A request for quote only works when the manufacturer can price exactly what you intend to build. For made-to-measure glass doors that slide into a wall cavity, the gap between a rough enquiry and a firm quotation is usually information, not price. Below is the checklist we apply to enquiries for Santerson Glass Pocket Doors, so your first email already carries what we need to return a firm number and a realistic production schedule.
Why pocket doors need a fuller brief than hinged doors
A pocket door bundles three things into one opening: the leaf, the sliding hardware, and the wall assembly that hides both. Change one and the other two move with it. A glass leaf is heavier than a timber one, which changes the track and hanger specification. A taller opening changes the header detail and the lining needed inside the cavity. An existing masonry wall limits what can be chased in, compared with a new stud partition built around the pocket.
Our glass pocket doors are made to measure, with finish, layout and dimensions specified for each space, so we price from drawings and schedules rather than from a standard size list. A brief that answers the questions below lets us quote on the first pass. A brief that leaves them out costs one or two rounds of email before a price is possible.
1. Opening sizes, quantities and wall build-up
Send a door schedule rather than one overall figure. For each opening we need:
- Clear opening width and floor-to-ceiling height, plus the clear depth of the cavity where the leaf will stack.
- The finished opening the leaf has to cover once closed.
- Quantity per size, and the total number of sets across the project.
- Whether the wall is a new partition or an existing structure, and the wall build-up if it is known.
A marked-up plan or a plain spreadsheet with opening numbers is enough. If your drawings already carry a door schedule, send it unchanged; we work from architectural schedules on every order.
2. Glass construction, finish and frame detail
Glass carries most of the cost, so specificity here is what tightens the price. Please state:
- Glass make-up your specifier has set, for example toughened or laminated, and the total thickness.
- Finish: clear, low-iron, tinted, frosted, reeded or printed, and whether both faces of the leaf should match.
- Frame detail: a slim metal frame in a chosen colour, a concealed frame, or a frameless leaf fixed through ironmongery.
- Any fire, acoustic or impact requirement in your specification. Quote the clause instead of paraphrasing it.
If those choices are not settled yet, say so and give us a budget band instead. We can then price two or three build-ups side by side, so the decision is taken on cost rather than guesswork.
3. Hardware, ironmongery and how the leaf moves
- Single or double sliding leaves, and whether one leaf stacks behind the other or both run in separate pockets.
- Soft-close, push-open or a handle detail. Recessed pulls keep a glass face clean but have to be cut into the leaf.
- Track and hanger load rating matched to the finished leaf weight, which is why glass make-up and size come first.
- How the hardware will be reached for adjustment after handover, especially once the wall is finished.
Where an opening needs a door that sits flush with the wall but cannot be given a cavity, we usually price Santerson Flush Sliding Doors or Santerson Decorative Concealed Doors alongside the pocket option, so buyers comparing systems receive both figures in one quotation.
4. Interfaces and site conditions
The costly surprises on sliding door packages come from interfaces nobody recorded. Include:
- Floor finish at the threshold, and whether the bottom guide sits in the finish or in the structural slab.
- Ceiling and skirting details where the leaf passes, and who supplies the architrave or shadow gap.
- Which trade forms the opening, builds the pocket and makes good after installation.
- Services running through the cavity that the pocket has to avoid.
5. Commercial terms, delivery and phasing
| Item to state in your RFQ | Why it changes the quotation |
|---|---|
| Project location and delivery address | Packaging, container loading and freight are worked out per site, not per door. |
| The Incoterms you want quoted | Ex-works, FOB and delivered prices differ materially; ask for the basis in writing. |
| Required delivery date and phasing | Made-to-measure doors must arrive after wet trades and before floor finishes are laid. |
| Packing and inspection requests | Crate type, crating marks and pre-shipment inspection each carry a cost. |
| Payment terms and purchase order process | Sets out how later changes to the schedule will be handled and priced. |
Our furniture logistics and door-to-door delivery service covers freight forwarding, customs paperwork and container loading. If you want a delivered price rather than an ex-works one, give us the port or site address and we will quote on that footing.
6. Drawings, samples and the approval route
Attach what you already hold: door schedule, relevant elevations and sections, and any detail drawing for the pocket assembly. Tell us how many approval stages your client requires and who signs each one off. Where a finish or glass build-up has to be seen before sign-off, sample confirmation can be combined with custom furniture design and prototyping, which shortens the distance between shop drawings and production release.
An RFQ structure you can copy directly
- Project name, location, and your role: contractor, designer or developer.
- Door schedule: opening number, quantity, width, height, cavity depth.
- Glass make-up, finish, frame detail, and performance clauses quoted from the specification.
- Hardware preference, and single or double leaf arrangement.
- Interface notes: threshold, architrave, framing trade, services in the cavity.
- Required delivery date, address, preferred Incoterms, payment terms.
- Attachments: drawings, schedule, and reference images of the look you want.
Other pages worth reading before you send an enquiry: Windows and Doors for the full door range, Santerson Wood Veneer Pocket Doors where a timber face is preferred, and Santerson Wooden Sliding Doors where the leaf stays on the wall face. If doors are only part of a larger package that includes joinery, panelling or cabinetry, our turnkey interior project solutions cover design coordination, production and site support across those trades.