A request for quote that only names a basin and a quantity will come back with a price you cannot compare. On an undermount installation the basin is only half of the job: the countertop cut-out, the tapware deck, the waste and trap, the fixing method and how all of it travels to site all affect what the number actually covers. Below is the information we ask buyers to send when they want a firm quotation for a Santerson Undermount Basin, and why each item changes the result.

Start with the room, not the product

The undermount basin in our Countertops & Basins range is a configurable product for residential bathroom projects. Finish, layout and dimensions are set per project rather than chosen from one fixed size. That means a quote request that says "10 pieces, white" is not yet quotable at the level you need.

Send us the context first: which project, which room type (main bathroom, ensuite, guest powder room, guest-room bath in a small hotel or serviced-apartment scheme), how many sets, and whether the vanity below it is being supplied by you or by us. If the vanity, countertop and basin come from one supplier, we can coordinate the cut-out and the storage layout together — see our Santerson Integrated Countertop Vanity when you want basin and top produced as a single unit.

The dimensions we need in writing

For an undermount basin the critical measurement is not the outside of the bowl, it is the relationship between the bowl, the cut-out and the counter. Please include:

  • Overall vanity or counter width and depth, plus the counter thickness you are working to.
  • Basin outer dimensions and the required cut-out dimensions, with the inset margin you expect on each side.
  • Position of the tap hole or tapped deck, and whether your taps are wall-mounted, deck-mounted or tall basin mixers.
  • Waste and trap arrangement — bottle trap or P-trap, offset from the wall, and any floor-drain condition already fixed on site.
  • Front overflow requirement, if the design calls for one.
  • The dimension drawing or marked-up elevation you are working from, even a sketch with numbers is enough to start.

Where a countertop material has already been chosen, tell us what it is. Cut-out geometry, edge polish and the support detail differ between stone, engineered stone and laminated tops, and we would rather price the correct detail than revise later. Our Santerson Stone & Marble Surfaces page lists the surface options we work with on basin and counter combinations.

Finish, quantity and the schedule

State the finish you want for the basin and whether it must match other sanitaryware or cabinetry in the same project. Then give a realistic quantity picture: total sets per room type, any split by size, and how the delivery is phased. A villa with three bathrooms and a small block of serviced apartments are quoted differently even with the same bowl, because batch size and phasing drive production planning.

Include your required site date and, if you know it, the vessel and freight plan you have in mind. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery, so we can price the basin packed for the route you intend to use rather than for a generic export carton. If your programme has an installation window, say so — fragile sanitaryware needs a packing specification matched to how it will be handled on site.

Tell us who is installing

Quote requests often stop at delivery, and that is where cost surprises appear. Confirm whether the goods are priced to the port, to your warehouse or to the completed bathroom, and whether you want installation support. Our installation and after-sales support service covers on-site installation, inspection and snag lists, warranty coverage, spare parts and ongoing maintenance; tell us the destination country and we will confirm what applies to your project before it goes into the quotation.

Please note: dimensions, materials, countertop fit and installation requirements for each Santerson Undermount Basin configuration are confirmed with your drawings at quotation stage. We do not publish a single standard size for this product, and any specification on a data sheet is verified against your project before production.

What a complete RFQ looks like

Item to supplyWhy it changes the price
Project name, room types and set quantitiesSets batch size, production planning and packing specification
Counter width, depth and thickness; cut-out and inset marginDetermines basin size, cut-out detail and support method
Tap type and hole position; waste and trap arrangementAdds or removes drilling, offsets and trap components
Countertop material and edge detailCut-out geometry, polish and fabrication labour differ by material
Finish requirement and any matching itemsAffects tooling/finish run and whether other sanitaryware is bundled
Delivery term (port, warehouse or site) and phasingFreight mode, packaging grade and number of shipments
Installation and after-sales expectationAdds site supervision, snagging and spare-parts provision
Drawings, marked-up elevations or a photo of the existing conditionRemoves guesswork; avoids re-quote and re-cut costs later

If an undermount is not the right detail

Some designs read better with the bowl sitting on the counter, and some want the vanity and top built as one piece. Send us the same information set for a Santerson Vessel Basin (Above Counter), or for a shared Santerson Double Basin Countertop in a main bathroom, and we will quote the option that suits the drawings rather than pushing one detail. If you are still setting out the room, our custom and OEM service covers design and prototyping, bespoke finishes and material selection, so the basin can be specified around the counter instead of the other way round.

Send your drawings, quantities and destination to SANTERSON — a China-based furniture and building materials manufacturer supplying residential and hospitality projects worldwide — and we will return an itemised quotation for the basin, countertop interface and delivery method you have chosen.