A swim spa is easy to specify on its own and easy to lose inside a large materials schedule. The unit arrives as one crate, but it carries power, water, drainage, structure and finishes decisions that touch several other trades. This guide uses the Outdoor Swim Spa WS-PC02 to show how a single hydrotherapy item should be broken down, sequenced and priced so that it sits cleanly in a whole-project schedule alongside cabinetry, flooring, outdoor furniture and bathroom ceramics.

Why the swim spa belongs in the main schedule, not an appendix

Project owners usually treat the spa as a piece of equipment to be dropped in late. In practice it behaves more like a wet room. The shell sits on a slab or deck structure, it needs a dedicated electrical run, it must connect to drainage and, depending on the setting, it has to be reached by a crane or forklift before surrounding finishes are completed.

When the spa is scheduled separately from the rest of the fit-out, three problems recur: the electrical contractor sizes the wrong circuit, the paving contractor closes the deck before access is confirmed, and the procurement team discovers that optional equipment was never quoted. As a furniture and building materials supplier working on villa and hospitality packages, we see more delay caused by missing interface notes than by the product itself.

Step 1: carry the catalog data into the schedule as a reference, not a fixed order

The first line in the schedule should reproduce what the catalog states, so that quantity surveyors, designers and site teams are all reading the same figures. For WS-PC02 the published catalog data is:

Schedule fieldCatalog entry for WS-PC02
ModelWS-PC02
Catalog dimensions3000 x 3000 x 1050 mm
Jet total60 pcs
Water pump / filter pump2 pcs / 1 pc
Control system1 set
LED lights1 pc
Total power (catalog)7.35 kW
Features shownWater jets, LED lighting, Ozone
Swim training systemNot listed for this model

Catalog figures describe the standard configuration. Confirm the equipment list and electrical requirement for the exact specification you order before any figure is locked into a contract sum.

Step 2: split the item into base unit, options and interfaces

One line item hides three different procurement responsibilities. Split the spa in your schedule so that each part has its own owner, date and cost code.

  • Base unit. Shell, jets, pumps, control system and lighting as supplied by the manufacturer.
  • Options. The catalog lists control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps as possible accessories. Availability and compatibility vary by model, so each option needs its own row with a yes or no decision against it, confirmed with the manufacturer before ordering.
  • Site interfaces. Slab or plinth, waterproofing, power supply and protection devices, drainage, access for delivery, and any surround decking or paving. These are local works and must be scheduled against the local contractor, not the supplier.

The distinction matters at tender stage. A heat pump changes the electrical load; insulation changes how the unit performs in a cool climate; sand filtration changes the plant space required next to the spa. Deciding those items after the deck is built is expensive, so schedule them as decisions with dates rather than as open questions.

Step 3: set the sequence against the surrounding trades

insert these dependencies into the programme before ordering:

  • Layout freeze. Confirm the 3000 x 3000 mm footprint plus clearance for steps, maintenance access and any cover mechanism. Poolside paving levels must be set after that decision, not before.
  • Power first pass. The electrical contractor needs the confirmed equipment list to size the circuit, run the supply and place the isolator. Do this before plastering or paving closes the route.
  • Drainage and plinth. Local works are completed and inspected before the crate arrives on site.
  • Delivery window. Book the spa so it lands after the plinth is ready but before final finishes around it, so handling equipment can cross the area.
  • Commissioning. Fill, test jets, verify the control system and check lighting before handover paperwork is signed off.

Step 4: coordinate the spa with the rest of the outdoor package

A swim spa rarely stands alone. It sits within a poolside scheme that also includes loungers, dining sets, pergolas and storage for towels and chemicals. Coordinating those items in the same schedule avoids two common errors: finishes that clash between the spa surround and the furniture, and paving levels that block drainage to the spa area.

Because SANTERSON supplies outdoor furniture, interior fixtures and building materials in one package, the same specification sheet can carry the spa, the poolside seating, the pergola structure, the adjacent wall cladding and the bathroom fit-out that serves the changing area. That single reference point keeps colour, material and level decisions consistent across the wet zones.

If the design calls for a different footprint or a custom hydrotherapy layout rather than a catalog model, Customizable Shape Outdoor Spa - Personalized Hydrotherapy Pool covers shaped and personalised configurations. For longer lap-style layouts, see the Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool. Both should be scheduled using the same base-unit, options and interfaces structure described above.

Step 5: document what is supplied and what is not

The single most useful column you can add to a materials schedule is a responsibility marker. For each swim spa row record: supplied by the manufacturer, supplied by a local contractor, or to be decided with a named date. Then attach three documents to that row before ordering:

  • The confirmed equipment and options list for the exact configuration.
  • The electrical requirement as stated for that configuration, issued to the electrical contractor in writing.
  • A dimensioned setting-out drawing showing the unit, access route, steps and maintenance clearance.

Read the schedule row for a swim spa the same way you read a joinery or tiling item: dimensions, dependencies, responsible party and decision date. That is what keeps a hydrotherapy item from becoming a late variation.

A short checklist before the spa line is approved

  • Catalog dimensions transcribed, with clearance and access added separately.
  • Options decided: heat pump, insulation, UV sterilization, sand filtration, steps.
  • Electrical load confirmed against the final equipment list, not the catalog default.
  • Local works identified and priced by the correct trade.
  • Delivery window aligned with slab completion and before surrounding finishes.
  • Poolside furniture, pergola and adjacent finishes scheduled in the same package for material and level consistency.

If you are assembling a villa or hospitality package that includes a swim spa together with outdoor furniture, cabinetry, bathroom ceramics and wall or ceiling finishes, send us the drawing set and we will return a specification for the exact configuration, including interface notes for your main contractor.