A swim spa the size of Outdoor Swim Spa WS-S07M does not arrive and simply get plugged in. It is a 7-metre shell, a set of pumps, an electrical load, a structural slab and a waterproofing detail that all have to meet on the same day, on the same site, in the right sequence. The equipment itself is only half of the job. Below is how we plan delivery and installation for this model with architects, contractors and project owners, stage by stage.

What WS-S07M Brings to the Site

Before any logistics conversation, the whole team needs one agreed picture of what is being delivered. The figures our catalogue page shows for this model are:

ItemCatalogue specification
Overall dimensions7000 x 2200 x 1480 mm
Water pumps / filter pump3 water pumps, 1 filter pump
Jet total40 jets
LED lights2
Total power (catalogue figure)10.75 kW
Features shownWater jets, LED lighting, ozone, waterfall, 4 water columns
Control system1 set

Those numbers drive every downstream decision. A footprint of 7000 x 2200 mm sets the excavation line and the crane pad. The 1480 mm shell height determines how much spoil leaves the ground and whether the surrounding deck can sit level with the rim. The pump, jet and lighting counts set the plant-room space, the pipework routes and the electrical schedule.

Confirm before you order. The figures above are transcribed from our catalogue page for this model. Options such as heat pumps, UV sterilisation, sand filtration, additional insulation and steps change both the equipment list and the power draw. Other models in the same 7-metre length class also show different jet counts and total power, so do not carry a figure across between models. Treat the total power figure as a starting point for your electrical engineer, and let them size the supply, protection and cabling against the exact configuration you have chosen.

Site Preparation: The Work That Happens Before the Crate Moves

Delivery planning starts months earlier, when the civil drawings are still open. Three items decide whether the installation week runs smoothly:

  • Foundation and perimeter. The shell needs a supporting slab and a perimeter that carries the deck finish at the correct level. Confirm the load case with your structural engineer using the delivered dimensions and the water volume, not a generic detail from another model.
  • Plant space and access. Three water pumps and a filter pump need a ventilated, weather-protected area that a technician can stand in with a tool case. Build access to the equipment before the deck is finished, not after.
  • Electrical route and isolation. Run the supply, the bonding and the isolation points to the agreed position, and keep the control system within reach of both the spa and the plant room. Photograph all buried conduit before backfilling.

We send the equipment layout, connection schedule and dimension drawings with the order confirmation so your team can build against them rather than adapt on site. If your project needs the shell recessed, partially raised, or paired with a different option set, that is settled during specification, because it changes what arrives.

Choosing the Delivery Route and Incoterms

Our logistics and door-to-door delivery service covers freight by sea, air and rail, export paperwork, packing and container loading, shipment tracking and delivery to the site address. For a swim spa, the practical questions are these:

  • Packaging and lifting points. The shell is crated with marked sling positions so the rigger does not have to guess. We confirm the crate dimensions and gross weight with you before booking transport, which is what your crane hire is sized against.
  • Container plan. Where a project also orders other pools and swim spas, outdoor furniture or interior fixtures, we consolidate the load and tell you which container carries what, so nothing waits at customs while the spa sits on a dock.
  • Incoterms and responsibility handover. Agree in writing who books the crane, who clears customs, and at which point site custody transfers to your contractor. Ambiguity here is the single most common cause of a wasted installation day.
  • Documents ready before arrival. Commercial invoice, packing list and certificates of origin should be in your hands before the shipment lands, so clearance does not stall while the foundation crew stands by.

Import duties, permits and transit time are handled case by case for each destination. We do not publish a fixed lead time; we confirm yours against the production schedule at order stage and update you at loading and at arrival.

Sequencing the Installation Week

For this model we work to a simple sequence, agreed with your site team in advance:

  1. Site release and lifting. Crane, route to the excavation and a clear drop zone confirmed on the same drawing. The shell goes in once; moving it twice costs a day.
  2. Levelling and support. The shell is levelled and supported to the agreed detail before any pipework is connected.
  3. Mechanical connections. Water pumps, filter pump, jet circuits, waterfall and water-column lines are routed and pressure-checked.
  4. Electrical connection. Supply, bonding, control system and LED circuits terminated by your licensed electrician against our connection schedule.
  5. Fill, commission and demonstrate. The spa is filled, each pump, jet circuit, ozone unit and light is run, settings are recorded, and the operating briefing for the owner or facilities team is given on site.

Our installation and after-sales support covers on-site installation, inspection and snag lists, warranty coverage, spare parts and ongoing maintenance. Tell us in advance which stages our team performs and which your local contractor handles, so the site programme reflects reality rather than an assumption.

A Pre-Delivery Checklist for Project Owners

Confirm all of these before we schedule production:

  • Final option set: heat pump, UV sterilisation, filtration type, insulation level and steps.
  • Electrical supply available at site, with the engineer's sign-off against the confirmed equipment list.
  • Structural detail for the slab and perimeter signed by your engineer.
  • Crane access, weight limit of any overhead structure, and gate or driveway width on the delivery route.
  • Named site contact who accepts delivery and releases the installation crew.
  • Agreed Incoterms and the point at which custody transfers.

Why One Supplier Makes This Easier

A swim spa rarely stands alone on a villa or resort site. The same programme usually carries outdoor furniture for the surrounding deck, bathroom fixtures, lighting and cabinetry for the changing rooms, and wall or ceiling finishes for the covered areas. As a one-stop furniture and building materials supplier, we put those items on one production schedule, one shipment plan and one point of contact, so the pool deck, the loungers and the joinery reach site in a sequence your contractor can actually build. Where a project needs bespoke dimensions or finishes, our custom and OEM service handles design and prototyping before production starts.

Planning a swim spa on your project?

Send us the site drawings, the option set you are considering and your target installation window. We will return the confirmed equipment schedule, the connection requirements and a delivery plan your contractor can build against. Contact us through the contact page to start that conversation.