A compact swim spa is easy to specify on paper and easy to get wrong on site. Before an Outdoor Swim Spa WS-PC03 leaves the factory, the finish details you confirm with the manufacturer decide whether the shell, the equipment and the surrounding enclosure arrive matching your drawings. This guide walks through the confirmation points a purchaser should close out line by line: the shell dimensions and water depth, the equipment set behind the access panel, the visible finishes, and the site conditions those finishes depend on.
Start With the Shell Footprint and Water Depth
The catalogue record for WS-PC03 lists a 3000 x 3000 x 1000 mm unit, so the third figure is the one to lock down in writing. Confirm whether that measurement describes the overall shell height or the usable water depth, because seating bench heights, jet positions and the standing line all shift with it. Ask for a dimensioned section drawing rather than a plan view, and check three things on it:
- The height of each moulded seat or bench relative to the finished water line.
- Where the overflow or skimmer line sits relative to the top edge of the shell.
- The clearance needed below the unit for the equipment bay and the drainage fall.
If the spa will sit on a deck, tile bed or plinth, confirm the finished level of that surface with your builder before the shell is crated. A unit of this depth on an unlevel base becomes obvious the moment it is filled.
Confirm the Equipment Set Behind the Access Panel
The published specification for this model lists one control system, one water pump, one filter pump, a jet total of 50 pieces including 4 water columns, one LED light and a total power figure of 2.75 kW. Treat that list as the starting point of a conversation, not an order. Equipment counts change between configurations, so ask the manufacturer to restate them against your chosen build:
| Item to confirm | Why it matters on site |
|---|---|
| Pump count and duty | Sets the electrical circuit, the noise level at the boundary and how many jet groups can run at once. |
| Jet layout and water columns | Determines whether the jets aim at the moulded seating positions or into empty space. |
| Total connected power | Your electrician needs this figure for cable sizing, protection device and any dedicated supply. |
| Ozone system | Confirms which part of water sanitisation is already included and what you still have to supply. |
| Control system interface | Menu language, mounting location, and whether the controller sits inside or outside the wet zone. |
Optional items in this product family include UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. Each one changes the plant layout, so decide them before production rather than at handover. A heat pump added after the shell is built usually means relocating equipment and revising the power supply.
Specify the Visible Finishes
The finish details that matter most are the ones a homeowner or a guest actually touches. Put each of them in the order notes:
- Shell surface. Confirm the interior colour and gloss level, and whether the bowl is a single moulded piece with no visible joint at the corners.
- Cabinet or cladding finish. Where the unit is clad, agree the panel material, colour and edge trim, plus how the access panel is concealed.
- Top edge and coping. Confirm whether the rim arrives as a finished capping or a bare edge intended to be tiled over on site.
- Jet and fitting colours. White, chrome and flush fittings read very differently once the water is in and lit.
- LED specification. The catalogue lists one fixture: confirm fixed colour or colour-changing, and which side of the shell it is serviced from.
Ask for a finish sample board, or a photograph of a unit already built to the same specification. Colour names travel badly between factories and markets, and a physical reference settles the question before production starts.
Match the Finishes to the Installation Condition
A swim spa is rarely specified alone. Where a villa or resort pool deck is being furnished in one order, the shell colour should be checked against the paving, the wall finishes and the Modern Aluminum Outdoor Dining Set & Sun Lounger at the same time, in the same light. Confirm with the manufacturer:
- Whether the insulation option is fitted to the shell base and sides, which matters where the unit sits above ground through cooler months.
- How the steps are fixed and finished, and whether they are moulded into the shell or a separate assembly.
- The overflow and drainage arrangement at the delivered level.
- Access to every service item, so a finished cabinet does not lock out the filter pump.
What to Send Before Production Is Released
- A dimensioned plan and section of the intended location, with finished floor levels marked.
- The electrical supply available on site, including voltage and circuit capacity against the 2.75 kW figure.
- Your chosen equipment list written out item by item, with each option accepted or declined.
- A finish schedule covering shell colour, cladding, coping, jet colours and LED type.
- The delivery address, access constraints, and whether lifting gear is needed to place the shell.
SANTERSON produces this swim spa family as part of a wider outdoor and interior package, so one order can cover Swimming Pools and Swim Spas, poolside furniture and the finishes around them. Their Custom & OEM Service covers bespoke material, finish and texture choices, which is where a non-standard cabinet colour or a branded control panel gets handled. Freight is arranged door to door with customs paperwork prepared by their logistics team, so the finish schedule you approve before production is the one that reaches the site.
Frequently Asked Questions
Is WS-PC03 a soaking unit or a lap-swim unit?
The catalogue record for this model does not list a swim training system, so the 3000 x 3000 mm footprint is best treated as a hydrotherapy and soaking unit. If counter-current swimming is required, ask about the longer models in the range.
Can the jet layout be changed after the order is placed?
Jet positions are set in the moulded shell, so changes after production begins are costly or not possible at all. Sign off the layout on a drawing before manufacture.
Does the ozone system replace water treatment?
Ozone is listed as a feature of this configuration but does not remove the need for routine sanitisation. Ask what treatment the manufacturer recommends alongside it, and whether UV sterilisation should be added to your build.
To confirm the finish schedule and equipment list for Outdoor Swim Spa WS-PC03 against your own drawings, send SANTERSON your plans and available power supply, and request a written configuration sheet before production is released.