A cabinet quote is only as good as the information behind it. For shaker lacquer cabinets, a made-to-measure product in our Lacquer Kitchen Cabinet collection, the difference between a rough estimate and an accurate quotation comes down to drawings, finish choices and the details you send with your enquiry. This guide walks through exactly what to prepare, what we will ask you in return, and how the quotation moves into production.

What makes this request different from buying standard sizes

Shaker fronts carry a simple recessed panel and a square frame, which is why they suit both traditional and contemporary kitchens. Because our shaker lacquer cabinets are made to measure, with material and finish options and a layout tailored to the project, there is no fixed price list to point at. The same set of doors in a different carcass height, a different lacquer sheen or a different handle arrangement will cost differently. That is not a drawback; it is the reason the cabinets fit the room instead of the room being adjusted around the cabinets.

For residential kitchen projects we produce these units as part of a wider fit-out, and for hospitality and apartment work we supply comparable Custom Built-in Kitchen Cabinets as interior fixtures. If your enquiry covers several rooms or several units, send it as one package so the cabinetry, wardrobes and other joinery can be quoted against a single set of drawings.

Information to include in your first message

Send what you have; you do not need finished architectural drawings to start. The items below are the ones that let us come back with a quotation rather than a series of questions.

  • Room layout. A measured floor plan or even a hand-drawn sketch with wall lengths, ceiling height, and the position of windows, doors, radiators, soil stack and existing services.
  • Cabinet run and elevations. Length of each wall run, where you want tall units, and which elevations need wall cabinets versus open shelving.
  • Worktop decision. Material and thickness, because worktop depth and upstand change carcass dimensions and door heights.
  • Appliance schedule. Built-in oven, hob, extractor, dishwasher, fridge and any wine cabinet or integrated tall unit, with model numbers where available.
  • Lacquer sheen and colour reference. RAL number, Pantone reference, a photographed sample, or a link to a close page on our site such as Matte Lacquer Cabinets.
  • Hardware preference. Hinges and slides by brand or type, plus handleless profile versus knobs and pulls. State if you want soft-close throughout.
  • Quantity and unit count. Number of kitchens or number of apartment bathroom and kitchen sets, since batch size affects both price and production scheduling.
  • Delivery location and access. Port of entry, final site address, floor level, lift dimensions and any restriction on vehicle size or delivery hours.
  • Target programme. The date you need goods on site, working backwards from your trade sequence rather than a wish date.

How we turn the enquiry into a quotation

Our cooperation steps are straightforward: project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. In practice that means we review your drawings, confirm the specification with you, and issue an itemised quotation covering carcasses, doors, worktops where included, hardware and packaging.

StageWhat happensWhat we need from you
Brief and design proposalWe read your layout, flag conflicts such as door swing clashes or appliance ventilation gaps, and propose a cabinet layout.Measurements, drawings or photographs of the existing space.
Specification confirmationCarcass sizes, door profile, lacquer colour and sheen, hardware schedule, internal fittings.Written sign-off on the finish reference and the appliance list.
QuotationItemised pricing by unit, with packaging and freight options separated so you can compare landed cost yourself.Confirmation of delivery terms and site address.
Production and shipmentManufacturing with quality control, then container loading and shipping arrangements.Deposit as agreed, plus any import paperwork your country requires.
Installation and handoverOn-site guidance, inspection of snags, replacement of any transit-damaged panels.Site readiness: floors, walls and services complete before cabinets arrive.

Questions to ask us before you commit

A good supplier welcomes these. They are also the questions that protect your programme.

  • Which lacquer finish system is proposed for a kitchen used daily, and how is a damaged door panel replaced later?
  • Are carcasses supplied assembled or flat-packed, and what does that mean for on-site labour?
  • What is the lead time from approved drawings to goods leaving the factory, stated in weeks rather than "asap"?
  • How are panels packed for ocean freight, and what is the process if a panel arrives damaged?
  • Which items are standard and which carry a surcharge, such as internal pull-out larder units or integrated lighting?

Common reasons a quote comes back wrong

Most discrepancies trace back to three gaps. First, measurements taken before floor and wall finishes are complete; a 15 mm tile bed changes a run length. Second, an appliance list that arrives after the doors are ordered, forcing a change to tall unit dimensions. Third, colour approved from a phone photograph, since lacquer pigment reads differently under warm and cool light. Send a physical reference or a RAL code, and confirm the sheen in writing.

For whole-house work, cabinetry rarely stands alone. Clients ordering these kitchens often quote Custom Minimalist Bedroom Wardrobe units and other built-in joinery in the same production run, which keeps veneer tones, edge treatments and hardware consistent across the property.

Dimensions and selected specifications must be confirmed for each project. Treat any quotation as final only after you have checked the elevation drawings against site measurements.

Send your drawings to SANTERSON. We are a China-based furniture and building materials manufacturer and one-stop supplier, working on villa, hospitality and office projects with custom/OEM production, door-to-door delivery and installation support.

Phone / WhatsApp: +86-13928214007 (PHILLIP)  |  Email: santerson@qq.com  |  Enquiry form: Contact Us

Factory address: 1st Floor, 2nd Building, District 1, Wanyang Zhongchuang Zone Phase II, No.8, 2nd Road West District, Baochong Industrial Zone, Longjiang, Shunde, Foshan 528318, China