A request for quote is where most bathroom procurement deals are won or lost. For a washdown one piece toilet, Modern Ceramic 1003A Toilet for Bathroom, the difference between a supplier replying with a usable price and one guessing at your requirements usually comes down to six lines of information. This guide sets out exactly what to put in your RFQ so that the quotation you receive can be compared line by line against competing offers.

Why the Same Toilet Model Produces Different Quotes

Ask three factories for a price on model 1003A and you will often receive three different numbers, not because one is cheaper, but because each supplier assumed something different about your order. Trap orientation changes tooling and packing. Order quantity moves the unit price more than any other single variable. Whether you need the item alone or matched with basins from the same series decides whether you are buying one product or coordinating a suite across several production lines.

A well written RFQ removes those assumptions. It states what you need, in what configuration, in what quantity, delivered where — and it asks suppliers to answer in the same structure so that comparison is arithmetic rather than interpretation.

The Six Items Every RFQ Must Contain

1. The Exact Model and Its Variant

Never quote a category. Name the model and the specific variant. For this product that means "1003A washdown one piece toilet", not "one piece WC". The 1003A is described as a minimalist modern, one-piece seamless design in vitreous ceramic with a glossy glaze, using washdown flushing. Those attributes matter because a quotation for a two-piece washdown unit or a wall-hung rimless unit is not a like-for-like substitute.

If your project has not fixed on 1003A yet, ask the supplier to quote it alongside comparable models in the same range. Their own catalogue of bathroom sanitary fixtures includes other washdown one piece options such as 1004A, 1051A and a gold-line 1050A, each with its own silhouette and suite partners. Requesting two or three alternatives in one RFQ lets you trade appearance against price without running a second round of enquiries.

2. Trap Type and Rough-In Dimension

This is the single most common cause of returned sanitary ware. The 1003A supports two installation types: a P-trap wall drain with an 180 mm rough-in, and an S-trap floor drain with a 250 mm rough-in. State which one your drawings call for, and state how many of each if a building mixes both — upper floors on a wall outlet, ground floor on a floor outlet, for example.

If you do not yet know which trap your site requires, say so in the RFQ and ask the supplier to flag the decision as an open item rather than picking one for you. A quotation built on an assumed rough-in is worthless once the plumbing drawings are released.

3. Quantity, Split by Delivery Phase

Give total quantity and the phasing. A hotel refurbishment ordering 400 WCs across three buildings has a very different cost structure from a villa buying 12 pieces for one bathroom group. Suppliers price on production runs and container fill, so an RFQ that shows the full quantity up front — even where only part is needed in the first phase — gives them room to hold a unit price across phases instead of repricing each shipment.

Also state whether spares are required. Hotels and managed residential buildings routinely order a percentage of extra units at handover so that maintenance replacements match the original glaze and shape rather than being substituted years later from a different batch.

4. Seat, Fittings and Accessories Included or Excluded

Spell out what must be in the box. A quotation is only comparable if every bidder prices the same contents. For each unit specify:

  • Whether a seat and cover is included, and the required material and closing action
  • Fixing bolts, wax ring or seal, and connection fittings — supplied or sourced locally
  • Filling and flushing mechanism as fitted or knocked down for separate assembly
  • Packaging standard for the shipping method you intend to use

Ask suppliers to list exclusions explicitly. Silence on a seat is not the same as a seat being included.

5. Matching Fixtures from the Same Series

Bathroom procurement rarely stops at the WC. If the same supplier can supply the basin, bidet and shower components in matching shapes and glaze, you save yourself a coordination problem later. The 1003 series includes partners such as the freestanding pedestal basin 1003S, a tapered round stand basin in vitreous ceramic with wall fixing through a back panel.

Where the project is larger than one bathroom, group ceramics, showers, lighting, cabinetry, flooring and wall or ceiling finishes into a single enquiry. A supplier already set up for bathroom fixtures for hotel projects can consolidate shipments, unify packaging and give one point of responsibility across trades — which is where multi-trade fit-outs usually go wrong when each category is bought separately.

6. Destination, Incoterms and Documentation

State the delivery address or port, the Incoterm you want priced (EXW, FOB, CIF or delivered duty paid), and the paperwork your import clearance requires: commercial invoice, packing list, certificate of origin and any permits specific to your country. Ask for the carton dimensions, total volume and gross weight with the price — without them you cannot verify the freight line of a quotation at all.

If you are sourcing for an Australian project, request that the supplier confirm import terms, duties and delivery scope for your specific site rather than relying on general statements about door-to-door coverage. Freight and customs arrangements are settled case by case, and an RFQ that asks the question in writing gets a documented answer.

Questions Worth Adding to the RFQ

Beyond pricing, these items reveal how a supplier handles custom work. SANTERSON's custom and OEM service covers bespoke finishes, private labelling and flexible minimum order quantities; asking about them in the first round tells you whether your specification is inside their normal range before you commit to a design.

  • Glaze and colour: is the glossy white finish fixed, or can colour and surface be changed at what added cost and minimum quantity?
  • Branding: can the supplier mark units or packaging with your brand for a resale programme?
  • Sample policy: how is a single evaluation unit supplied, and does its price carry into the bulk order?
  • Certification evidence: request the actual certificates for the model quoted rather than a general company statement.
  • After-sales: what happens when a damaged or defective unit is found on arrival, and how are replacements shipped?

A Simple RFQ Structure That Produces Comparable Quotes

SectionWhat to write
ProjectBuilding type, location, number of bathrooms, phase dates
ItemModel 1003A washdown one piece toilet, quantity per phase
ConfigurationP-trap 180 mm or S-trap 250 mm, split by quantity; seat specification
InclusionsSeat, fixings, mechanism, packaging standard — with exclusions listed
Matching itemsBasins or other fixtures from the same series, separately priced
CommercialIncoterm, destination, required documents, validity period of the price
Logistics dataCarton size, CBM, gross weight, container loading plan
Open itemsAnything undecided, listed as a question rather than left blank

Send that structure to every bidder. When all replies arrive in the same format, comparison takes an hour instead of a week, and any supplier who cannot answer it cleanly has already told you something useful about how they handle orders.

To request a quotation for the 1003A or to specify sanitary ware as part of a wider villa or hotel fit-out, contact SANTERSON through the contact page. Include the six items above and you should receive a quotation that can be compared directly against competing offers.