A door that disappears into a paneled wall looks effortless in a rendering. It only works when the drawing set, the opening dimensions and the built condition all agree before production starts. This guide sets out how buyers, contractors and designers can specify integrated doors and matching wall panels so the joinery arrives ready to install.

An integrated door and paneling package combines a made-to-measure door leaf with the wall cladding around it, so the two read as one continuous surface. At SANTERSON these items are custom-made: sizing, material and finish are set per project, and the layout follows your drawings rather than a fixed catalogue size. That flexibility is exactly why coordination matters. Order the panels from one supplier and the door from another, or take dimensions from a concept drawing that was never checked against the built structure, and the problems appear on site — after the framing, plasterboard and services are already closed up.

What an integrated door and paneling package covers

Before comparing quotations, fix the scope. A complete package normally includes the door leaf with its concealed frame and hardware, the adjacent panels carrying the same finish across the wall, and the openings and supports the builder must provide. Our Integrated Door & Paneling range is listed with made-to-measure sizing, material and finish options, and a layout tailored to the project — so each of those points needs written confirmation before production.

Related items usually sit on the same wall line. Wall Panel Systems and Wood Panel Partitions carry the finish across longer runs, while Custom Niche Paneling forms recesses and display openings. On the door side, concealed options such as Santerson Handleless Concealed Doors and Santerson Decorative Concealed Doors are specified the same way — by opening size, swing or slide direction, and finish.

Reading the drawings: what to confirm before you order

Purchase orders go wrong when one dimension is read from the wrong document. Work through the set item by item and record what each drawing actually states.

Drawing or documentWhat to confirm for doors and paneling
Floor plansDoor positions, swing direction and clearance against the furniture layout; which walls are panelled, and where each panel run starts and stops.
ElevationsPanel joint layout, reveal and shadow-gap detailing, handleless or decorative door style, and how the leaf aligns with adjacent panel joints and niches.
Sections and detailsWall build-up, frame depth, finished floor levels, skirting treatment, and whether the leaf sits flush with the finished face or set back from it.
SchedulesDoor schedule numbers, sizes and any fire or acoustic duty; finish schedule codes matched to physical samples rather than rendering colours.
Services drawingsSwitches, sockets, trunking, cabling and pipework behind the wall line, plus access panels that must stay reachable through the cladding.

Where a schedule shows a nominal size, treat it as a starting point. Made-to-measure joinery should be produced against dimensions confirmed on site or from a survey, not against a figure set at concept stage.

Site conditions that decide the result

Drawings describe an ideal wall. Buildings rarely deliver one. Three checks prevent most installation problems:

  • Level and plumb. Record floor levels and wall alignment along the whole panel run. A frame set a few millimetres out of plumb reads as an uneven gap from top to bottom.
  • Floor finish build-up. Confirm the completed floor level at each threshold. Undercut, swing clearance and any pocket-door track depend on it.
  • Substrate and fixing method. State what the panels and frames fix to — masonry, studwork or backing battens — and who supplies that substrate. Concealed frames need solid, correctly positioned support.

Sliding and pocket doors add one more variable: the wall cavity has to be built around the track and leaf before closing plates go on. If the pocket is not shown on the builder's drawings, raise it as an information request instead of assuming it will follow.

Sequencing: who does what, and when

Integrated joinery fails more often through timing than workmanship. A practical sequence runs like this:

  1. Fix design intent — door style, panel layout and finish samples — on approved drawings.
  2. Survey and confirm dimensions against the built condition; issue a dimension sheet for sign-off.
  3. Release production once sizes, finishes and hardware are confirmed in writing.
  4. Builder prepares openings, substrates and service routes to the agreed setting-out.
  5. Fit frames first, then panels and leaves, after wet trades and floor finishes are complete.
  6. Inspect the installed line against the approved sample; record and close snags before handover.

Our Installation & After-sales Support service covers on-site installation, inspection and snagging, spare parts and ongoing maintenance, so the team that produced the joinery can also fit it. Where the layout is still developing, Interior Design Services include space planning, 3D visualisation and coordination between drawings, production and site.

A checklist for the enquiry

Send these items with your request and the quotation will be right first time:

  • Relevant plans, elevations and sections, plus door and finish schedules.
  • Confirmed opening sizes, or a note that dimensions are to be surveyed.
  • Swing or slide direction, handing, and whether the leaf is hinged, sliding, pocket or concealed.
  • Finish reference — veneer, lacquer, laminate or stone look — with a sample code where possible.
  • Substrate type and completed floor levels at each opening.
  • Delivery address, access constraints and the intended installation window.
A note on specifications. Product pages for these ranges list made-to-measure sizing and material and finish options rather than fixed dimensions or a single board specification. Materials, thicknesses, hardware and performance ratings are confirmed order by order, so treat any figure in a brochure or rendering as indicative until your own dimension sheet is signed off.

Why source doors and paneling from one manufacturer

When the leaf, frame and surrounding panels leave one production line, the grain match, sheen level and joint detailing are controlled in a single batch. That removes the two complaints we hear most on site: a door that matches its own sample but not the panel beside it, and a reveal no drawing ever defined. It also means one dimension sheet, one delivery and one point of responsibility for adjustments.

SANTERSON has manufactured furniture and building materials since 2008 and supplies custom and OEM work for villa, hospitality and office projects. Our Custom & OEM Service covers bespoke finishes and textures, prototyping and flexible order quantities, and Furniture Logistics and Door-to-door Delivery handles freight documentation and container loading. Villa projects we have recently supplied in Sydney, Melbourne, Perth and Willoughby included cabinetry and wall joinery specified in the sequence described above.

Send us your drawings

Share the plans, elevations and door schedule for the wall line, and we will return a dimension sheet, finish options and an itemised quotation before anything enters production.

Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com | Contact page