A wall mounted open wardrobe looks simple on a drawing: uprights, shelves, a hanging rail, no doors. That simplicity is exactly why it goes wrong in production. Nothing hides uneven walls, no door leaf absorbs an out-of-square corner, and every dimension you specify has to arrive matching the site condition months later. Before we release your open wardrobe run to production, here is what we ask buyers, contractors and designers to sign off.
1. The wall itself, not just the wardrobe size
A wall mounted unit carries its own weight plus hanging garments into the substrate, so the wall is part of the specification. Before we produce anything, we need from your side:
- Wall build-up and fixing substrate — solid masonry, blockwork with a cavity, stud partition with timber or steel framing, or an existing finished surface. Fixing type and embedment depth follow from this.
- Finished floor level and finished wall face. Please send levels taken on site after plastering and flooring are complete, not design-stage nominal dimensions.
- Squareness and plumb of the wall and any return corner. Where the wall is out, tell us whether you want the unit scribed to the wall or a shadow gap kept — these two decisions change the carcass cut list.
- Position of switches, sockets, skirting, radiators, downlights and any insulation or vapour barrier behind the fixing line, so we can avoid drilling into them.
Our wall mounted open wardrobes are made to measure for each project, so these site figures are what we work from. If your team can supply a survey with levels and a marked fixing line, the drawings come back fast.
2. Internal layout: plan it around what is actually stored
Open wardrobes show everything, so an unplanned layout becomes a visible problem the day the client moves in. We ask you to confirm the hanging split before we draw the carcass:
- Long-hang zone for coats, dresses and ironed shirts, with the rail height you want.
- Double-hang for shorter garments, which needs two rails and clear space between them.
- Shelf depth and spacing — folded knits need less depth than bags or boxes; shelf spacing should follow the tallest item, not a default grid.
- Drawer zones and their height, if drawers sit under open bays rather than behind a door.
- Lighting: recessed rail lights, side-panel strips or surface fittings, plus where the transformer and switch end up. Cable routes must be agreed before panels are machined.
Where a project needs storage built into the bedroom fabric rather than fixed to one wall, our custom minimalist bedroom wardrobe range covers internal layouts with hanging areas, drawer zones and shelf storage in made-to-measure sizes.
3. Materials and finish — the part that decides cost and lead time
Open wardrobes have no door to carry the design, so the board and edge detail are the whole appearance. Confirm these before we quote:
- Board substrate for carcass and shelves, and the load expectation for long unsupported shelf spans.
- Surface finish — laminate, veneer, lacquer or paint — and whether the visible panel faces match other joinery in the project.
- Edge treatment on all four visible sides. In an open unit every edge is on show; tell us if you want a matching ABS edge, a solid timber lipping or a shadow reveal.
- Hardware: rail diameter and material, bracket style, shelf-pin spacing, and whether brackets are exposed as part of the look or concealed.
- Colour and grain samples for approval. Please approve on physical samples rather than a screen file; veneer and wood-effect finishes read differently under warm bedroom lighting.
Our custom and OEM service covers bespoke finishes, textures and prototyping, so where a project needs a finish matched to existing cabinetry, send us the reference sample or an approved specification.
4. Interface with neighbouring finishes
An open wardrobe rarely stands alone. Decide who supplies and installs each junction, otherwise gaps appear at handover:
- Floor junction — skirting removed or scribed around, and the floor finish laid before or after installation.
- Ceiling junction — full-height to slab, or a header with a reveal for ceiling movement.
- Adjacent wall panelling or joinery. If the wardrobe is meant to read as one surface with wall panel systems, we need the panel module and trims coordinated from the same drawing set.
- Paint touch-up responsibility after fixing, and who protects the unit during the rest of the site programme.
5. Packaging, delivery sequence and installation access
For projects outside China, confirm these before production starts:
- Delivery address and the receiving party, plus who handles customs clearance on your side.
- Packaging format — flat-packed panels with numbered cartons or assembled modules — and whether the pack list must match your own site documentation.
- Access at the property: lift dimensions, stair widths, corridor turns and floor-protection requirements. Long uprights and full-height panels are the parts that fail this check.
- Fixing responsibility on site. We can supply fixing details matched to your substrate; if your crew installs, send us their confirmation of the wall build-up so the correct anchors are packed in the crate.
Our logistics and door-to-door delivery service covers freight arrangements, packaging and container loading, with tracking through to the site address.
6. The sign-off sheet we work from
| Item to confirm | Who confirms |
|---|---|
| Wall build-up, fixing substrate and levels taken on site | Contractor / client site team |
| Made-to-measure dimensions, squareness decision (scribed or shadow gap) | SANTERSON with your survey |
| Hanging, shelf and drawer layout, rail heights | Designer / end client |
| Board, finish, edge treatment, approved physical samples | Designer with SANTERSON |
| Hardware schedule and lighting cable routes | Designer / M&E consultant |
| Junction responsibility for floor, ceiling and adjacent panelling | Main contractor |
| Delivery address, access route, install party | Buyer / main contractor |
Send the survey and layout decisions together and we can return production drawings for approval in one pass. Where a project combines wardrobes with other cabinetry and interior fixtures, we coordinate them as one specification so finishes and junctions match across rooms.
If you have drawings or a room dimension list ready, send them to us and we will confirm the fixing detail, material schedule and pack list for your wall mounted open wardrobe before anything goes into production.