A swim spa is one of the few site-furnished items that combines structural, hydraulic and electrical engineering in a single delivery. On paper, two units with similar footprints can carry very different pump counts, jet layouts and power loads. The catalogue entry for Outdoor Swim Spa WS-S38 is a useful reference point for how to read a specification sheet line by line, because it shows both what the listing states and what it leaves open for confirmation.
Start with the footprint, not the marketing name
Model codes across a swim spa range rarely follow one logic, so a shorter code does not mean a smaller unit. The WS-S38 is listed at 3760 × 2080 × 1110 mm, while other models in the same Swimming Pools and Swim Spas category run much longer: the WS-S12 is listed at 11740 × 2200 × 1470 mm, and the WS-SP500 at 5000 × 2500 × 1600 mm. Depth also varies, from 1110 mm to 1600 mm across these three.
Before comparing any two models, take the three catalogue dimensions and check them against your site in four directions:
- The clear internal area — the external shell dimension is not the water surface you can use. Ask for internal dimensions and seat positions if the listing only gives the outer box.
- Cover access — a lid needs working space above the unit, and a cover-lift mechanism changes that requirement.
- Plant and service access — pumps, filter pump and the control system sit inside the cabinet, but inspection access still has to stay clear for routine maintenance.
- Delivery route — compare the crate or unit dimensions with gates, side passages, turning radii and crane or forklift access at the point of unloading.
How the WS-S38 specification reads
The published figures for this model give a clear picture of what the standard catalogue build describes. Use them as the baseline you ask every supplier to quote against, so that comparisons are made on the same build rather than on similar photographs.
| Specification line | Catalogue value for WS-S38 | What to verify in your quotation |
|---|---|---|
| Catalogue dimensions | 3760 × 2080 × 1110 mm | Internal usable length, water depth and seat layout |
| Control system | 1 set | Controller interface, remote access and replacement availability |
| Water pump | 3 pcs | Which jets each pump drives, and the flow rate per jet group |
| Filter pump | 1 pc | Filtration cycle time and run schedule for your usage pattern |
| Jet total | 51 pcs; 6 water columns | Jet positions against the seating plan, and adjustable versus fixed jets |
| LED lights | 4 pcs; 12 small LED lights | Fixture locations, colour options and whether lighting is on a separate circuit |
| Total power | 14.05 kW | Supply capacity available on site, dedicated circuit and protection device |
| Features shown | Water jets, LED lighting, Ozone, Waterfall | Which of these are in the quoted price and which are add-ons |
| Swim training system | Not listed for this model | Whether a current or swim-jet package is available if you want lap swimming |
Two details in that table deserve particular attention. First, the 14.05 kW total power figure is a specification-sheet number for the described build; the electrical work at your site — cable size, isolation, protective device and any load-balancing with other equipment — has to be designed from the as-built configuration by a local qualified electrician, not copied from a brochure. Second, this model does not list a swim training system, while models such as the WS-SP500 do. If your brief calls for counter-current swimming rather than hydrotherapy seating, that single line decides whether you are comparing the right products.
Compare the jet and pump package against how the spa will be used
Jet counts invite easy comparison and cause most of the confusion. The WS-S38 lists 51 jets with 6 water columns driven by 3 water pumps; the longer WS-S12 lists 73 jets with 2 water pumps. Neither figure tells you how the massage feels, because jet diameter, nozzle type, air injection and position relative to the body matter more than the total.
A practical way to compare is to ask for a jet layout drawing showing every nozzle numbered against the seating plan, then check three things:
- Seating capacity versus jet coverage — do the jets actually reach each seat, or are they concentrated in one zone?
- Waterfall and water columns — confirm whether the waterfall is a separate circuit from the massage jets, since that affects pump duty and energy use.
- Hydrotherapy intent — for rehabilitation or hospitality wellness use, ask which jet groups are recommended for that purpose rather than assuming the highest count is the most therapeutic.
Treat options as part of the price comparison
Across this range, the catalogue lists optional accessories including control system upgrades, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so an option quoted for one unit is not automatically available on another.
This matters most for two items. A heat pump determines whether the spa is usable outside the warm months and drives the running-cost conversation; insulation determines how much of that heat you keep overnight. Sand filtration and UV sterilisation change the weekly maintenance routine. Ask for these as priced line items on the same quotation, so you can compare a fully configured build with a bare unit instead of comparing one supplier's base price with another's finished package.
Check delivery, installation and support scope before ordering
A swim spa is only complete once it is level, connected, filled and commissioned. SANTERSON describes an end-to-end service covering design consultation, production, logistics and door-to-door delivery, and installation and after-sales support, with freight by sea, air and rail plus customs documentation. Confirm the scope that applies to your order in writing: who prepares the base, who connects power and water, who commissions the unit, what warranty covers and how spare parts for pumps, jets and the controller are supplied later.
If the swim spa is part of a wider villa or resort fit-out, grouping it with other outdoor products usually simplifies coordination. The Outdoor Furniture range covers poolside loungers, pergolas and dining sets that sit in the same outdoor zone, and the company's Turnkey Interior Project Solutions cover project coordination across furniture and building materials. Where a spa needs to follow an unusual plan shape, the Customizable Shape Outdoor Spa page describes square, round, oval and curved configurations with an acrylic shell.
A short comparison checklist for buyer enquiries
- External and internal dimensions, plus water depth, matched to the site drawing.
- Pump count mapped to jet groups, with a numbered jet layout drawing.
- Total power figure confirmed against your available supply, with local electrical design by a qualified electrician.
- Every optional item — heat pump, insulation, UV, sand filtration, steps, cover — priced as a separate line.
- Any specification marked "not listed" resolved in writing before order confirmation.
- Delivery route, unloading method and who prepares the supporting base.
- Commissioning responsibility, warranty terms and spare-parts availability for pumps, jets and controller.
Send your site dimensions, intended use and required options, and request a configuration sheet for Outdoor Swim Spa WS-S38 or a closer alternative from the swim spa range, with each optional accessory priced separately so the comparison is made on identical builds.