A backlit wall looks simple on a rendering and complicated on site. The glow is only as good as the cavity behind it, the wiring inside that cavity and the fix line holding the face panels. This guide walks through how we take Santerson Backlit Feature Walls from a designer's drawing to an installed wall, and exactly what we need from your drawings and site information to get there.
What the product actually is, and what it is not
Our backlit feature walls sit in the Media & TV Walls collection. They are configurable wall systems for residential and interior fit-out projects: finish, layout and dimensions are specified per project rather than chosen from a fixed catalogue size. That single sentence carries most of the coordination work, because it means the wall is engineered around your opening, not adjusted to it on site.
It also means we do not publish one standard depth, one light output or one panel size for this range. Those values are set with each project, once we know what the wall has to hide and what it has to do. Treat any figure you may have seen elsewhere as a starting point for a conversation, not a specification.
Stage 1: reading your drawing before we quote
Send us the wall as your design team drew it, and we read five things off it first:
- The face composition. How many panel modules across, where joints are allowed to fall, and whether any joint has to line up with a reveal, a door head or a piece of furniture already on the drawing.
- The screen or artwork position. If a television is going into the wall, its model changes the recess size, the venting requirement and the bracket detail. A display runs warm, and the enclosure has to breathe.
- The light intention. Even wash across the whole face, a glowing reveal around an opening, or light only inside niches and shelves. These need different construction.
- The finish. Veneer, lacquer, melamine, glass, stone-look or metal surface. Translucent and reflective faces behave very differently once something is shining at them from behind.
- The boundary conditions. Ceiling line, floor finish level, skirting or shadow gap, and how the wall meets adjacent walls.
Where a drawing shows only an elevation with no section, we ask for a section. A front view tells us what people see; the section tells us what we can actually build behind it.
Stage 2: the site information that decides the build
Drawings describe intent. Site conditions decide construction. Before production we confirm:
| Site item | Why it changes the wall |
|---|---|
| Floor-to-ceiling and wall-to-wall dimensions, measured on site | New-build substrates rarely match drawing dimensions. We build to measured sizes, not nominal ones. |
| Wall flatness and substrate type | Bowed plasterboard or masonry affects packing, fixing method and whether a framing backup is needed. |
| Existing or planned service runs | Power, data, TV cabling, downlights and switch positions all have to be routed before panels close the wall in. |
| Location of the electrical connection point | Determines driver access, cable routing and where an inspection point has to sit. |
| Room use and traffic | A family living room, a hotel lounge and a show apartment need different surface durability and access detailing. |
| Handover sequence | Whether the wall is installed before or after flooring, painting and loose furniture determines protection and joint detailing. |
For projects we handle as part of a wider package, this is where our interior design services help: space planning, layouts and 3D renderings are coordinated with production drawings, so the wall arrives compatible with what the site crew can actually fix in place.
Stage 3: lighting specification, agreed in writing
Backlighting is where a beautiful drawing and a disappointing wall usually part company. Three points settle it:
1. Light source and access
The light source, its driver and any control gear sit inside the build-up. We agree the fitting type and how it is reached for servicing before panels are fixed. A wall that cannot be opened without removing a face panel is a maintenance problem someone will blame on the joinery.
2. Output, colour temperature and control
We confirm brightness, colour temperature and switching or dimming against the room's lighting scheme, not in isolation. A backlit wall that fights the room's other light looks wrong even when the joinery is perfect. Where your lighting consultant has specified a circuit, we work to it; where they have not, we propose one and put it in writing for their sign-off.
3. Evenness of the glow
Hot spots and visible lamp points come from spacing, reflector depth and diffuser choice. We settle these details with the selected face material, because a translucent face reveals everything behind it. This is the detail we most often see left open at tender stage.
Stage 4: coordinating the wall with adjacent work
A feature wall rarely stands alone. Two coordination points matter more than the rest:
- Media and storage integration. If the backlit wall shares a run with Santerson Full Height Media Walls or integrated LED media units, panel modules, shadow gaps and door reveals should read as one system. Matching finishes across separate items is easy; matching module rhythm and joint widths is what makes the wall look designed.
- Surrounding paneling. Where the feature wall meets Wall Panel Systems, Custom Niche Paneling or concealed doors, we set the transition detail on paper before manufacture. A shadow gap, a bolection or a flush stop each gives a different result.
Stage 5: production, delivery and installation
Once drawings are signed off, the wall is manufactured to those confirmed dimensions and finishes. We then handle freight and door-to-door delivery, followed by on-site installation, inspection of the installed work against the agreed detail, and after-sales support including spare parts where needed.
On site, the order of work is deliberate: substrate check, framing and backup, first-fix cabling and light points, testing the lighting before closing up, then face panels, then final commissioning. Testing before closing up sounds obvious and is still the step most often skipped under programme pressure.
What to send us to get an accurate quotation
- Design drawings, elevations and at least one section through the wall
- Measured site dimensions and a note on substrate type
- Screen model or artwork size if it is being recessed into the wall
- Your lighting intent: even wash, reveal glow, or niche lighting, plus control preference
- Preferred finishes, with a reference sample or RAL / veneer name where you have one
- Delivery destination and your intended site programme
Common coordination failures, and how to avoid them
- Specifying the wall from a rendering alone. A render cannot show cavity depth or service routing. Ask for a section early.
- Leaving the light source to be decided on site. Whatever is unspecified at tender gets value-engineered late and looks it.
- No inspection access. Drivers fail; if reaching one means removing a panel, plan the access now.
- Assuming standard sizes. This range is made to measure, so nominal dimensions in a bill of quantities need replacing with measured ones before order.
- Ignoring adjacent finishes. A backlit wall framed by badly aligned paneling reads as poor workmanship even when the joinery is good.
Working with us on a project
We supply furniture and building materials for villa, hospitality and office projects, and coordinate custom production, logistics, installation and after-sales support as one package. For backlit feature walls specifically, the practical starting point is your drawing plus measured site dimensions: from there we confirm dimensions, finish and lighting specification with you in writing before manufacture.
Send drawings through our contact page, and we will come back with the questions that need answering before a quotation is meaningful.
Product dimensions, material options, hardware and electrical arrangements are confirmed per project. Figures shown in drawings or samples are indicative until signed off for your specific order.