A swim spa roughly ten metres long is not a product you can approve from a brochure alone. Before the shell of a custom outdoor swim spa such as model WS-130BⅨ-U goes into production, the buyer and the factory have to agree on dimensions, equipment list, power supply, site preparation and delivery terms. The checklist below follows the order we work in, so each item can be closed out before the next one starts.
Most misunderstandings on long swim spa orders come from one habit: treating the model code as a fixed specification. A code such as WS-130BⅨ-U tells you the shell family and the catalog footprint. It does not tell you which pumps are fitted, how the unit is heated, what the local supply requires, or who lifts it into place. Those decisions belong to your project, and they change the price, the shipping plan and the installation sequence.
1. Start With the Footprint You Can Actually Build
The catalog lists this model at 9950 x 3000 x 1430 mm. Read those numbers as a starting envelope, not as the final site opening. Before anything else is fixed, send us a dimensioned drawing of the terrace, deck or garden position, showing:
- The clear internal length and width available, plus the working clearance you want around the cabinet for inspection access.
- Whether the unit sits fully above the deck, partly recessed, or in a sunken pit with a retaining structure.
- The finished water level relative to the deck, which affects steps, handrails and how children and older users enter.
- Load path. A shell of this size holds several tonnes of water. A timber deck that carries people comfortably may need additional bearers before it carries water.
- Drainage and overflow routes, including where backwash and drainage water leave the site.
Where a standard footprint does not suit the plan, shape is also negotiable. Our customizable shape outdoor spa range covers square, round, oval and curved shells with an acrylic interior and structural reinforcement, so a terrace corner or an irregular pool deck does not force you onto a model that wastes space.
2. Fix the Equipment List in Writing, Item by Item
Two units carrying similar model codes can be built very differently. The catalog entries for the 130B shell illustrate the point: the -U variant is listed with water jets, LED lighting and ozone, while the sibling entry also shows a swim training system. Pump counts, jet totals, lighting counts and total power all move between configurations. That is why we ask buyers to sign an equipment schedule rather than quote from a model name.
The specifications captured for this catalog entry are a reasonable base to mark up:
| Catalog dimensions | 9950 x 3000 x 1430 mm |
| Control system | 1 set |
| Water pump | 4 pcs |
| Filter pump | 1 pc |
| Jet total | 23 pcs |
| LED lights | 5 |
| Total power | 11.85 kW |
| Catalog features shown | Water jets, LED lighting, Ozone |
Treat every figure above as the catalog baseline for discussion. The delivered list is whatever your confirmed configuration says.
Options to decide on now, not later
- Swim training system. If daily lap swimming is the reason for buying a long spa, this must be specified at order stage; it shapes nozzle placement and the swim lane length.
- Heat pump. Running water at 37-39 °C in a cool season is a very different duty from a summer-only installation. Heating choice drives running cost, plant space and electrical size.
- Insulation. Cabinet insulation and a cover change heat retention materially. Specify the level for the actual climate of the site.
- Sanitation. Ozone is shown in the catalog entry; UV sterilization and sand filtration are listed options. State which combination you want, since it affects the plant space and the maintenance routine handed to the end user.
- Steps, seating and handrails. These decide entry comfort and how the unit reads from the deck.
Our custom and OEM service covers prototyping, material and finish selection and private labelling, so resellers and project contractors can put their own brand on the cabinet and control panel. If your enquiry is for a resale programme rather than one installation, say so at the first message; the paperwork and packaging differ.
3. Settle the Power Supply Before Production
Total power in the region of 11-12 kW for a configuration like this is not a domestic socket decision. Before we release the electrical assembly, confirm with your electrician (values below are indicative discussion points, not fixed specifications):
- Supply voltage and phase arrangement available at the installation point, and whether three-phase supply is on site.
- Cable size and route from the distribution board, plus the rating of the isolator and protective device.
- Whether heating runs from a heat pump or an alternative source, since heating is usually the largest single load in a spa of this size.
- Local rules on residual-current protection, bonding and equipotential bonding around a water feature. We build to the supply and safety details you confirm; we do not assume your national code.
Changing an electrical specification after production starts is expensive and slows the order. This is the single most common cause of delay on long spa projects.
4. Agree Access, Lifting and Delivery Terms
A shell close to ten metres long with a width around three metres rarely travels as an easy last-mile delivery. Before the unit is crated, review with us:
- The route from the port or depot to the property: bridge limits, turning radii, overhead cables and gate widths.
- Whether a crane, forklift or manual carry is needed, and whether the deck or pavers must be protected during the move.
- Incoterms and delivery scope. Our logistics service covers sea, air and rail freight forwarding, customs paperwork, packing and container loading through to door-to-door delivery; who handles crane hire and on-site placement must be stated in the order.
- Packaging specification for the shell, cabinet panels and plant components, especially if the unit ships in parts for site assembly.
5. Confirm Quality Checks and Handover
For a custom configuration, ask us to run the checks that matter to your handover file: a full fill-and-leak test, jet and pump function test, control system and ozone operation, LED circuit check, and a photograph record of the wiring and plant bay before crating. We then supply the operating and maintenance notes for the exact configuration built, which is what facility staff or a homeowner actually need in year two.
Installation and after-sales support are part of our turnkey project service, alongside on-site guidance, snag inspection, spare parts and maintenance. Warranty scope, response arrangements and installer involvement vary by market and by project, so we set those terms with you in writing rather than quoting a general promise.
Pre-production checklist
- Site drawing with clear opening, deck level, access route and load path confirmed
- Signed equipment schedule: pumps, jets, lighting, sanitation, heating, insulation, swim system, steps
- Supply voltage, phase, cable and protection details from your electrician
- Delivery scope, lifting method and Incoterms agreed in writing
- Test and handover documents listed, including warranty terms for this market
If you want to compare this footprint with other lengths and layouts in the range, the swimming pools and swim spas catalogue page lists the available models side by side.
Send us your site drawing, target configuration and delivery location. We will return a marked-up equipment schedule, an electrical requirement sheet and a landed-cost option, so you can approve the build before production starts.
Contact: PHILLIP · Phone / WhatsApp +86-13928214007 · Email santerson@qq.com