A project order of Wood Tone Open Wardrobes is made to measure, so nothing about its delivery can be improvised. This guide walks through the decisions that actually decide whether a fitted wardrobe arrives ready to install: what you confirm before production starts, how the order is packed and shipped, what you handle at your end, and where problems usually appear.
Why an Open Wardrobe Order Behaves Differently from Loose Furniture
Loose furniture can be swapped, re-ordered or sold on. A built-in wardrobe cannot. Wood Tone Open Wardrobes sits in our Built-in Furniture range and is produced to project-specific dimensions, layout and finish. Every panel, shelf and hanging rail is cut to the drawing you approve, which means a measurement error or a late change does not cost a replacement item — it costs a re-made set of panels and another sea shipment.
Two features of an open wardrobe also change how you plan the freight. First, there are no doors, so panels travel with exposed edges that need edge protection rather than door-grade packing. Second, long side panels and full-height carcasses are awkward in a shared container: they take up linear space that is hard to fill with anything else. Planning the shipment around those long parts, instead of squeezing them into a mixed load, is what keeps the boards flat and the edges intact.
Step 1 — Lock Down the Specification Before Anything Is Quoted
The quotation you sign should describe the same wardrobe the factory builds. For this product, three items are specified per project, and each one has a knock-on effect on packing and shipping:
- Made-to-measure sizing. Confirm finished height, width and depth for every unit against the actual site condition — floor level, ceiling level, skirting, cornice, sockets and any column or beam. Built-in units are fitted to the opening, so the drawing has to match the building, not the other way round.
- Layout. Decide the split between hanging space, shelving and drawers unit by unit, and mark which bay is which on the drawing. Numbered bays mean the cartons arrive labelled in fit-up order.
- Material and finish. Choose the wood tone, board material and surface finish for each project and keep one reference sheet for the whole order. Different tones across a villa or apartment block look like a mistake even when they are intentional.
Our Custom & OEM Service covers design and prototyping, bespoke finishes and flexible order quantities, so a project can match an existing joinery detail rather than adopt a standard size. Whatever you agree, get it back in writing as a specification sheet with the drawing attached — that document is what protects you at customs, at handover and if a claim ever arises.
Step 2 — Decide How the Order Travels
Our Logistics & Door-to-Door Delivery service arranges freight forwarding by sea, air and rail, together with customs paperwork, packaging and container loading. For a fitted wardrobe order the choice of mode is mostly a question of how much volume you have and how the site schedule looks.
| Situation on site | Practical approach |
|---|---|
| A whole villa or several apartments being fitted out, with cabinetry, doors and other joinery in the same package | Consolidate into one container load under a door-to-door arrangement. Fewer shipments means one delivery window to manage and fewer handling events for the panels. |
| A single room or a small set of units | Groupage with other goods bound for the same destination is usually the sensible route; confirm the loading plan so long panels are not crushed under denser cargo. |
| A missing part, a sample finish or something needed before site sign-off | Air freight for the individual component. Long panels rarely fly economically, so treat air as a top-up channel rather than a plan. |
| Phased handovers across several units | Split production and shipment by phase and label each phase separately, so crews are not sorting one large delivery into three sites. |
Whichever route you choose, ask for the packing list in advance and check that it names every unit and bay number. That list is what your site team uses to confirm nothing is missing before the fitters open anything.
Step 3 — Understand Your Side of the Delivery
Door-to-door delivery moves the goods to your address, but it does not absorb everything that happens at the border or on the doorstep. Before the container is booked, confirm with us in writing:
- The Incoterms and exactly where our responsibility ends and yours begins — port, warehouse, or room of fit-up.
- Which documents travel with the shipment: commercial invoice, packing list and certificate of origin are prepared as part of our logistics service; import permits and any destination-side registration are your responsibility unless you agree otherwise.
- Duties, taxes and clearance fees at the destination port, and who pays them.
- Cargo insurance — whether it is included, what value it covers, and who files a claim if damage appears on arrival.
- The delivery address, access conditions and unloading arrangements. A villa driveway and an apartment tower loading bay need very different handling.
These points vary by country and by order, so treat any general figure you read as a placeholder until it is confirmed for your specific shipment.
Step 4 — Receive, Inspect and Fit
Inspection is where most avoidable disputes are settled, and it takes ten minutes per carton if you do it while the goods are still on the dock:
- Photograph the outer packing before opening anything, including any damaged corners.
- Count cartons against the packing list and check the bay numbers against the layout drawing.
- Open a representative sample of panels to check edges, surface finish and colour consistency across the wood tone range.
- Report shortages or damage the same day with photos and carton references, rather than after installation has started.
Our Installation & After-sales Support service covers on-site installation support, inspection and snags, spare parts and replacement, and ongoing maintenance. For a multi-unit project it is worth arranging site coordination in advance so the same team that packed in fit-up order also guides how the units are assembled.
Five Problems That Repeat on Wardrobe Shipments
- Site dimensions taken before finishes were laid. A floor screed or tile bed changes the finished height. Measure after wet trades are complete.
- Late layout changes. Moving a drawer bank after production starts means remanufacture. Freeze the drawing before the order is released.
- Mixed finish references. Two wood tones that read as one tone on a sample card can look mismatched across a whole wall. Approve finishes on a physical sample, not a screen.
- Poor unloading arrangements. Long panels dropped or dragged at the site entrance are the most common cause of edge damage.
- No storage plan on site. Panels stored flat, dry and indoors acclimatise properly; panels leaned against a wall in a damp room do not.
A Simple Pre-Order Checklist
- Final measured drawing per unit, signed off after wet trades and first-fix electrics are complete.
- Confirmed layout for each bay, with numbering that matches the packing list.
- One approved finish reference sheet covering the whole order.
- Agreed Incoterms, delivery address and unloading arrangements in writing.
- Confirmed documents: invoice, packing list, certificate of origin, plus any destination permits you are responsible for.
- Insurance position agreed, with a same-day damage-reporting routine at the site.
- Site programme with realistic clearance and fit-up time built in.
Talk to us about your wardrobe order. Send us the measured drawings, the number of units and the destination address, and we will come back with a specification sheet, a packing plan and a delivery arrangement for that project. If wardrobes are part of a wider fit-out, our Turnkey Solutions team can coordinate joinery, doors and other built-in elements in one package instead of several.