A swim spa quotation is only as good as the brief behind it. Two buyers can both ask for "a five-metre swim spa" and receive prices that differ by a wide margin, because the shell is only part of the cost. Below is the practical information list we use when preparing a quotation for Outdoor Swim Spa WS-S06M, and it applies to almost any model in our outdoor swim and hydrotherapy range.
Start With the Site, Not the Model Number
Before we confirm a single specification, we need to know where the unit will live. An in-ground installation, a raised deck, a terrace on the second floor of a villa and a resort garden platform all create different structural, access and drainage requirements.
- Exact location and orientation. Indoor or outdoor, shaded or exposed, and which side receives prevailing wind.
- Support structure. A concrete slab, steel frame or timber deck must carry the filled weight. Tell us what exists now and what the site engineer has allowed.
- Access route for delivery. Overall dimensions of 5900 x 2200 x 1610 mm on this model determine whether a crane, a tail-lift or a manual carry is needed at the final position.
- Drainage and plant-room distance. Where the filter pump, control system and any heat pump will sit relative to the shell.
Confirm the Equipment Package You Are Actually Buying
Catalogue listings show a baseline feature set. For WS-S06M the catalogue shows water jets, LED lighting, ozone and four water columns, with 48 jets in total, two water pumps, one filter pump and one control system. Total power is listed at 6.95 kW. Treat these as the starting point of a conversation, not a fixed specification, because options change both performance and price.
| Item to confirm | Why it changes the quotation |
|---|---|
| Water pump and filter pump quantity and type | Determines running load, filtration cycle and maintenance access. |
| Jet count and jet layout | Affects massage zones, plumbing runs and pump sizing. |
| Heat pump and insulation package | The largest single driver of both purchase price and operating cost in cooler climates. |
| UV sterilisation or ozone | Chemical dosing plan for the project depends on which sanitisation route is selected. |
| Sand filtration | Needs space for the filter vessel and a backwash discharge route. |
| Steps, seating and water columns | Changes internal layout, depth of usable water and safety handrail needs. |
| LED lighting quantity and control | Affects low-voltage wiring runs and the lighting-control integration on hospitality projects. |
Tell Us How the Spa Will Be Used
Usage patterns decide which options are worth paying for. A private villa household, a hotel guest facility and a resort wellness area carry different daily run hours, bather loads and cleaning routines.
- Hours of use per day and whether the water is held at temperature around the clock or on a schedule.
- Bather profile. Adults only, families with children, or guests with limited mobility who need handrails and shallower entry.
- Therapy intent. Post-exercise recovery, hydrotherapy programmes or general leisure each point to different jet arrangements.
- Seasonal pattern. Year-round operation in a cool climate justifies insulation and heat pump capacity that a summer-only installation does not.
Decide How Far the Scope Goes
Most of our swim spa enquiries arrive as part of a wider project rather than as a standalone purchase. If you are also furnishing the surrounding terrace, poolside lounging area or adjacent bathrooms, we can quote those together so one production and shipping plan covers everything. As a one-stop furniture and building materials supplier, our turnkey scope covers design consultation, material selection, manufacturing, project coordination, delivery and installation support.
Where a project needs something the catalogue does not offer, our Custom & OEM Service handles bespoke dimensions, finishes and branding. For spaces that do not suit a rectangular shell, we also produce a Customizable Shape Outdoor Spa in square, round, oval and curved forms with an acrylic shell and structural reinforcement.
Give Us the Commercial Parameters Early
These details let us return a usable number rather than a rough estimate:
- Quantity. One unit for a private residence, or several units across guest rooms and villas at a resort.
- Destination port or site address, so we can quote door-to-door delivery instead of FOB only. Our Logistics & Door-to-Door Delivery service covers sea, air and rail freight with customs paperwork handled on our side.
- Required arrival window, including any site milestone the installation must meet.
- Incoterms preference and who is handling import clearance locally.
- Budget range. Stating it openly lets us propose a configuration that fits instead of sending a single over-specified package.
A Short Briefing Template You Can Copy
Send these eight lines and we can price the project:
- Model of interest, or "recommend a model" with your space dimensions.
- Installation type: in-ground, semi-recessed, on deck, or indoor.
- Electrical supply available at site.
- Options wanted: heat pump, insulation, UV, sand filtration, steps, water features.
- Daily usage pattern and expected bather load.
- Quantity and delivery address.
- Required delivery window.
- Other products in the same package, such as outdoor furniture for villas and resorts, bathroom fixtures or lighting.
What You Receive Back
For a properly briefed enquiry we return an itemised quotation showing the shell and equipment package, each option priced separately, plus the delivery arrangement you selected. Anything we cannot confirm from your drawings or site information is listed as an open question rather than assumed. That way, the price you approve at order stage is the price that arrives.
Send us your site plan and usage brief and we will return a configuration and quotation for Outdoor Swim Spa WS-S06M, or recommend a closer fit from our swim spa range.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com
Specifications quoted above are taken from the published catalogue entry for this model and apply to the baseline configuration. Confirm the final equipment list, electrical requirements and installation conditions for your selected package before placing an order.