A pocket door looks simple on a schedule line. It is one opening, one leaf, one finish. In practice it touches framing, wall build-up, hardware, joinery and the finishes trade, which is exactly why it turns into a variation order when nobody wrote anything down. If your project is specifying Santerson Wood Veneer Pocket Doors, the documentation you gather before purchase order decides whether the door lands flush with the wall on the first visit or in the second.

What follows is a procurement checklist, not a specification. The product page for these doors describes made-to-measure sizing with material and finish options, and asks that dimensions and selected specifications be confirmed for each project. Every number below is something your team should fill in from drawings and site measurements — we are deliberately not publishing sizes, timber species or hardware models on the client's behalf.

Start with the wall, not the door

A pocket door disappears into a cavity that has to be built, lined and then closed again. Once the wall is sheeted, corrections are demolition. So the first document set is about the opening, not the leaf.

  • Clear opening dimensions — structural width, finished height above the completed floor level, and the finished floor finish build-up for that room. Pocket doors hang from a track, so an unrecorded 15 mm of screed or tile is enough to change the door drop.
  • Wall construction type — stud cavity width, whether the pocket is a proprietary cassette or site-built framing, and who supplies and installs that frame. This is where responsibility gaps appear between the framer, the joinery supplier and the hardware supplier.
  • Services in the pocket path — electrical conduits, data runs, plumbing and air conditioning ducts that cross the cavity. Record them on a marked-up drawing and get the trades to sign it before framing.
  • Access and lining detail — how the pocket is accessed later for track adjustment or removal, and what stop trim is used at the wall face.

Document the veneer as a finish, not a colour name

Wood veneer is a natural material and it varies. A purchase order that reads only "oak pocket door" gives the factory nothing to match against, and gives your site team nothing to reject a delivery with. What holds up in a dispute is a controlled sample reference.

  • Named approved sample — record the sample code, physical sample date and who signed it off. Keep a retained copy of the physical sample on site as well as at the factory.
  • Grain direction and matching rule — state whether leaves in the same opening are book-matched, slip-matched or quarter-cut matched. This is decided at cutting, so it has to be written before panels are laid up.
  • Finish system and sheen — matt, satin or high gloss, plus the lacquer or oil system. The site's Wood Veneer Panels are usually specified alongside pocket doors in the same wall; if the two must read as one surface, say so explicitly and reference a single sample for both.
  • Edge and face detail — how edges are lipped, whether the leaf is double-sided veneered, and what happens at the reveal edge when the door sits in the pocket.
  • Acceptance range — agree in writing what degree of colour and figure variation is acceptable, and inspect against the retained sample rather than a photograph.

The same discipline applies across the rest of the veneer package. Wardrobes, cabinets and wall panelling in a villa project are often produced in different batches, so keep one finish schedule that lists every wood-veneer item against the same approved sample reference.

Put the hardware and interface in writing

The leaf is only part of a pocket door assembly, and it is usually the interface items that arrive late or not at all.

Item to documentWhy procurement needs it recorded
Track, hangers and load ratingHanger capacity must exceed the finished leaf weight, including veneer and any integrated handle or mirror. Record the confirmed leaf weight after the build-up is fixed.
Soft-close and bumper setFrequently quoted separately from the door and omitted from the packing list.
Handle, pull or flush pullFlush pulls cut into the veneer face and must be approved before pressing; through-spindle handles need clearance recorded.
Threshold and floor trackDecide whether the assembly is top-hung with no floor track, and confirm the finished floor level on both sides of the opening.
Acoustic or privacy expectationA pocket opening has inherent gaps at the reveal. If a performance expectation exists for the room, state it and agree the detailing — do not assume the leaf delivers it.
Ironmongery supplier splitName who supplies each item and to which package it is invoiced, so nothing falls between the joinery order and the door hardware order.

Where a pocket is not appropriate but the flush look is still wanted, the same documentation applies to the alternatives. Santerson Wood Veneer Hinged Doors and Santerson Flush Interior Doors remove the cavity but introduce their own items — hinge type, wall reveal, architrave or no architrave, and swing clearance. Comparing them on one schedule keeps the finish consistent while letting you change only the opening mechanism.

Record the sequence, because doors are made to measure

Made-to-measure means the order should follow site verification, not drawing issue. Build a short release schedule for each opening and keep it as a project record.

  • Stage 1 — drawing set: door schedule, elevations of every wall the doors sit in, and the finish schedule with sample references.
  • Stage 2 — site verification: take dimensions from the built opening with finishes at level, and record them against an opening number that matches the door schedule. Photograph each opening.
  • Stage 3 — factory shop drawings: request production drawings for approval before cutting, showing leaf size, veneer layout, edge detail and hardware positions.
  • Stage 4 — approved-for-manufacture sign-off: dated, named, and issued to the factory. Verbal changes over a call are what create the variation.
  • Stage 5 — delivery and installation plan: which openings are complete, where doors are stored on site, who installs, and when the wall closes over the pocket.

For projects sourced end to end, this fits naturally into a coordinated package rather than a standalone door purchase. The workflow described across the Turnkey Solutions service covers design and planning, production, logistics, installation and after-sales in one sequence, which means the same document set travels from shop drawing to handover instead of being rebuilt at each trade interface.

Five documents that prevent most pocket door claims

  • A numbered door schedule that ties each opening to a wall, a finish sample reference and a hardware set.
  • A site-verified dimension record, dated, with finished floor levels on both sides of every pocket opening.
  • An approved physical veneer sample, retained by both site and factory, referenced on the purchase order.
  • Approved shop drawings signed before cutting, showing veneer matching and hardware positions.
  • A written scope split naming who supplies and installs the pocket frame, track, hangers, closers and handles.

None of these are difficult. They are simply the things that are cheap to write before order and expensive to reconstruct after installation.

Send us your door schedule

Share your openings, wall build-ups and finish references and we will return made-to-measure configurations, production drawings for approval and a clear scope split for Santerson Wood Veneer Pocket Doors and the rest of your joinery package. Contact PHILLIP on +86-13928214007, or email santerson@qq.com.