhatsApp +86-13928214007, email santerson@qq.com - and send the elevations and the display list to start a specification.