A media wall looks simple on a drawing until it reaches procurement. The joinery, the lighting, the screen, the cable routes and the handover notes all sit with different suppliers, and the gaps between them are where projects lose time. If your brief calls for Santerson Integrated LED Media Units, this article sets out exactly what to write down before the order is placed, so the quotation you receive matches the wall your design team drew.

Why integrated LED media units need a different kind of brief

A standard TV cabinet is a box with a shelf. An integrated unit is a system: carcass and doors, an illuminated niche or cove, a recess for the display, concealed storage, and sometimes open display niches that sit alongside closed compartments. Because these units are made to project-specific dimensions and finish options rather than to a fixed catalogue size, the specification you supply is what defines the product. Two projects can order the same model line and receive completely different pieces.

The lighting makes this more sensitive, not less. Once LEDs sit inside the joinery, three separate trades become dependent on one another: the cabinet maker who cuts the channel, the electrical supplier who provides the driver and switching, and the site team who terminates and commissions the circuit. A brief that treats lighting as an accessory line item invites change orders later.

The practical test: if a supplier can quote your media unit without asking a follow-up question, your brief is probably complete. If they come back with three questions about the lighting and two about the screen recess, those answers belong in the next revision of the document.

What to lock down before you request a quotation

1. Wall geometry and clearances

  • Overall width, height and depth of the unit, plus the finished floor level it is measured from.
  • Whether the unit is wall-mounted, floor-standing or full-height to the ceiling slab, since each carries different fixing and load assumptions.
  • Skirting, cornice, recessed shadow gaps or a reveal that the joinery must return into.
  • Position of studs, structural columns, and any existing conduit you expect the unit to conceal.

2. The screen itself

  • Display size and model if already selected, or the maximum screen size the recess must accept.
  • Mount type: fixed, tilt or full-motion arm, and whether the arm sits on a solid backing board inside the carcass.
  • Required depth behind the screen for the arm plus connector clearance, and where the socket outlets will land relative to the panel centre.
  • Ventilation expectation for the recess, particularly where the niche is enclosed on three sides.

3. The LED detail

  • Where the light is going: cove above the screen, shelf-line strip, niche uplight, or a combination.
  • Colour temperature and output level you want, and whether dimming is required.
  • Driver location and how it will be accessed for service — behind a removable panel, inside a drawer bay, or in an adjacent cupboard.
  • Switching and control: wall plate, sensor, or integration with the room control system, and who supplies the control interface.
  • Voltage and safety requirements for the location, which must be confirmed against the electrical schedule rather than assumed from a sample.

4. Storage layout and hardware

  • Ratio of closed to open storage, and what actually goes inside: consoles, decoders, games consoles, books, glassware.
  • Door type — hinged, sliding, lift-up or flap — and whether handles are acceptable or a handleless profile is required.
  • Cable pass-through positions, grommets or brush strips, and provision for a soundbar if one sits below the screen.
  • Hinge and runner quality level you want specified by name, not by phrase such as "premium hardware".

5. Finish and material

  • Board substrate and surface system: veneer, lacquer, melamine, acrylic or a wood-effect laminate.
  • Sheen level, grain direction, and edge treatment on visible returns.
  • A reference standard — a sample you have already approved, a RAL or paint code, or an existing installed finish to match.
  • Which surfaces must be durable to daily handling versus purely decorative.

Reading the specification fields properly

Field in your brief Weak entry Usable entry
Dimensions "Approx. 2400 mm wide" Overall 2400 x 2100 x 400 mm, from finished floor level; site-verified dimension to be confirmed at order
Lighting "LED strip supplied" Cove strip above screen recess plus shelf-line strip; 2700 K; dimmable; driver in adjacent tall unit behind removable access panel; control by others
Screen provision "Space for TV" Recess 1200 x 700 mm for up to 65-inch display, full-motion arm on 18 mm backing board, two sockets and one data outlet at 1400 mm AFFL
Finish "Grey oak" Matte wood veneer to approved sample ref. provided with enquiry; grain running vertically on doors
Scope split Silent Joinery, integrated lighting and driver supplied by manufacturer; first fix, termination and commissioning by site electrical contractor

How custom manufacturing closes the gaps

Because these units are configured per project rather than picked off a shelf, the manufacturer's design and prototyping service is where most of the risk gets removed. Santerson's custom furniture and OEM service covers bespoke dimensions, finishes and textures, 3D modelling and prototyping before production, and material selection across wood, metals, engineered stone and laminates. For a media wall, that means the recess depth, the LED channel and the access panel can be resolved on drawings and in a prototype rather than on site.

Where a project has several villas or a run of identical guest suites, the same configurable line can be repeated with controlled variations — one depth for a bedroom wall, another for a living room — while keeping the finish and hardware schedule identical. Minimum order quantities are set per project rather than at a fixed high threshold, which matters when you are ordering six units instead of sixty.

If your wider package also includes shelving with lighting or a full-height media wall, it is worth specifying those from the same source so the profiles, finishes and lighting components match. Related lines in the same family include Santerson Integrated TV Panels for wall-system applications and Santerson Wall Mounted Media Walls where the unit reads as a wall finish rather than a piece of furniture.

Coordination, delivery and handover

Media units rarely arrive alone. In a villa or hospitality package they usually travel with cabinetry, wardrobes, flooring and lighting from the same fit-out programme, which is where a single supplier handling production, packing and door-to-door freight reduces the number of hand-offs you have to manage. Santerson's turnkey scope covers design consultation and space planning, material selection and product specification, manufacturing and quality control, project management with site coordination, and installation and handover, with freight arranged by sea, air or rail including customs documentation.

For the media wall specifically, three items should appear in your delivery checklist: a fixing detail for the wall it is going onto, an electrical diagram showing driver position and circuit, and a spare-parts list covering hinges, runners and any replaceable lighting module. Ask for these at order confirmation, not at handover.

A short pre-order checklist

  • Site-verified dimensions taken from finished floor and finished wall levels.
  • Screen model or maximum size, mount type and backing board requirement.
  • LED positions, colour temperature, dimming method and driver access point agreed in writing.
  • Clear split of scope between the joinery supplier and the site electrical contractor.
  • Approved finish sample reference attached to the enquiry.
  • Hardware named by type, with door and drawer layout shown on a dimensioned elevation.
  • Delivery location, access route and lift or stair constraints confirmed before packing.
  • Fixing detail, electrical diagram and spare-parts list requested at order confirmation.

Getting an accurate quotation

Send the dimensioned elevation, the finish reference and the lighting schedule together in one enquiry. Santerson is a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, so the quotation you receive will reflect the configuration you describe rather than a standard catalogue item — which is precisely why the brief is worth the extra hour.

Configurable media units are made to project-specific dimensions and finish options. Dimensions, materials, hardware, lighting output and electrical ratings for any given unit must be confirmed against your approved drawings and the project's electrical schedule before production; figures shown in this article are illustrative examples of how to write a brief, not product specifications.