A wall panel quotation rarely fails on price alone. It fails because the drawing, the finish sample and the site condition were never describing the same wall. If you are specifying Santerson Glass & Glossy Panels for a villa or hotel room floor, the supplier can only quote what you can describe. Below is the information set we ask for on every panel enquiry, and why each item changes the number you receive.
1. The wall itself: sizes, not room names
Send dimensions per wall face, in millimetres, with heights measured from the finished floor level rather than the structural slab. Glass and high-gloss panels are cut to the opening, so a 20 mm difference in floor build-up changes both panel height and the fixing detail.
- Total run length and clear height of each face, plus any recesses, niches or return edges.
- Location of doors, skirting, architraves, cornices, sockets, switches and data points that must be cut out or set flush.
- Whether corners are mitred, boxed with a trim, or left as an expansion gap.
- Floor-to-ceiling build-up notes: plasterboard thickness, screed depth, insulation or backing battens already on site.
2. Finish and surface specification
"Glossy" is not a single product. For the Paneling Systems range we ask buyers to state the surface family they want and, where possible, the reference from a physical sample rather than a screen. Glass panels differ from lacquered and laminated surfaces in weight, edge treatment, subframe requirement and how edges are protected in transit.
| What to state | Why the quotation needs it |
|---|---|
| Surface type (glass, high gloss, matte lacquer, textured, stone or marble look, wood veneer) | Determines substrate, panel thickness and edge banding or polishing method. |
| Colour or pattern reference, ideally a sample code | Screen colours shift between devices; a code prevents a re-order of the wrong batch. |
| Gloss level and whether the surface is reflective on one or both faces | Affects protective film, packing orientation and handling on site. |
| Edge detail: polished, chamfered, square or shadow gap | Polished and mitred edges are extra operations priced per linear metre. |
| Fire, moisture or impact requirement for the room | Determines the core and fixing system; wet areas need a different build than a dry corridor. |
3. Substrate, subframe and site condition
Panels are only as stable as what sits behind them. Tell the supplier what the wall currently is and what it will be when panels arrive. A masonry wall, a stud wall with battens and an existing tiled surface each need different fixings and a different level of preparation.
- Existing wall construction and its condition, including any damp or unevenness already surveyed.
- Whether the subframe, battens, adhesive and sealant are supplied by us or provided locally.
- Access for delivery: lift dimensions, stair width, corridor turns and whether panels can be carried to floor.
- Working hours and any site restrictions that affect installation sequencing.
4. Quantities, phasing and the room schedule
Give panel area per wall face and a total for the project, then say how it is phased. Hotel and villa projects rarely install one floor at a time, so we price and pack to match the release order rather than shipping everything in one container.
- Number of rooms or units per panel type, with a room-by-room schedule.
- Any spares allowance you want held for future maintenance batches.
- Installation phases and the delivery date each phase is needed on site.
- Whether matching items are in scope: Glass Sliding Panels, closet fronts, concealed doors or joinery that must match the same finish batch.
5. Commercial and logistics details
These items decide the landed cost more than the panel rate does. Send them with the technical request so a single quotation covers everything instead of three separate revisions.
- Delivery address, port of entry and the Incoterm you want quoted (FOB, CIF or delivered to site).
- Packaging preference: individual protective packing for reflective surfaces, crate size limits for your freight forwarder.
- Payment terms, currency and the buyer of record for customs clearance.
- Any documentation your import process requires, such as commercial invoice detail or packing list format.
How the information comes back as a quotation
With wall dimensions, a finish reference and a site description in hand, we return a panel schedule showing each face, its cut sizes, edge treatment, subframe notes and packing group, priced line by line. Missing dimensions are the usual reason a quotation has to be rebuilt; a full room schedule lets us quote once and hold the material batch for the whole project.
If you are comparing panel options rather than confirming one product, our wider wall panels and wall cladding range covers acoustic, textured, matte lacquer, stone and marble look, and wood veneer surfaces, which can be quoted against the same wall schedule.
Panel thickness, substrate options, fire and moisture ratings, edge details and packaging are confirmed per project and per configuration. The information list above is what we need to quote accurately; specifications are verified in writing before production starts.
Send your wall schedule and finish references and we will return a priced panel schedule for review.