A Two Piece Washdown Toilet 1038A, Dual S Trap & P Trap Ceramic WC Toilet is usually ordered long before the bathroom floor tiles are laid. That timing surprises a lot of procurement teams: the trap type and rough-in dimension decide which waste connection the plumber has to build, and once the screed is poured those positions are fixed. An installation plan that treats the WC as a finishing item rather than a first-fix coordination item is the reason change orders appear on hotel guest-room jobs.
The plan below covers what belongs in the document set for this model — trap and rough-in confirmation, flushing supply, close-coupled components, glaze and cleaning access, matching fixtures in the same series, spares, packaging and delivery. It is written for contractors, developers and FF&E buyers specifying ceramic sanitary ware for hotel guest rooms, serviced apartments and villa bathrooms.
1. Trap type and rough-in dimension, confirmed room by room
The 1038A is offered with two waste arrangements: a wall outlet P-trap with a 180 mm rough-in and a floor outlet S-trap with a 250 mm rough-in. Those two numbers are the single most important entries in the whole plan, because they tell the plumber where to set the soil connection before the screed goes down.
Do not carry one dimension across a whole project. Guest-room bathrooms built on a suspended slab normally take the floor outlet; a ground-floor cloakroom or a bathroom with a joisted floor may need the wall outlet instead. A practical way to keep this straight is to issue a room-by-room schedule that names each bathroom, the trap type for it and the rough-in measurement, then have the mechanical contractor sign that schedule before any waste pipework is set out.
2. Flushing supply and cistern configuration
The 1038A uses a washdown flushing arrangement with a close-coupled two-piece pan and cistern, so the plan has to record where the cold supply terminates and at what height, plus whether the cistern is supplied complete with its internal mechanism or whether mechanisms are packed separately for site fitting. Both options appear on multi-unit jobs, and they change the labour sequence.
- Isolation valve position behind or beside the pan, accessible without removing the cistern lid.
- Supply pressure and flow verified against the flushing performance stated on the technical sheet for the order, room type by room type.
- Whether the mechanism is pre-fitted, and if not, who fits it — factory, or the site plumber at second fix.
- Stop-cock finish and trim to match the tapware schedule, so the valve does not become a visible mismatch after handover.
3. Close-coupled components and what arrives loose
A two-piece toilet is delivered as separate pan and cistern, fixed together on site. The plan should list every component that has to be present for the unit to function, and identify which items travel loose rather than assembled.
| Item | Why it belongs in the plan |
|---|---|
| Ceramic pan (1038A) | Main body; vitreous china, glazed on all visible and internal waste surfaces. |
| Cistern with lid and push button or lever | Finish of the actuator must match the tapware schedule for the room type. |
| Flush mechanism inside the cistern | Confirm whether pre-fitted or packed loose; affects second-fix labour. |
| Pan-to-cistern connecting set and seals | Worn or missing sets are the most common cause of a leak call-back after handover. |
| Waste connection to suit the trap type | P-trap and S-trap connections differ; order to match the room schedule, not one standard item for the whole job. |
| Floor fixings and sealing | Fixing centres and sealant type recorded so floor tiles are not cut back later. |
| Seat and cover | Confirm whether seats ship with the pans or are ordered separately against the hardware schedule. |
Writing this list into the plan protects both sides at delivery. The packing list can be checked item by item, and any short-shipment is identified while containers are still open rather than when a bathroom team reaches second fix on the top floor.
4. Glaze, cleaning access and housekeeping requirements
The 1038A carries a smooth glazed surface on vitreous china, which resists dirt adhesion and keeps daily cleaning short. For a hotel operator this is an operating-cost item, not just a cosmetic one, so the plan should record what housekeeping will actually do to the unit.
- Cleaning chemicals approved for glazed ceramic, agreed with the operator before handover — abrasive powders and strong acid descalers dull the glaze over time.
- Access around the pan base and behind the cistern for routine wiping; note the sealant joint so housekeeping knows what to inspect.
- Descaling frequency in hard-water areas, recorded against the water report for the site.
5. Coordinating the rest of the sanitary set in the same series
Guest-room bathrooms rarely specify a WC alone. The 1038 series includes matching pieces, and specifying from one series keeps ceramic colour, glaze sheen and profile consistent across the room — a mismatch between pan and basin that only shows up once both are fitted under bathroom lighting.
- Wall Hung Basin 1038WB for guest rooms and cloakrooms where the wall-mounted look and clear floor area are wanted.
- Floor Standing Bidet 1038F for markets and room categories where a bidet is part of the standard bathroom specification.
- Wall Hung Toilet 1038W where a concealed-tank wall-hung WC is specified instead of the floor-mounted 1038A — same design language, different support frame and rough-in detail.
- Bathroom Sanitary Fixtures range for the remaining fixtures in the same fit-out package.
Record which rooms take the floor-mounted pan and which take the wall-hung version. The two need different support arrangements, so mixing them within a room type without noting it on the drawings is another common source of rework.
6. Quantities, spares and batch consistency
Order from the room schedule, then add spares at handover rather than after the first call-back. A sensible spare holding for a multi-unit job covers the parts that fail or go missing during operations: flush mechanisms, cistern lids and actuators, pan-to-cistern connecting sets, waste connections for both trap types, and a small number of complete pans held in store.
Where a project phases across more than one order, ask for the ceramic colour and glaze batch to be recorded on each shipment. Later top-up orders from a different firing batch can read slightly differently against installed units, which matters most in rooms with strong daylight.
7. Packaging, delivery and storage on site
Ceramic sanitary ware breaks in transit and in the warehouse, not usually in use. The plan should state how units are packed for the journey they will actually travel — export containers, then last-mile delivery to a lift-served hotel site or a villa with no vehicle access.
- Packed quantities per carton and per pallet, so unloading labour can be planned against the container count.
- Breakage allowance written into the order terms, with inspection on arrival while cartons can still be photographed.
- Storage location: dry, level, off the ground, away from the trades doing plaster and tile cutting, with cistern lids stored separately from pans.
- Delivery sequence matched to the room handover order, so pans are not sitting on site for months before the waste pipework is ready.
8. Lead times, customisation and one-stop supply
Bulk orders and project-specific requirements — quantities split across trap types, coordinated series specification, seating and hardware schedules — are handled through Custom & OEM Service. Because SANTERSON supplies furniture and building materials as well as sanitary ware, the same procurement round can cover bathroom fixtures, wall and floor finishes, joinery and loose furniture for the same guest-room package, coordinated through Turnkey Solutions. Fewer separate suppliers means one coordination point for drawings, production slots and delivery windows.
Freight is arranged by sea, air or rail with customs paperwork handled as part of Logistics & Door-to-Door Delivery. Import terms, duties and transit arrangements should be confirmed for the specific destination and order before the production slot is booked. After delivery, installation support, snag inspection, warranty cover and spare parts are handled through Installation & After-sales Support; ask for the current written terms for your project rather than relying on general figures.
A short checklist before you release the order
- Room-by-room schedule naming trap type and rough-in for every bathroom, signed off by the mechanical contractor.
- Flush supply positions, isolation valve locations and mechanism fitting responsibility recorded on the drawings.
- Component list per unit confirmed against the packing list at delivery, including seats and waste connections.
- Housekeeping chemical list agreed with the operator; descaling interval noted for hard-water sites.
- Matching 1038 series pieces specified room by room, with wall-hung and floor-mounted variants clearly separated.
- Spare parts holding defined at handover, plus ceramic batch recorded per shipment on phased orders.
- Packaging, breakage allowance, storage and delivery sequence written into the order terms.