A request for quote for an outdoor swim spa often comes back as a single price on one line, and that is exactly what causes trouble later. When the shell, pumps, jets, filtration, heating and site works are bundled together with no breakdown, nobody can tell what has been supplied until the unit arrives on the foundation. If you are evaluating the Outdoor Swim Spa WS-S06B for a villa garden, a resort terrace or a private wellness area, the quality of your quote request decides how comparable the returned prices really are. Below is the information list we ask buyers to send, item by item.

1. The site conditions before the spa reaches them

The catalogue lists this model at 5800 x 2200 x 1250 mm, but a quotation cannot be built on catalogue dimensions alone. Send us:

  • The access route from the delivery vehicle to the placement point, including gate widths, overhead obstacles and turning space.
  • Whether the unit is going above ground, semi-recessed or fully recessed, and the finished level around it.
  • Bearing capacity of the slab or deck and who is responsible for pouring it.
  • Local climate at the site: frost months, direct sun exposure and wind, which affect insulation and cover choices.
  • Distance from the spa to the electrical supply point and to the drainage point.

These details change the shell build, the plant layout and whether a crane or long-arm lift is needed. A quote produced without them is an estimate, not a price.

2. The equipment set you actually want

The specifications published for WS-S06B show 48 jets in total, three water pumps, one filter pump, one control system, three LED lights with 26 small LED lights, ozone and a waterfall feature, with a total power figure of 13.35 kW. Treat these as the standard configuration shown on the product page, and state clearly in your request which items you want kept, removed or added. Our optional accessory list for this range includes control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps; availability and compatibility vary by model, so we confirm them against the selected build.

For comparison: if your programme is built around lap swimming rather than hydrotherapy seating, the Outdoor Swim Spa WS-S06B-T is listed with a swim training system, one water pump and 40 jets at 5800 x 2200 x 1420 mm. Asking us to price both configurations side by side is usually the fastest way to see where your budget is going.

3. Power supply and control requirements

Electrical information is the most common gap in a swim spa enquiry. Please include:

  • Supply voltage, phase and frequency available at the site.
  • The breaker rating and cable size already installed, or confirmation that your electrician will install them to our specification.
  • Whether you want the total connected load reduced by changing pump or heating capacity.
  • Where the control system should be located and whether remote or app-based control is required.

We confirm included equipment and electrical requirements for the selected configuration before quoting, so send what you have rather than a guess.

4. Water treatment, heating and running assumptions

Tell us how the spa will be used. A resort facility running daily has different filtration and sanitation needs from a private villa used a few times a week. Useful items to state:

  • Expected bather load and daily operating hours.
  • Whether you want ozone, UV sterilisation or sand filtration in addition to the standard system.
  • Target water temperature and whether the spa runs year-round or seasonally.
  • Preference for a heat pump versus electric heating, and any limits on connected power.
  • Drainage arrangement and local rules on discharge water.

5. Scope, delivery and after-sales terms to ask for in writing

A complete quotation from a manufacturer should separate the following so you can compare suppliers honestly:

Item to requestWhy it matters
Line-item pricing for shell, pumps, jets, filtration, lighting and controlLets you see the cost of each element and adjust the specification without re-quoting from scratch
Packaging dimensions, container type and quantityDetermines freight cost and whether the site can receive the shipment
Delivery term and destinationClarifies where our responsibility ends and yours begins
Inspection points before shipmentFixes what is tested and how it is documented
Spare parts list and supply termsPumps, jets and controls are service items over the life of the unit
Installation support and site guidanceDefines who sets the shell, connects plant and commissions the system

SANTERSON is a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, so swim spas are usually quoted as part of a wider package rather than as an isolated purchase. If your project also needs poolside loungers, outdoor dining sets, cabana daybeds or the surrounding paving and wall finishes, send those enquiries together; one coordinated production and shipment plan is easier to manage than five separate ones. See our swimming pool and spa range for the models we currently list.

6. Customisation and finish choices

Where a standard shell does not suit the space, we also produce customized shape outdoor spas in square, round, oval and curved layouts with an acrylic shell and structural reinforcement. If you are considering that route, include a sketch or drawing of the area, the intended seating count and any fixed elements such as steps, benches or a waterfall wall. Custom geometry changes lead time and engineering, so it needs to be identified in the first message rather than after the order.

A practical test before you send: read your enquiry back and check that a supplier could produce a firm price from it without asking a single follow-up question. If they would have to ask about access, power or the jet count, add that detail now.

Send us the site drawings, your power supply details and the equipment list you want for WS-S06B, and we will return an itemised quotation with packaging, freight and installation scope set out separately. The more specific your request, the closer the quoted price will be to the invoiced one.