A swim spa quotation only works when the buyer and the factory are reading the same sheet. This guide walks through the specification fields we confirm for Outdoor Swim Spa WS-PC01, so purchasing teams, villa owners and project contractors can request a comparable quote and avoid change orders on site.

Why the specification sheet matters more than the model number

WS-PC01 sits in our configurable outdoor swim and hydrotherapy range. The catalogue entry gives you a starting footprint and an equipment list, but the delivered unit depends on which options you select, what your site supply can carry and how the spa is set into the ground or raised on a deck. A specification that records each of these decisions lets us quote the same machine twice, and it lets you compare our offer against another supplier's offer on equal terms.

For project buyers, this sheet also becomes the attachment to your own internal requisition. Interior fit-out teams ordering a spa alongside outdoor furniture, paving and lighting need one document that ties the wet equipment to the surrounding works.

Section 1: shell, footprint and water depth

The catalogue records WS-PC01 at 3000 × 1050 mm. Treat those two figures as the datum line of your specification, then write down exactly what each number covers before you send drawings to a civil contractor:

  • Length and width on plan. Confirm whether the figure is the acrylic shell only or the shell plus cladding and any protruding steps. Deck openings are cut once; the tolerance belongs in the drawing, not in an email reply.
  • Depth and water line. The depth governs seating height, jet placement relative to the body and how much excavation a fully recessed installation needs. State whether you want the rim flush with the finished deck level or raised above it.
  • Access. Note where you want steps, and on which side, plus whether the spa sits on a slab, a timber deck frame or in an excavated pit with a service hatch.

If your site plan cannot accept this footprint, our range includes square-format units such as WS-PC02, and where the space is irregular we produce a customizable shape outdoor spa in square, round, oval or curved layouts with an acrylic shell and structural reinforcement. Record the alternative model or custom geometry on the same sheet rather than starting a new enquiry.

Section 2: jets, pumps and the hydrotherapy duty

The published equipment list for WS-PC01 is a good template for what to ask any supplier to confirm. Write each item as a quantity, not an adjective:

Specification fieldCatalogue entry for WS-PC01What you should state in your own sheet
Jet total53 pcsTotal jets, plus which zones are for seating, back and leg massage
Water pump2 pcsNumber of jet circuits you want to run at once
Filter pump1 pcFiltration cycle expected per day, and whether the spa runs on a timer
Control system1 setPanel location, and whether you need remote or keypad control from the deck
LED lighting1 pcColour or single white, plus any additional underwater lights for the surrounding area
Water treatmentOzoneWhether ozone alone is enough for your usage load or you also want UV sterilization
Total power6.65 kWYour incoming supply, breaker size and whether a heat pump is included in that figure

Note that the catalogue does not list a swim training system for WS-PC01. If your brief calls for lap swimming against a current rather than hydrotherapy seating, say so at the enquiry stage and we will point you to a configuration in the swim spa range that carries one. Getting this wrong is the most expensive specification error in the category.

Section 3: options, insulation and climate duty

Catalogue-listed options for this model family include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so the specification should list the option name, quantity and the reason you need it:

  • Heat pump — state the target water temperature and the months of use. A spa used year-round in a cool climate is specified differently from one used seasonally.
  • Insulation — state whether the unit is exposed to wind on an open terrace or sheltered, since this drives heat loss and running cost.
  • Sand filtration — note the water source and how often the spa is used, because this decides filter sizing and backwash access.
  • Steps — fix the side and the finished deck height so the steps and cladding arrive matched.
Confirm before ordering: included equipment and electrical requirements depend on the configuration you select. The figures above are catalogue entries for WS-PC01; your signed specification is the controlling document.

Section 4: site works, delivery and handover

A complete swim spa specification ends at handover, not at the factory gate. Add these lines to the sheet:

  • Civil and deck interface. Opening dimensions, finished rim level, drainage falls, and who provides the electrical sub-main and isolator.
  • Rigging and access. Truck size, crane or forklift needs, and the path from the delivery point to the final position.
  • Packaging and freight. We arrange sea, air or rail forwarding with the shipping paperwork and door-to-door delivery; confirm Incoterms, insurance and the delivery address on the sheet so the quotation matches the site reality.
  • Installation and after-sales. Record who performs installation, what inspection items are signed off, and which spare parts you want held locally for a project portfolio.

A short checklist to send with your enquiry

  • Model or custom shape, plus plan dimensions and finished rim level
  • Jet count and zones, pump quantity, filtration cycle
  • Control system type and panel position
  • Water treatment: ozone, UV, or both
  • Heat pump target temperature and insulation package
  • Steps position and cladding finish
  • Site supply details: breaker size, sub-main, isolator location
  • Delivery address, access route, rigging method
  • Installation responsibility and after-sales scope

Send us your draft sheet. Share the model, footprint and option list for WS-PC01 — or describe the space you are working with — and we will return a configuration with confirmed equipment quantities, electrical requirements and a delivery plan. Our custom and OEM service covers bespoke dimensions and finishes for villa and hospitality projects where a standard catalogue size does not fit.