A wall mounted open wardrobe looks simple on a drawing: shelves, hanging rail, no doors, fixed to the wall. It is one of the Wall Mounted Open Wardrobes in our Open Wardrobes collection, and it is also one of the items that causes the most rework when the paperwork behind it is thin. The absence of doors removes visual weight from a bedroom or dressing room, but it removes nothing from the load, the fixing detail, the finish spec or the handover record. Below is the documentation set we ask procurement teams to complete before an order is placed and again before sign-off, so that the item arrives, fixes correctly and matches what was approved.
Why this item needs more paperwork than it appears to
Open wardrobes sit in a difficult middle position. They are not loose furniture that can be swapped on site, and they are not a full-height built-in joinery run with carcasses on the floor and support at both ends. A wall mounted unit carries its load into the wall alone, which means the wall becomes part of the product specification. Doors would have carried hinges, a frame and closing tolerances; open units expose everything instead, so shelf spans, edge detailing and the condition of the visible back panel all become decisions that must be recorded rather than assumed.
Our own catalogue entries for this collection state made-to-measure sizing, material and finish options, and a layout tailored to the project, with a standing instruction to confirm dimensions and selected specifications for each project. That wording is deliberate. It means there is no single standard size or fixed specification to fall back on, and every line below has to be filled in per project.
Document set 1: the dimensional record
Collect dimensions from site, not from the architectural drawing alone, and record them against a named room and wall. For each unit note:
- Overall width, height and depth, plus which face is the finished front elevation.
- The wall construction the unit will be fixed to, and the position of any studs, noggings, services or insulation behind it.
- Floor-to-first-shelf heights, hanging rail heights and the vertical spacing of every open shelf.
- Obstructions: skirting, architrave, switches, sockets, radiators, sprinkler heads, light fittings, ceiling lines and door swings.
- Out-of-plumb and out-of-square readings on the wall face, since an open unit shows any deviation along its full height.
- Around each unit: how the finished front relates to skirting and architrave, whether a scribe or filler panel is required, and who supplies it.
Where the design intent is a flush look against plasterboard, record that as a requirement, because it changes what the wall team has to do before we deliver. If the wall needs packing, strengthening or a service relocation, that belongs to another trade and only appears in the programme if someone writes it down.
Document set 2: loading and fixing
This is where an open wardrobe specification usually fails, because nobody owns it. Record the intended use of each bay, then the load that follows from it:
| Item to document | What to record |
|---|---|
| Bay duty | Hanging only, folded storage, display items, or a mix. Long coats and outerwear load a rail differently from shirts. |
| Shelf span and thickness | The unsupported span of each open shelf and the panel thickness proposed for it, matched to the recorded duty. |
| Wall substrate | Timber or steel stud with plasterboard, masonry, concrete, or an existing finished surface. Fixing type follows the substrate. |
| Fixing method> | Bracket, cleat, rail or concealed hanger system, plus fixings and their spacing, agreed with the site team before manufacture. |
| Who signs off the fixing | The engineer, contractor or fitter who confirms the wall can carry the recorded load. Name them in the file. |
| Site tolerance | How adjustment will be made where the wall face is not flat, and whether packers or a backing batten are used. |
We can build to the fixing detail your team specifies, and we will ask for it in writing. If nobody has settled the load path yet, that gap should appear on the drawing register as an open item with a date, not disappear into a site conversation.
Document set 3: materials, finish and edge detail
Open units show their construction. In a closed wardrobe, an edge band or a rough carcass interior is hidden behind a door; here the same detail faces the room. Specify and record:
- Board material for shelves, uprights and back panel, with the surface finish on both visible faces.
- Edge treatment on every visible edge: solid lipping, matched edge band, or a shadow reveal.
- Colour or grain reference, with the physical sample number signed off, not just a screen image or trade name.
- Back panel type and thickness, whether it is captured in a rebate or fixed on show, and how it meets the wall.
- Where units abut curtains, drapery tracks or lighting, since open storage next to fabric collects marks quickly.
For bedrooms where an open layout is part of a wider scheme, our Custom Minimalist Bedroom Wardrobe work covers the same finish discipline across closed and open elements, which is useful when one room needs both. Where a dressing room has floor space available, Open Walk in Wardrobes give the same open look with floor-borne support instead of a wall fixing, and that difference should be recorded per room rather than applied as one rule across a project.
Document set 4: coordination with other trades
A wall mounted open wardrobe sits in the same plane as several other scopes. Put the sequence on paper before production starts:
- Wall finishes: whether plasterboard, paint or wall paneling is complete and signed off before fixing.
- Electrical: sockets, switches and any integrated lighting, with cable routes confirmed against the unit profile.
- Lighting design: where fittings sit relative to open shelves, so glare and shadows over stored items are resolved in the drawing stage.
- Floor and ceiling lines: where the unit meets both, including any cornice or skirting removal that another trade must carry out.
- Doors and architraves: clearance for handles and door leaves past an open bay.
As a one-stop furniture and building materials supplier, we produce the unit, but wall finishes, electrical work and structural packing are normally other scopes. The documentation that protects the programme is the interface list: who does what, in what order, and what each party signs off.
Document set 5: sampling, approval and change control
- A physical finish sample for every colour and material on a visible face, logged with the room it applies to.
- An approved shop drawing per unit type, dimensioned, with the fixing detail and shelf layout shown.
- A named approver and date against each shop drawing; verbal approvals are re-issued in writing.
- A change log for any revision after approval, including who requested it and whether it affects already-released production.
- Site condition sign-off confirming the wall was ready on the delivery date.
Document set 6: delivery, installation and handover
- Packaging list per unit and room label, so crates go to the right floor rather than into storage.
- Incoming inspection at receipt: panel condition, edge integrity, hardware quantity against the packing list.
- Fixing record on site: method used, any deviation from the approved detail, and who authorised it.
- Snag list closed with photographs of completed units, including a note on finish condition after other trades have worked in the room.
- Care and cleaning note for open shelves, issued to the facilities or owner team at handover.
A short checklist procurement teams can copy
| Before order | Before manufacture | Before sign-off |
|---|---|---|
| Site dimensions and wall construction recorded; bay duty agreed; fixing substrate identified. | Shop drawings approved with named approver; finish samples signed off; fixing detail confirmed with site team. | Wall ready and signed off; fixing method matches the approved detail; snags closed with photographs. |
Two lines in this file prevent most disputes: the load each bay must carry, and the name of the person who confirmed the wall can carry it. Everything else is detail that supports those two entries.
How we support this process
SANTERSON is a China-based furniture and building materials manufacturer that has been operating since 2008, with offices in Vietnam, Singapore and South Africa. For wardrobe work we supply made-to-measure units to the dimensions, layout and finish your team specifies, and our services cover design coordination, custom and OEM production, door-to-door logistics, installation support and after-sales service. Send us the dimensional record, the bay duty and the approved fixing detail, and we will build to them; send only a room name and a photograph, and you will get a quotation that nobody can defend on site.
Project references published on our site include villa and apartment work in Willoughby, Perth, North Turramurra, Melbourne and Sydney, alongside hotel and office projects. Share your drawings, room schedule and wall construction with our team and we will return dimensioned shop drawings for review before anything enters production.
Send your wardrobe schedule and wall details for a made-to-measure quotation
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com
Enquiries receive a response within 24 hours (business hours Monday to Saturday, 8:00 AM to 6:00 PM GMT+8).