A folding door is one of the least forgiving items in a fit-out shipment. It arrives as a set of panels, a track and a hardware kit that only work together, so a crushed edge or a missing bracket shows up weeks later at handover — after the opening has been plastered, painted and finished. Before you release a purchase order for Santerson Wood Veneer Folding Doors, agree the packaging specification in writing with your supplier. The five confirmations below are the ones that decide whether a door set reaches site ready to install.

Why Folding Doors Need Their Own Packaging Brief

Unlike a wardrobe carcass or a table, a wood veneer folding door is a matched set: panels cut to a project opening, hinges and pivots that carry the weight, an overhead track, floor guide and jambs. Substituting one panel is not a swap — it usually means remaking several. Two things make the freight risk specific:

  • Veneer faces are cosmetic. A dent or abrasion on a veneer face cannot be filled and sanded on site the way a metal frame can; it normally forces a remake of the whole panel set.
  • Folding hardware is geometry-sensitive. A bent track section or a twisted hinge stile changes the folding line, and the misalignment only appears once the leaves are hung.

Santerson Wood Veneer Folding Doors are made to measure, with project-specific dimensions, layout and finish options. Because each set is built to an opening rather than stocked in a standard size, packaging is not a packing detail — it is part of the product specification.

1. Confirm the Door Set Is Broken Down by Opening

On a villa or apartment project you may be buying several folding sets across different rooms and floors. Ask for each opening to be packed as its own complete set, not mixed into one bundle of panels.

  • Every carton or crate labelled with the room or door schedule number used on your drawings — the same reference your site team will work from.
  • Panel count and hardware kit stated on each label, so a receiver can check completeness without opening the crate.
  • A packing list that mirrors the door schedule: one line per opening, with panel quantities and the fixings included.

This is where packaging affects programme rather than product. A site crew that has to open twelve crates to assemble one door loses a day; a crew that sees "Bedroom 03 — 4 panels plus hardware kit" installs straight from the drawing.

2. Confirm Face Protection for Veneer Panels

Veneer is finished stock travelling face-out. Ask what sits between the panel face and the crate, and what protects the edges:

  • Facing material on both large faces, with corner protection on every vertical edge.
  • No bare timber battens or untreated timber touching a finished face — resin and moisture from raw timber can mark veneer over a long sea leg.
  • Panels separated individually rather than stacked face-to-back with only a sheet between them, which is where transit rubbing happens.

For projects in humid or coastal climates, ask whether the finished panels are packed dry and whether a moisture barrier is used inside the crate. This is a specification point to agree with the supplier for your destination, not something to assume.

3. Confirm Hardware Is Packed Separately and Listed

Track, pivots, hinges, handles and floor guides are small, heavy and easy to lose inside a large crate. Ask for:

  • A separate, clearly marked hardware box per door set — never loose among the panels.
  • An itemised contents list with part names and quantities, so the site team can verify against the installation sequence.
  • Confirmation that adjustment shims, fixings and any wall or floor rails required by the chosen layout are included, and which items are supplied on site by others.

The most expensive folding-door damage is not a scratched panel — it is a complete set that arrives with the wrong track length for the opening. Confirm the packing list states the measured opening size for each set, so the site team can check before signing for the delivery.

4. Confirm Handling Orientation and Crate Build

Tall panels fail in two ways: they are laid flat and snapped in a stack, or they are dropped on edge. Ask your supplier to state the packing orientation and the crate type for your order, and confirm the markings on the outside:

Point to confirmWhat to ask for in writing
Crate typePlywood or framed export crate suitable for the shipment mode agreed for your project
OrientationWhether panels travel upright or flat, and whether that matches how your site unloads and stores them
External markingsDoor schedule reference, panel count, gross weight, and handling marks such as "this side up" where relevant
Stacking limitWhether crates may be stacked in the container and, if so, how many high

The markings matter most at the far end of the journey. Customs examination, port handling and the last-mile leg to site are usually carried out by people who have never seen your order — they will follow what the crate tells them.

5. Confirm How Damage Is Recorded on Arrival

Packaging terms only work if the receiving step is agreed in advance. Before dispatch, confirm with your supplier:

  • What photographic evidence you will send if a crate arrives damaged — outer crate, seal or strap condition, and the affected panel before anything is removed.
  • Whether to keep damaged packing material in place until the claim is raised, rather than clearing the crate.
  • Who on your side signs the delivery note, and whether you will note "subject to inspection" for joinery consignments.
  • How replacement panels are produced and shipped if a set is damaged, and how that affects your installation sequence.

Santerson's service scope covers logistics and door-to-door delivery as well as installation and after-sales support, so the packaging specification and the arrival process can be agreed with the same team that produces the doors — see Furniture Logistics and Door-to-door Delivery. Confirm cargo insurance, Incoterms and the delivery point for your specific project rather than assuming a standard arrangement.

Where Packaging Fits in the Order Timeline

For made-to-measure joinery, packaging is confirmed at the same moment as the technical drawings, because both depend on the final measured opening and the chosen layout. In practice the sequence runs:

  • Specification. Opening sizes, panel layout, veneer species and finish selected for each room.
  • Detail confirmation. Drawings signed off, together with packing method, labelling convention and carton breakdown per opening.
  • Production and inspection. Panel sets checked against the door schedule before crating, not after.
  • Dispatch and arrival. Packing list matched to the delivery note; damage protocol applied if needed.

If folding doors are part of a wider package — as they usually are on villa and hospitality work — the same labelling logic should apply across trades. Turnkey Interior Project Solutions coordinate cabinetry, doors, wall finishes and furniture under one delivery plan, which is where a single consistent reference system earns its keep on site.

A Short Pre-Order Checklist

  • Packing breakdown agreed per opening, using your door schedule references
  • Veneer faces and edges protected; no raw timber in contact with finished faces
  • Hardware boxed separately with an itemised list per set
  • Measured opening size printed on the packing list for each set
  • Crate type, orientation, stacking limit and external markings stated in writing
  • Arrival inspection and damage-evidence process agreed before dispatch

Related Santerson Door Collections

If you are specifying folding systems across a project, it is worth fixing the packaging convention once for the whole door package. Related collections in the same Windows & Doors range include Santerson Glass Folding Doors, where glazing adds its own transit protection requirements, and Classic Folding Doors for panelled layouts.

Frequently Asked Questions

Can folding doors be shipped flat-packed like cabinetry?

Finished veneer panels and matched folding sets are not treated the same way as loose cabinet boards. The question to put to the supplier is which packing method they specify for your set — panel protection, orientation and crate build — and how that matches the unloading and storage conditions at your site.

Who supplies the floor track and wall fixings?

It depends on the layout selected and the finish detail. Confirm in writing which components arrive with each set and which are provided by others, before the first-fix stage sets out the opening.

What should I do if a crate is opened by customs on arrival?

Photograph the crate, its seals and any disturbed packing before removing panels, and record it on the delivery paperwork. Agree this evidence process with your supplier in advance so a replacement can be raised without an argument about what was damaged and when.

Dimensions, veneer species, finish and packing method for Santerson Wood Veneer Folding Doors are confirmed for each project. Send your door schedule and site conditions to the SANTERSON team and we will confirm the specification, packing breakdown and delivery arrangement for your order.