A set of Santerson Glass Shelves looks simple on a drawing: a few cut panels, some brackets, a finish schedule. In transit it becomes one of the more fragile line items in a container. Glass panels travel with edges that chip on impact, surfaces that scratch against packing material, and hardware that can score a polished face if it shifts in the sea container. The difference between a clean handover and a re-order comes down to what you agree before production starts, not what happens after the container is loaded.

This guide walks through the sequence we follow for international project orders of glass shelving: specification lock-down, packaging, freight choice, customs documents, receiving inspection and the installation window. Use it as a checklist when you place a project order with a one-stop furniture and building materials supplier.

1. Lock down the specification before the cutting list is issued

Glass shelving is made to order. Our bathroom and open-shelving ranges are configured per project, so dimensions, glass type, edge finish and bracket style all need to be fixed in writing before the cutting list goes to production. Confirm these items on the purchase order:

  • Panel size and thickness for each shelf, with the wall or cabinet it fixes to, plus clearances at skirting, handles and light switches.
  • Glass specification and edge treatment — polished arris or mitred edge — because an unfinished edge is where a chip starts.
  • Load expectation for each shelf position, so the glass specification and bracket spacing are confirmed for that use rather than taken from a catalogue figure.
  • Bracket, fixing and finish selection, matched to the wall build (masonry, timber stud, tile over plasterboard) shown on your latest setting-out drawing.
  • Quantity per room or floor, plus spares for high-traffic guest bathroom floors.

Anything you change after the panels are cut and toughened is a new order, not an amendment. If your joinery or tiling package is still moving, send the drawing revision that will actually be built and let us work from that single version.

2. Packaging: how glass shelving is prepared for ocean transit

Glass travels in its own handling group inside the container, separated from cabinetry, ceramics and lighting. For a project order we prepare the panels as follows:

  • Each panel interleaved with protective facing, edges protected, then stood vertically in a timber crate — glass travels on edge, never flat.
  • Crates braced and blocked so no panel takes the load of another during rolling at sea.
  • Every crate marked with room or floor code and shelf position, so the site team can put each crate where it belongs instead of opening everything.
  • Brackets, fixings and gaskets bagged by room and packed in a separate labelled box inside the crate.
  • Photographs of the loaded crates before the doors close, so any later damage claim has a starting point.

Tell us early if your site cannot take timber crates — some apartment towers and hotel refurbishments restrict crate carriage to the service lift, and in that case we plan smaller handling units that fit the lift and the corridor turn.

3. Choosing the freight mode for a shelving order

Our furniture logistics and door-to-door delivery service arranges forwarding by sea, air or rail, and the mode usually depends on volume and how the shelving fits with the rest of your order.

SituationUsual approach
Shelving shipped together with cabinetry, wardrobes or fit-out joineryShared sea container. Glass crates loaded last and on the floor of the door end, so they come off first and are not unloaded through other cargo.
Small project order or a top-up after site measurementGrouped load with your other items, or air freight for a short list of panels where the schedule cannot wait for a sailing.
Replacement panel after damage on siteSingle-panel re-production. Confirm which specification version applies before it is cut, so the replacement matches what was installed.

If you want a shipment quoted, send the room list and quantities with your delivery location; we will tell you whether the order fits with the rest of your project cargo or needs its own crate line. Cargo insurance is available for these consignments — declare the value of glass items honestly, since they are the parts most likely to need a claim.

4. Documents that must match the goods

We prepare commercial invoices, packing lists, certificates of origin and the import paperwork your customs broker asks for. The single most common delay we see is a packing list that does not match what is actually in the crate. For glass shelving orders specifically:

  • Crate count on the packing list equals the crates that arrive — recount if any handling unit was re-packed at origin.
  • Descriptions state "glass shelving, fragile, this side up" so the terminal and the site crew handle it accordingly.
  • Values are declared per line, which keeps an insurance claim or a partial replacement straightforward.
  • Your broker receives the documents before the vessel arrives, not after.

Import terms, duties and any product requirements at your port are set by the destination authority, so confirm them with your broker for each shipment. We supply the paperwork on our side; the clearance decision is theirs.

5. Receiving inspection: do this before the crew leaves the dock

Open at least one crate per shelf type in front of the delivery driver and record what you find:

  • Photograph each damaged panel in its crate, with the crate number visible, before removing it.
  • Note edge chips and scratches on the receiving note; a clean signature closes off the claim.
  • Check bracket and fixing sets against the room list — missing hardware is fixable by air courier, glass is not.
  • Keep damaged panels and their packing until the replacement specification is agreed.

Send us those photographs and the crate numbers the same day. With the room code on each crate we can identify which shelf position was affected and re-produce against the specification that was originally cut, rather than starting a new specification from scratch.

6. Installation window and site conditions

Glass shelving should be one of the last items installed in a bathroom or wet area. Fix it after tiling, paint, mirror and lighting positions are complete, and after the wall build behind each fixing point is confirmed on site. Our installation and after-sales support covers on-site fitting, inspection with snag lists and spare parts supply; for a project order we agree in advance which positions our team fixes and which your local tradesman sets out.

Practical rule: if the setting-out drawing is older than the last site revision, do not install. Re-measure the wall, confirm fixing centres against the actual tile line, then mark the panels before drilling.

Ordering checklist

  • Specification, dimensions and glass type confirmed in writing against the current drawing revision.
  • Crate marking by room code agreed before packing.
  • Freight mode chosen with your schedule and the rest of your project order in mind.
  • Documents issued to your broker ahead of arrival.
  • Receiving inspection protocol agreed with your site team.
  • Fixing scope split between our installers and your tradesman confirmed before the shelving arrives.

Send us the room schedule, quantities and delivery location for your glass shelving order and we will return a packing plan, a freight recommendation and a document list you can hand to your broker.

Talk to us about a project order of glass shelving — SANTERSON, China-based manufacturer and one-stop supplier for furniture and building materials. Contact: PHILLIP, Phone/WhatsApp +86-13928214007, Email santerson@qq.com.