A run of custom wall cabinetry that carries arched niches, a full-height hidden wardrobe, an integrated vanity and a stone bathroom countertop is one of the most detail-sensitive packages in a villa or residence project. Nothing on site can be corrected after the panels are machined and finished. Before we open tooling on a job like our Arched Niche & Full House Custom Wall Cabinet Project, the following items need to be closed out in writing between the buyer, the designer and the factory.
1. The measured drawing, not the architectural plan
Arched work amplifies every millimetre of wall error. A curved head reads as wrong at 8 mm, where a straight shelf would pass unnoticed. Confirm that the opening dimensions were taken on site after plastering and screeding, not read off a design-stage drawing.
- The finished floor level, so the niche sill heights are set from a fixed datum rather than from a slab that has not yet been screeded.
- Squareness of the wall run and the actual out-of-plumb deviation, which decides whether the arch sits parallel to the ceiling or to the floor.
- Positions of sockets, switches, data points and radiators that will be hidden behind full-height panels, and where they are relocated to.
We carry out site measurement as part of the wall-cabinet service, and the signed measured drawing is what we machine from. If a survey cannot be arranged, tell us early: the alternative is a buyer-supplied drawing with an explicit tolerance statement, and the arch radii get set slightly more generous to absorb variation.
2. The arch itself: radius, springing point and how it is built
- Radius and rise. Send the radius or the width-and-rise pair. "Arch-shaped" in a mood image is not a production dimension.
- Springing level. Where the curve starts from the vertical jamb changes the proportion of the whole wall; it must match the ceiling line and the niche heights around it.
- Construction method. A solid bent lamination, a CNC-cut frame faced with a moulded skin, or a built-up box arch behave differently in transport and on site. We state which one we are quoting, because it changes both cost and the packaging plan.
- Repeat accuracy. Where several arches appear across one wall run, ask for them to be cut from one nested file in a single batch rather than measured individually at installation.
Arch profile also travels into the rest of the house. Our arched paneled wardrobes and matching door lines use curved heads that should be coordinated with the niche geometry, otherwise the curves compete rather than repeat.
3. Panel material, wood colour and grain direction
For a full-house scheme the substrate and the surface are two separate decisions, and both need to be named on the order.
- Substrate: MDF, plywood, particleboard or a moisture-resistant board for the bathroom vanity run. The bathroom wall is where buyers most often specify the wrong core.
- Surface: wood veneer, melamine laminate, lacquer or acrylic. Veneer shows grain; lacquer on a curved arch shows any substrate imperfection, so ask what the arch core is prepared with.
- Wood colour and sheen against a physical sample under the room's own lighting, not on a screen.
- Grain direction and matching across the flush wardrobe panels. State whether the grain runs vertically on every door and whether adjacent panels are book-matched or slip-matched.
Our Natural Oak Veneer Wardrobes and the wider veneer and melamine wardrobe ranges are useful references when you want to see how a colour reads on a large flat field rather than a sample chip. Under Custom Furniture Design and Prototyping we work from 3D modelling and prototyping, with material choices spanning wood, metals, engineered stone and laminates.
4. Storage layout behind the flush panels
A seamless invisible wardrobe looks like a wall and stores whatever you plan for it. Once the carcass is cut, the interior is fixed.
- Hanging heights: short-hang double rails for shirts and folded storage versus long hang for coats and dresses.
- Drawer bank position and height off the floor, so heavy items are not at ankle level.
- Shelf spans: laminated shelf thickness must be quoted for the actual span, or specify the deflection limit you want.
- Integrated vanity table depth and drawer configuration, plus where the mirror or arched glazed panel fixes to the wall.
- Access hardware: push-open, recessed pull or profile handle. On flush panels this decides whether a shadow gap is visible.
Send us the household's actual storage list rather than a generic layout. We rebalance the interior around it before the drawing is issued for approval; see Santerson Open Display Niches and the modular wall systems when you want a mix of open display and concealed storage on one plane.
5. Lighting, electrics and the niche detail
- Recessed shelf lighting: LED strip type, colour temperature, driver location and how the driver is reachable after installation.
- Whether the strip sits in an aluminium channel with a diffuser, which controls whether you see individual diode dots on a pale back panel.
- Wiring route and the conduit or back-box that carries it behind the carcass, agreed before panels are fixed.
- Display load: the depth and shelf loading for ceramics and artwork, including any wall fixing needed for heavier pieces.
Lighting coordination is where a project drawing and a workshop drawing most often disagree. We reconcile them at the detailing stage rather than on site.
6. Stone, vanity and wet-area interfaces
Where the joinery meets a countertop and basin, three trades converge on one line. Confirm before production:
- Countertop material and thickness, and whether the stone is supplied by us or by a local fabricator.
- Basin type: undermount, integrated or vessel above counter. Each sets a different cutout and a different back-splash return.
- Cutout position relative to taps and waste, taken from the chosen basin template rather than an assumed centre.
- Waterproofing of the wall behind, and which board core is used in that zone.
- The joinery-to-stone joint: mitred, square, or a designed shadow gap. State it on the drawing.
The Santerson Double Vanity and integrated countertop vanity pages show the configurations we build to, including stone tops with concealed storage below.
7. Approval sequence and samples before production
For a full-house package we work through a fixed sign-off order, and each stage closes the item above it:
- Project brief and space planning with the design team.
- Furniture layout and 3D interior rendering, so the arch proportions can be judged in the room.
- Workshop drawings with dimensions, materials and finishes named line by line.
- Physical material samples: panel edge, veneer or lacquer chip, stone sample, hardware.
- Written confirmation against those samples, then production release.
The Interior Design Services page covers space planning, layouts and 3D renderings, with project design coordination covering drawings, production coordination and on-site guidance. If your own architect issues the drawings, send them at concept stage so we can flag fabrication conflicts while they are still cheap to change.
8. Packaging, delivery and installation sequence
- Packaging for curved components: arch heads need edge protection and a crate that holds them upright; flat-pack assumptions do not travel well.
- Delivery terms and who handles the last leg to floor level, especially in occupied buildings with lift restrictions.
- Site readiness date: plaster dry, floors protected, first fix electrics complete. Panels cannot go in before this.
- Installation order across the house, so a wardrobe run is not fitted before the stone top arrives.
- Snag list and handover record at completion.
As a one-stop furniture and building materials supplier, we handle the joinery, stone top, wardrobe doors, matching wall panelling and integrated lighting as one production package with one coordination point. Our Furniture Installation and After-sales Support service covers on-site installation, inspection and snagging, spare parts and maintenance.
Pre-production checklist
- Signed site-measured drawing with finished floor level as datum
- Arch radius, rise, springing level and construction method stated
- Substrate and surface finish named separately, bathroom core confirmed
- Physical samples approved under site lighting; grain direction agreed
- Interior storage layout fixed with hanging heights and drawer positions
- LED type, colour temperature, driver access and wiring route agreed
- Basin template, stone thickness, joint detail and waterproofing confirmed
- Written production release against approved samples and workshop drawings
- Crating plan for curved parts, delivery terms and site readiness date set
Send us your drawings, the arch reference image and the storage requirements, and we will return a quotation with materials, arch construction and packaging itemised — including Turnkey Villa Furnishing if the wall cabinetry is part of a wider fit-out.