A swim spa is one of the fastest ways to add a wellness story to a hotel garden or a villa terrace, yet it is also one of the easiest line items to get wrong. Unlike a pool, it is a piece of mechanical equipment as much as a water feature: pumps, jets, filtration, lighting and controls all have to match the site conditions and the way guests will actually use them. This guide walks through how we specify the Outdoor Swim Spa WS-PC05ST on hospitality and villa projects, and what to confirm before you place an order.

Where a 5-metre swim spa makes sense

The WS-PC05ST sits at the compact end of our configurable range. With catalog dimensions of 5000 x 2400 x 1470 mm, it fits a courtyard, a rooftop deck, a resort garden plot or a villa side yard where a full swimming pool would never work. The length is enough for a continuous swim current against the built-in swim training system, while the width gives two people room to pass in the jet zone.

For hotel projects we usually place this size where wellness is an amenity rather than the destination: boutique properties, serviced apartments, gym terraces and villa suites with private outdoor space. For residential villas it suits owners who want lap-style training plus a massage area without excavating a pool basin. If your site has more room, the same family includes longer variants such as WS-PC05ST-L at 5490 x 2400 x 1470 mm, which adds swim length while keeping the same width and plant layout.

Catalog specification for WS-PC05ST

These are the figures published on the product page. Treat them as the starting point for a quotation, not as the final configuration; we confirm every item against your drawings before production.

ModelWS-PC05ST
Catalog dimensions5000 x 2400 x 1470 mm
Swim training system1 set
Control system1 set
Filter pump1 pc
Jet total6 pcs
LED lights4 pcs
Total power (catalog)6.55 kW
Features shownWater jets, LED lighting, Ozone, Swim training system

Six jets across a shell of this size is a hydrotherapy arrangement, not a full spa wall. It works well for post-workout recovery and for guests who want a short massage session, and it keeps the jet zone clear enough that the swim lane stays usable. Four LED fittings give you enough underwater light to make the unit read as a design element at night, which matters on terraces visible from guest rooms.

Options that change the quotation

The catalog lists optional accessories for this range. Which ones you need depends on climate, water source and how intensively the unit will run:

  • Heat pump — the deciding item in cooler highland or southern Australian sites, where an unheated spa becomes a seasonal product.
  • Insulation — pairs with the heat pump to hold water temperature and reduce running load on a rooftop or exposed deck.
  • UV sterilization and sand filtration — worth specifying for shared hotel use, where water quality has to hold up under frequent bathing rather than family weekends.
  • Water pump — not listed as standard on this model; confirm the swim current unit you want against your power supply before we lock the specification.
  • Steps and control system details — accessibility and plant location are set out at design stage, not on site.
A note on the 6.55 kW figure. That is the total power shown in the catalog for the base configuration. Once you add a heat pump or a different swim current unit, connected load and circuit requirements change. Send your available supply (single or three phase, breaker size, cable run) with your enquiry so we can confirm the electrical specification rather than guess it.

Site conditions to settle before ordering

Structural support. On a deck or rooftop, get the slab engineer to sign off on the wet loaded weight and point loads for the plant zone. This is the single most common delay on villa projects.

Drainage and access. Plan overflow, first fill and any future drain-down route, plus a service path wide enough to remove a filter pump without lifting the shell out.

Waterproofing and finishes. Coordinate the surround — timber decking, stone coping or tiles — with our shell dimensions on the drawings, so the frame is fully supported around its perimeter.

Local approvals. Barrier, fencing and electrical requirements differ by state and council. We supply the product documentation you need for your submission; the permit itself is your local consultant's scope.

Ordering it as part of a wider package

Swim spas rarely arrive alone. On villa and hospitality projects we normally bundle them with the surrounding outdoor furniture, pergolas and loungers, plus the interior fixtures for the same building — cabinetry, ceramics, vanities, lighting, flooring and wall finishes. That single procurement route means one drawing set, one production schedule and one container, which is far easier to manage than six separate suppliers shipping on their own timelines.

As a China furniture and building materials manufacturer, we handle the full path from design coordination through production, freight and door-to-door delivery, with installation and after-sales support afterwards. Our published project references include villa work in Sydney, Melbourne, Perth and Willoughby, so the documentation format and staging sequence will be familiar to Australian site teams.

If you are comparing this model against other sizes in the range, see the full product catalogue, or send us your plan and we will come back with a configuration and a landed quotation.

Send us your swim spa enquiry

Share the site plan, available power supply and target water temperature, and our project team will confirm the WS-PC05ST configuration for your hotel or villa. Contact SANTERSON — Phone / WhatsApp +86-13928214007 (PHILLIP), email santerson@qq.com.